SAP-TO BE Process
NAWMM018
Procurement of Excisable/Non Excisable Job work
Goods
Materials Management
Ver1.0
23.09.2006
Table of Contents
1 Procurement of Excisable/Non Excisable Jobwork Materials..................................................................4
1.1 AS IS Process............................................................................................................................................4
1.2 Core to Be Process....................................................................................................................................5
1.3 Changes to Existing Organization.............................................................................................................6
1.4 Description of Improvements and Key Metrics..........................................................................................6
1.5 Notes on Further Improvements................................................................................................................6
1.6 Functional Deficit and Method to Remove That.........................................................................................6
1.7 Interface Requirement...............................................................................................................................6
1.8 System Configuration Considerations.......................................................................................................6
1.9 File Conversion Considerations.................................................................................................................6
1.10 Any reports required related to current business process.........................................................................6
1.11 Any document/output would be printed for this business process.............................................................6
1.12 Authorization Considerations.....................................................................................................................6
1.13 End User Training Requirements..............................................................................................................7
1.14 Process Flow Chart...................................................................................................................................7
TO-BE Document
Date: 23.09.2006
Version Management This Document is subject to change control. Every change of the document has to Undergo change
control procedure and has to be registered in the following table
1.1 AS IS Process
Job work
Design and Development Department of NAW commonly called D & D releases Routing
sheets specifying sequence of operations whenever a new product is to be developed.
Drawings for each operation are also released by them.
No separate material master records are created by D&D. Operational sequence numbers
are mentioned in the routing sheets.No Bill of Materials exists in NAW.
For finished products, Alpha numeric Product Codes are defined by FG Stores on the basis
of first three digits of the customer. For example TEL for Tata Motors or TAF for TAFE etc. l;
NAW would like to have a robust and scientific method of product as well as material
codification internally generated by System giving logic to each character of the code
If material is intended for the warehouse, the orderer can define a storage location for it. This storage location is then
automatically proposed by the system during entry of the goods receipt, and you can accept or change it. If no
storage location is entered in the purchase order, you have to specify a storage location when you enter the goods
receipt.
Goods receipts for the warehouse can be posted to three different stock types:
To unrestricted-use stock
To stock in quality inspection
To blocked stock
Since there will be no purchase order for job work materials, In MIGO, materials are received through movement
type 501(GR without PO).
Credit Consumption A/c (Account determination for GBBZOF for chart of account 1000 is configured to
capture this consumption A/c)
This procedure shows you how to capture an incoming excise invoice if you do not have any reference
documents.
You can also follow this procedure if you do have a material document that you want to use as a reference
document, but you want the system to cross-check the excise invoice data against other master data or
transaction data less stringently. Using T.code J1IEX. Here, we use option of capturing excise invoice
without referring to PO.
Since, there is no reference document, all entries has to be done manually. Entries in RG 23 are updated.
Invoice verification is not done and after value addition, sale is done and service charge is recovered.
Excise Officer 1
01 List of Excise Invoice (J1I7) Excise Group , internal document Excise invoice – not posted,
number Part 1 posted, Part 1and Part 2
posted, Part 1 posted but not
Part 2.
02 List of material document according Movement type and From-To Date. GR blocked Stock (MvtT) 103.
to Movement type
04 Extracting Register (J2i5) Excise Group, Posting Dates, Extracts registers according to
Register to Extract. selection criteria.
05 Printing Registers (J2I6) Excise Group, Posting Dates, Prints selected register.
Register to Print.
2 Custom Developments
Development Requirements
1.0
Print Requirements