REVISED PDM DURATION IN CALENDAR DAYS (150 Calendar Days)

B.7(1) 150
OCCUPATIONAL SAFETY
AND HEALTH PROGRAM
0 150
0 150

903(1) 103
FORMS AND FALSEWORKS

18 121
18 121
S-S
2

B.5 2 902(1)a 93
PROJECT BILLBOARD/ REINFORCING STEEL F-F
SIGNBOARD (DEFORMED) GRADE 40 5
2 4 16 109
2 4 16 109 F-F
S-S S-S 3
0 12
B.3 2 B.9 2 803(1)a 20 900(7) 88 1047(1) 14 1014(1)b1 14 1003(1)a1 8 B.9 2
MOBILIZATION REINFORCED CONCRETE STRUCTURAL STEEL PRE-PAINTED METAL SHEETS CEILING DEMOBILIZATION
PERMITS AND CLEARANCES STRUCTURE EXCAVATION
(ROOF FRAMING) (LONG SPAN)
0 2 2 4 4 24 24 112 112 126 126 140 140 148 148 150
0 2 2 4 4 24 24 112 112 126 126 140 140 148 148 150

S-S
0 S-S
S-S 1
4 804(4) 25 804(1)a 3 1032(1)b 7
EMBANKMENT FROM PAINTING WORKS - WOOD
GRAVEL FILL
STRUCTURE EXCAVATION
8 33 24 27 141 148
13 38 23 26 141 148 F-S
S-S
F-S 8
4
1000(1) 25 1 804(1)b 3 1046(2)a2 72 1027(1) 20 1032(1)a 15
EMBANKMENT CHB LOAD BEARING (INC. PAINTING WORKS -
SOIL POISONING CEMENT PLASTER FINISH
FROM COMMON BORROW REINF. STEEL) 150MM MASONRY/CONCRETE
8 33 30 33 33 105 105 125 125 140
13 38 38 41 41 113 113 133 133 148
F-F
0 S-S F-S
3 1018(1) 10 1018(2) 7 3
GLAZED TILES AND TRIMS UNGLAZED TILES

128 138 138 145


131 141 141 148

F-S
S-S 6
6
1002(4) 8
PLUMBING FIXTURES

134 142
S-S 140 148
71 F-S
4
1010(2)a 10 1010(2)b 10 1007(1) 10 1009(1)a 10
DOORS (WOOD PANEL) ALUMINUM GLASS DOOR
DOORS (FLUSH) JALOUSIE WINDOWS - GLASS
(SWING TYPE)
104 114 114 124 124 134 134 144
104 118 118 128 128 138 138 148

F-S
S-S 10
67
1100(30) 10 1101(42) 8 1102(1) 12 1103(1) 10
CONDUITS, BOXES AND WIRES AND WIRING PANEL BOARD WITH MAIN LIGHTING FIXTURES
FITTINGS DEVICES AND BRANCH BREAKER AND LAMPS
100 110 110 118 118 130 130 140
108 118 118 126 126 138 138 148

PROJECT/LOCATION: SHEET CONTENTS: CAD BY: CHECKED: REVIEWED: RECOMMENDING APPROVAL: APPROVED: SHEET NO.:

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF MULTI-PURPOSE BUILDING
COMPOSTELA VALLEY DISTRICT ENGINEERING OFFICE (HEALTH CENTER) PANGUTOSAN, REVISED PRECEDENCE 1
NABUNTURAN, DAVAO DE ORO NABUNTURAN, COMPOSTELA VALLEY DIAGRAM METHOD
ROSBILL CONSTRUCTION & SUPPLY JONATHAN B. SUAYBAGUIO EDWIN L. JACOB RONALD B. CARIAGA DANIEL A. JARAVATA 2
REGION XI
(20LA0294)
CONTRACTOR PROJECT ENGINEER CONSTRUCTION CHIEF / ENGINEER III ASST. DISTRICT ENGINEER DISTRICT ENGINEER