Professional Documents
Culture Documents
Version 1.00
ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: (86) 755 26771900
Fax: (86) 755 26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution of
this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPO-
RATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATION
or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions are dis-
claimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-in-
fringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on the
information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subject
matter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee,
the user of this document shall not acquire any license to the subject matter herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
Revision History
Commissioning
Preparation
Table of Contents
Preparing Documents .......................................................... 1
Preparing Tools and Software ............................................... 1
Checking Configuration Conditions ........................................ 2
Preparing Documents
Technical documents needed include project design documents
and commissioning guide documents.
Project design documents, such as,
� XX Network Planning Solution
� XX Project Design Solution
Commissioning guide documents, such as,
� ZXMW NR8250 Commissioning Guide
� ZXMW NR8250 Microwave Acceptance Test Record
Checking Configuration
Conditions
Short Description Before single-site commissioning and inter-site commissioning, it
is necessary to check whether the equipment satisfies the com-
missioning conditions.
Checking The checking items involve the microwave equipment as well as
Single-Site the notebook PC. The single-site commissioning conditions are
Commissioning listed as below:
Conditions
� The hardware installation for the equipment is completed and
passes the installation check.
� The power supply of the equipment is ready.
� Service signal cables connecting other equipments are laid in
correct positions.
Table of Contents
Testing Power Supply .......................................................... 3
Logging in to WEB CIT ........................................................ 4
Configuration Data Query .................................................... 5
Testing E1 Cable Connection ................................................ 7
Checking Transmission Power and Transmission Fre-
quency.............................................................................. 8
Put a small strip of paper at the fan's wind outlet. If the paper
flaps, it indicates that the fan is working normally.
END OF STEPS
iv. Input the ipconfig /all command and press Enter key.
The IP address of the notebook PC is displayed, as shown
in Figure 2. For example, the notebook PC's IP address
in this example is 10.61.121.120, and IDU's IP address is
10.61.121.249, as shown in Figure 2.
Querying IP Information
Prerequisites Documents that data configuration requires are available.
Steps 1. Click Configure > System Configure in the left menu bar, as
shown in Figure 4.
END OF STEPS
Testing E1 Cable
Connection
Short Description Whether the equipment and E1 cables are connected correctly can
be decided by testing E1 cable connection. Also, this test helps
find out whether the E1 cable is normal.
Prerequisites � The equipment is configured with E1 interface board.
� The service data configuration is completed.
Steps 1. Connect E1 interface with the error bit tester. The error bit
tester displays the AIS alarm.
2. Set the corresponding E1 interface as terminal loopback
through WEB CIT.
3. Observe the error bit tester, and the AIS alarm should disap-
pear.
4. Cancel the setting of E1 interface's terminal loopback through
WEB CIT.
5. Observe the error bit tester, and the AIS alarm should be re-
ported.
6. Repeat Step 1 ~ Step 5 to test other E1 interfaces.
END OF STEPS
Checking Transmission
Power and Transmission
Frequency
Short Description This operation checks whether ODU's transmission power and
transmission frequency are within specified range.
Prerequisites The service data configuration is completed.
Steps 1. Click Configure > Link Configure in the left menu bar, as
shown in Figure 6.
Inter-Site Commission
ing
Table of Contents
Adjusting Antennas at Both Ends .......................................... 9
Testing Inter-Site STM-1/4 Service ......................................10
Testing Inter-Site E1 Service ...............................................11
Testing Inter-Site ETH Service .............................................11
Testing Inter-Site EOW Service............................................12
Testing 1+1 Changeover.....................................................12
Testing SNCP Changeover ...................................................13
Testing 24-Hour Bit Error ....................................................13
OSPF
- Open Shortest Path First