1. The document lists various manufacturing projects completed between January 12, 2014 and April 30, 2015. It provides details on the quantity produced for each item.
2. While the file cabinet production project was completed, it notes the cabinets were only polished and painted.
3. The report is the 6th such report on production activities covering that time period. It provides status updates on quantities finished or still in progress for each item listed.
1. The document lists various manufacturing projects completed between January 12, 2014 and April 30, 2015. It provides details on the quantity produced for each item.
2. While the file cabinet production project was completed, it notes the cabinets were only polished and painted.
3. The report is the 6th such report on production activities covering that time period. It provides status updates on quantities finished or still in progress for each item listed.
1. The document lists various manufacturing projects completed between January 12, 2014 and April 30, 2015. It provides details on the quantity produced for each item.
2. While the file cabinet production project was completed, it notes the cabinets were only polished and painted.
3. The report is the 6th such report on production activities covering that time period. It provides status updates on quantities finished or still in progress for each item listed.
ዝርዝር 1 File cabinet 3418 polish and paint is finished 2 TVET machine Cutoff machine 63with new design Knife grinder 11 Mortizer machine 15 Mobile hydraulic machine 118 and design changed Wood circular saw 23 3 Investment Glass assembly 54 Window All are finished Lubber 54 All are finished 30 is left Main door Only cladding Finished
4 Mezanine 4 window glass are finished
First floor assembly 4 door glass assembly are finished Mezanine 8 door glass assembly are finished Second floor 16 window glass are finished assembly 5 Second floor Front glass All are finished but manila is not worked assembly 6 Customer Part 42 and 932 quantity