C. Consumable Materials
None
E. Preliminary steps
F. Alternator
Figure 601
(4) Check:
(a) that power connector is locked in place,
NOTE
(c) cover (paintwork ; for cleanliness, cracks, dents, and loose or missing rivets).
(c) indicator lights (carry out functional test with power on),
(d) snap wire on switches on "EMERGENCY CUTOFF" bar.
(d) Check :
1 attachment of components and cable looms,
(b) Install electrical master box cover and close access panel.
(c) If corrosion is detected on the electrical master box PCBs, comply with
24-30-00-602.
I. Circuit-breaker panels
(1) Check all circuit-breakers for condition, attachment and engagement.
(2) Check identification plates for cleanliness and condition (cracks, chipping).
In particular, check the routing and clearance of the harnesses with respect to
the structure and adjacent equipment items, in the area behind the transformer
rectifiers, and to the PCB rack.
L. Main battery
(1) Check the general condition and the attachments:
(a) of the battery tray assembly,
M. Standby battery
(1) Check condition and attachment of tray.
(2) Check wirings and connector for condition.
Figure 601