Update Statud Pekerjaan Samakta L13 GHJ

FASE - 1 FASE - 2 FASE - 3 FASE - 4 FASE - 5

Item Pekerjaan 1320 1322 1323 1324 1325 1327 1314 1316 1317 1318 1319 1321 1308 1309 1310 1311 1312 1313 1301 1302 1304 1306 1307 1315 1303 Keterangan
KORIDOR KORIDOR
LOBBY LIFT
GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR GR PRS KEMPINSKI PULLMAN

Kabel telepon Bedside table   


Kabel data area TV   
Kabel telepon area writing desk   
Kabel Data & telepon area koridor
sisi Pullman                            Proses perapihan Conduit
Kabel Data & telepon area koridor
sisi kempinski                            sisa 2/13 tarikan

Kabel Data & telepon area lobby                            On Progress

Test fluke & Commissioning   


Ceiling Koridor Ceiling Koridor Pullman
Kempinski target target Selesai
Selesai Jumat(10/2/23) Sabtu(11/2/23)

Done

On Progress Install

Belum Test fluke & Commissioning

 Tidak Ada Pekerjaan

kabel data area writing


kabel tlp. Bedside Table kabel data area TV
desk