Professional Documents
Culture Documents
Progres m1-m6 Saluran Gansel Cco
Progres m1-m6 Saluran Gansel Cco
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 1.759 4.685
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249 0.574
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.582 1.062
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.666 0.185
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 74.00 m1 2.944 2.944
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 74.00 m1 1.209 1.209
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 111.40 m1 2.616 2.616
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 111.40 m1 1.424 1.424
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 0.340
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 95.00 m1 3.779 3.779
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 95.00 m1 1.552 1.552
RT. 07
1 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 121.60 m1 7.202 7.202
2 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 121.60 m1 3.499 3.499
3 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 46.10 m1 1.083 1.083
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 46.10 m1 0.589 0.589
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 153.20 m1 3.598 3.598
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 153.20 m1 1.958 1.958
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 35.70 m1 0.838 0.838
3 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 35.70 m1 0.456 0.456
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.00 m1 2.278 2.278
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 97.00 m1 1.240 1.240
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 60.00 m1 1.409 1.409
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 60.00 m1 0.767 0.767
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 86.00 m1 2.020 1.324 0.696
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.00 m1 1.099 0.537 0.070 0.492
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.718 5.823
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.459 94.177 100.000
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 59,639,042.00
Rp 24,494,000.00
53,004,120.00
28,852,600.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 76,563,635.00 805,933
Rp 31,445,000.00 331,000
1,136,933
Rp 145,920,000.00
Rp 70,892,800.00
21,934,380.00
11,939,900.00
72,892,560.00
39,678,800.00
16,986,060.00
9,246,300.00
46,152,600.00
25,123,000.00
28,548,000.00
15,540,000.00
40,918,800.00
22,274,000.00
2,026,091,348.00
(0.00)
2,026,091,348.000
Chart Title
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080 100.000134392409
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082
Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680 94.1809372774818
7
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 1.759 4.685
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249 0.574
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080 67.4591160685004
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.582 1.062
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.666 0.185
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 1.209
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 4.159
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 2.264
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838
RT. 06 36.6667328178667
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
3.598
RT. 07 1.958
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 1.409 1.292
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 0.767 0.342
16.8828675055611
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 1.324 0.505
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 0.537 1.614
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 1.171
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 1.959 1.808
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 1.839
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 1.407
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 0.766
2.32280996075602
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.459 94.181 100.000
1 2 3 4 5 6
Jakarta, 12 Desember 2020
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
-
-
6,851,520.00
3,729,600.00
Rp -
Rp -
-
-
32,306,820.00
17,586,100.00
Rp -
Rp -
-
-
1,452,873,861.40
0.00
2,026,091,348.000
573,217,486.60 504.179
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080 100
100.000001225249
1
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082
94.1813219766042
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 6.205 0.239
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249 0.574
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
84.6019702640068
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09 67.4595023911035
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 2.557 1.602
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 1.392 0.872
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05 41.1130417342047
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 36.6672460136942 0.838
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071 2.701
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 1.503 0.648
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 0.818 0.353
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 2.96 0.823
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 1.44 0.400
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.48115170372861
2.32337007146629 0.986 0.42
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 0.537 0.23
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587 24.045 19.028 24.461 15.398
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068 41.113 60.141 84.602 100.000
DEVIASI 0.158 0.185 4.446 (7.319) (9.578) 0.000
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080 100
100.000001225249
1
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082
94.1813219766042
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 6.205 0.239
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249 0.574
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
84.6019702640068
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09 67.4595023911035
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 2.557 1.602
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 1.392 0.872
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05 41.1130417342047
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 36.6672460136942 0.838
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071 2.701
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 1.503 0.648
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 0.818 0.353
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 2.96 0.823
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 1.44 0.400
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.48115170372861
2.32337007146629 0.986 0.42
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 0.537 0.23
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587 24.045 19.028 24.461 15.398
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068 41.113 60.141 84.602 100.000
DEVIASI 0.158 0.185 4.446 (7.319) (9.578) 0.000
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082 94.1813219766042
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 6.205 0.239
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249 0.574
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
84.6019702640068
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09 67.4595023911035
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 2.557
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 1.392
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05 41.1130417342047
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 36.6672460136942
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 1.503
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 0.818
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 2.96
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 1.44
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.48115170372861
2.32337007146629 0.986 0.42
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 0.537 0.23
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587 24.045 19.028 24.461 -
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068 41.113 60.141 84.602
DEVIASI 0.158 0.185 4.446 (7.319) (9.578)
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200 0.080
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796 0.199
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397 0.261
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323 1.241
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327 0.082
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554 1.680
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 6.205 0.239
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 0.249
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549 0.098
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
67.4595023911035
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 0.987
RT. 05 41.1130417342047
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 36.6672460136942
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 1.503
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 0.818
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.48115170372861
2.32337007146629 0.986
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 0.537
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587 24.045 19.028
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068 41.113 60.141
DEVIASI 0.158 0.185 4.446 (7.319)
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280 2.200
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994 0.796
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657 6.397
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564 1.323
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408 0.327
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234 1.554
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 6.205
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 2.549
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511 0.141
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987
RT. 05 41.1130417342047
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 36.6672460136942
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839
RT. 13 2.48115170372861
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.32337007146629
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587 24.045
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068 41.113
DEVIASI 0.158 0.185 4.446
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 0.511
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 1.381
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127 1.080
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614 0.588
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740 0.903
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 17.0682261879904
16.8832001111071
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839
RT. 13 2.48115170372861
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 2.32337007146629
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481 14.587
KOMULATIF REALISASI BOBOT MINGGUAN 2.481 17.068
DEVIASI 0.158 0.185
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
TIME SCHEDULE (KURVA S)
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kelurahan Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
WAKTU PELAKSANAAN
BOBOT MINGGU KE -
No JENIS PEKERJAAN VOLUME 1 2 3 4 5 6 Ket
PEKERJAAN
12-15 Nov 2020 16-22 Nov 2020 23-29 Nov 2020 30 Nov-06 Des 2020 07-13 Des 2020 14-20 Des 2020
A PEKERJAAN SALURAN DRAINASE (RW 01)
RT. 01
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 97.10 m1 2.280
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 103.50 m1 2.554
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.994
4 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 112.40 m1 6.657
5 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 200.60 m1 2.564
6 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 25.00 m1 0.408
7 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 112.40 m1 3.234
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 1.127
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 0.614
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 0.740
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839
2.48115170372861
2.32337007146629
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766
0
RENCANA BOBOT MINGGUAN 100.000 2.323 14.560 19.784 30.792 26.722 5.819
KOMULATIF RENCANA BOBOT MINGGUAN 2.323 16.883 36.667 67.460 94.181 100.000
REALISASI BOBOT MINGGUAN 2.481
KOMULATIF REALISASI BOBOT MINGGUAN 2.481
DEVIASI 0.158
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp - 805,933
Rp - 331,000
1,136,933
Rp -
Rp -
6,899,100.00
3,755,500.00
-
-
-
-
32,306,820.00
17,586,100.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
1,577,495,941.40
2,026,091,348.000
448,595,406.60 394.566
591.035
#REF! 30*30
#REF!
#REF! 30*40
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
Minggu ke VI (Enam)
Periode 14 Desember - 18 Desember 2020
Kontrak 39 (tiga puluh sembilan) hari kalender
Progres Rencana 100.000%
Progres Actual 100.000%
Deviasi 0.000%
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 19.50 0.458 - - 19.50 0.458 100.00
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 44.90 1.108 - - 44.90 1.108 100.00
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 162.00 6.444 - - 162.00 6.444 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 64.40 0.823 - - 64.40 0.823 100.00
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 162.00 2.647 - - 162.00 2.647 100.00
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 51.00 1.198 - - 51.00 1.198 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 51.00 0.652 - - 51.00 0.652 100.00
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 86.40 2.132 - - 86.40 2.132 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 86.40 1.104 - - 86.40 1.104 100.00
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 58.00 1.431 - - 58.00 1.431 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 58.00 0.741 - - 58.00 0.741 100.00
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 108.00 2.665 - - 108.00 2.665 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 108.00 1.381 - - 108.00 1.381 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 94.00 2.207 - - 94.00 2.207 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 94.00 1.202 - - 94.00 1.202 100.00
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 66.60 1.644 - - 66.60 1.644 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 66.60 0.851 - - 66.60 0.851 100.00
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 68.80 2.737 - - 68.80 2.737 100.000
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 68.80 1.124 - - 68.80 1.124 100.000
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 108.90 2.557 68.20 1.602 177.10 4.159 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 108.90 1.392 68.20 0.872 177.10 2.264 100.000
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 77.20 1.813 - - - 1.813 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 77.20 0.987 - - - 0.987 100.000
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 26.60 0.656 - - 26.60 0.656 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 26.60 0.340 - - 26.60 0.340 100.000
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - 51.30 2.041 - 2.041 100.000
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - 51.30 0.838 - 0.838 100.000
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - 48.90 1.945 - 1.945 100.000
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - 48.90 0.799 - 0.799 100.000
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 14.50 0.341 - - - 0.341 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 14.50 0.185 - - - 0.185 100.000
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - 14.40 0.853 - 0.853 100.000
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - 14.40 0.414 - 0.414 100.000
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 134.70 3.163 - - 134.70 3.163 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 134.70 1.722 - - 134.70 1.722 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 33.70 0.791 - - 33.70 0.791 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 33.70 0.431 - - 33.70 0.431 100.000
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - 67.90 2.701 67.90 2.701 100.000
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - 67.90 1.109 67.90 1.109 100.000
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 77.90 1.829 - - 77.90 1.829 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 77.90 0.996 - - 77.90 0.996 100.000
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 64.00 1.503 27.60 0.648 91.60 2.151 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 64.00 0.818 27.60 0.353 91.60 1.171 100.00
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 50.00 2.961 13.90 0.823 63.90 3.785 100.000
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 50.00 1.439 13.90 0.400 63.90 1.839 100.000
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 59.90 1.407 - - 59.90 1.407 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 59.90 0.766 - - 59.90 0.766 100.00
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
NAMBAH
KURANG
46,200,180.00
51,750,000.00
20,148,325.00
134,880,000.00
51,955,400.00
8,275,000.00
65,529,200.00
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
Minggu ke V (Lima)
Periode 07 Desember - 13 Desember 2020
Kontrak 39 (tiga puluh sembilan) hari kalender
Progres Rencana 94.181%
Progres Actual 84.602%
Deviasi -9.579%
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 19.50 0.458 - - 19.50 0.458 100.00
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 - - 44.90 1.108 44.90 1.108 100.00
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 162.00 6.444 - - 162.00 6.444 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 19.50 0.249 44.90 0.574 64.40 0.823 100.00
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 162.00 2.647 - - 162.00 2.647 100.00
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 51.00 1.198 - - 51.00 1.198 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 51.00 0.652 - - 51.00 0.652 100.00
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 86.40 2.132 - - 86.40 2.132 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 86.40 1.104 - - 86.40 1.104 100.00
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 58.00 1.431 - - 58.00 1.431 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 58.00 0.741 - - 58.00 0.741 100.00
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 108.00 2.665 - - 108.00 2.665 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 108.00 1.381 - - 108.00 1.381 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 94.00 2.207 - - 94.00 2.207 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 94.00 1.202 - - 94.00 1.202 100.00
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 66.60 1.644 - - 66.60 1.644 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 66.60 0.851 - - 66.60 0.851 100.00
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 - - 68.80 2.737 68.80 2.737 100.000
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 - - 68.80 1.124 68.80 1.124 100.000
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 - - 108.90 2.557 108.90 2.557 61.491
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 - - 108.90 1.392 108.90 1.392 61.491
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 77.20 1.813 - - - 1.813 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 77.20 0.987 - - - 0.987 100.000
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 - - 26.60 0.656 26.60 0.656 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 - - 26.60 0.340 26.60 0.340 100.000
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - - - - - -
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 14.50 0.341 - - - 0.341 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 14.50 0.185 - - - 0.185 100.000
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - - - - - -
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 134.70 3.163 - - 134.70 3.163 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 134.70 1.722 - - 134.70 1.722 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 - - 33.70 0.791 33.70 0.791 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 - - 33.70 0.431 33.70 0.431 100.000
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - - - - - -
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 - - 77.90 1.829 77.90 1.829 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 - - 77.90 0.996 77.90 0.996 100.000
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 64.00 1.503 - - 64.00 1.503 69.87
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 64.00 0.818 - - 64.00 0.818 69.87
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 - - 50.00 2.961 50.00 2.961 78.242
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 - - 50.00 1.439 50.00 1.439 78.242
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 42.00 0.986 17.90 0.420 59.90 1.407 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 42.00 0.537 17.90 0.229 59.90 0.766 100.00
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
NAMBAH
KURANG
46,200,180.00
51,750,000.00
20,148,325.00
134,880,000.00
51,955,400.00
8,275,000.00
65,529,200.00
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
Minggu ke IV (Empat)
Periode 30 November - 06 Desember 2020
Kontrak 39 (tiga puluh sembilan) hari kalender
Progres Rencana 67.459%
Progres Actual 60.141%
Deviasi -7.318%
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 - - 19.50 0.458 19.50 0.458 100.00
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 156.00 6.205 6.00 0.239 162.00 6.444 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 - - 19.50 0.249 19.50 0.249 30.28
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 156.00 2.549 6.00 0.098 162.00 2.647 100.00
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 51.00 1.198 - - 51.00 1.198 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 51.00 0.652 - - 51.00 0.652 100.00
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 86.40 2.132 - - 86.40 2.132 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 86.40 1.104 - - 86.40 1.104 100.00
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 58.00 1.431 - - 58.00 1.431 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 58.00 0.741 - - 58.00 0.741 100.00
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 108.00 2.665 - - 108.00 2.665 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 108.00 1.381 - - 108.00 1.381 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 94.00 2.207 - - 94.00 2.207 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 94.00 1.202 - - 94.00 1.202 100.00
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 66.60 1.644 - - 66.60 1.644 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 66.60 0.851 - - 66.60 0.851 100.00
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 - - - - - - -
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 - - 77.20 1.813 - 1.813 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 - - 77.20 0.987 - 0.987 100.000
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - - - - - -
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 - - 14.50 0.341 - 0.341 100.000
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 - - 14.50 0.185 - 0.185 100.000
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - - - - - -
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 - - 134.70 3.163 134.70 3.163 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 - - 134.70 1.722 134.70 1.722 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - - - - - -
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 - - - - - - -
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 - - 64.00 1.503 64.00 1.503 69.87
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 - - 64.00 0.818 64.00 0.818 69.87
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 - - - - - - -
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 - - 42.00 0.986 42.00 0.986 70.12
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 - - 42.00 0.537 42.00 0.537 70.12
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
NAMBAH
KURANG
46,200,180.00
51,750,000.00
20,148,325.00
134,880,000.00
51,955,400.00
8,275,000.00
65,529,200.00
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 - - - - - - -
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 - - 156.00 6.205 156.00 6.205 96.30
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 - - - - - - -
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 - - 156.00 2.549 156.00 2.549 96.30
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 51.00 1.198 - - 51.00 1.198 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 40.00 0.511 11.00 0.141 51.00 0.652 100.00
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 86.40 2.132 - - 86.40 2.132 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 86.40 1.104 - - 86.40 1.104 100.00
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 58.00 1.431 - - 58.00 1.431 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 58.00 0.741 - - 58.00 0.741 100.00
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 108.00 2.665 - - 108.00 2.665 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 108.00 1.381 - - 108.00 1.381 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 94.00 2.207 - - 94.00 2.207 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 94.00 1.202 - - 94.00 1.202 100.00
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 66.60 1.644 - - 66.60 1.644 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 66.60 0.851 - - 66.60 0.851 100.00
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 - - - - - - -
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 - - - - - - -
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - - - - - -
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - - - - - -
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 - - - - - - -
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - - - - - -
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 - - - - - - -
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 - - - - - - -
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 - - - - - - -
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
NAMBAH
KURANG
46,200,180.00
51,750,000.00
20,148,325.00
134,880,000.00
51,955,400.00
8,275,000.00
65,529,200.00
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
Minggu ke II (Dua)
Periode 16 November - 22 November 2020
Kontrak 39 (tiga puluh sembilan) hari kalender
Progres Rencana 16.883%
Progres Actual 17.068%
Deviasi 0.185%
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 - - - - - - -
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 - - - - - - -
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 - - 51.00 1.198 51.00 1.198 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 - - 40.00 0.511 40.00 0.511 78.43
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 - - 86.40 2.132 86.40 2.132 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 - - 86.40 1.104 86.40 1.104 100.00
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 - - 58.00 1.431 58.00 1.431 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 - - 58.00 0.741 58.00 0.741 100.00
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 - - 108.00 2.665 108.00 2.665 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 - - 108.00 1.381 108.00 1.381 100.00
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 48.00 1.127 46.00 1.080 94.00 2.207 100.00
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 48.00 0.614 46.00 0.588 94.00 1.202 100.00
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 30.00 0.740 36.60 0.903 66.60 1.644 100.00
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 - - 66.60 0.851 66.60 0.851 100.00
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 - - - - - - -
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 - - - - - - -
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - - - - - -
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - - - - - -
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 - - - - - - -
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - - - - - -
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 - - - - - - -
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 - - - - - - -
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 - - - - - - -
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
NAMBAH
KURANG
46,200,180.00
51,750,000.00
20,148,325.00
134,880,000.00
51,955,400.00
8,275,000.00
65,529,200.00
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-
ORGANISASI : 1.04.02 Dinas Perumahan Rakyat dan Kawasan Permukiman Provinsi DKI Jakarta
UNIT ORGANISASI : 1.04.02.401 Suku Dinas Perumahan Rakyat dan Kawasan Permukiman Kota - JAKSEL
PROGRAM : 1.04.02 Program Penataan Permukiman
KEGIATAN : 1.04.02.013 Pelaksanaan Fisik Pemeliharaan Saluran Peningkatan Sarana Prasarana dan Utilitas di Kel. Gandaria Selatan (2 RW)
KODE REKENING : 5.2.3.36.01 Belanja Modal Kawasan Permukiman
LOKASI KEGIATAN : Kota Administrasi Jakarta Selatan
TAHUN ANGGARAN : 2020
Minggu ke I (Satu)
Periode 12 November - 15 November 2020
Kontrak 39 (tiga puluh sembilan) hari kalender
Progres Rencana 2.323%
Progres Actual 2.481%
Deviasi 0.158%
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 19.50 m1 0.458 - - - - - - -
2 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 44.90 m1 1.108 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 6.444 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 64.40 m1 0.823 - - - - - - -
5 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 162.00 m1 2.647 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 51.00 m1 1.198 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 51.00 m1 0.652 - - - - - - -
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 86.40 m1 2.132 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 86.40 m1 1.104 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 58.00 m1 1.431 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 58.00 m1 0.741 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 108.00 m1 2.665 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 108.00 m1 1.381 - - - - - - -
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 94.00 m1 2.207 - - 48.00 1.127 48.00 1.127 51.06
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 94.00 m1 1.202 - - 48.00 0.614 48.00 0.614 51.06
3 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 66.60 m1 1.644 - - 30.00 0.740 30.00 0.740 45.05
4 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 66.60 m1 0.851 - - - - - - -
RT. 02
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 2.737 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 68.80 m1 1.124 - - - - - - -
RT. 03
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 177.10 m1 4.159 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 177.10 m1 2.264 - - - - - - -
RT. 04
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.20 m1 1.813 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.20 m1 0.987 - - - - - - -
RT. 05
1 Pek. Pas. U-Ditch 30 x 40 Pabrikasi (K-350) 26.60 m1 0.656 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 26.60 m1 0.340 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 2.041 - - - - - - -
KEMAJUAN FISIK MINGGUAN
Minggu Lalu Minggu Ini Prestasi s/d Minggu Ini
Progress
Bobot Bobot Progress
No. JENIS PEKERJAAN VOLUME Sat. terhadap Ket
Nilai Bobot Volume terhadap Volume terhadap Volume terhadap
item
(m) Kontrak (m) Kontrak (m) pekerjaan
kontrak
(%) (%) (%)
(%)
7= 9= 12 =
1 2 3 4 5 6 8 10 = 6+8 11 = 7+9 13
(6/3)*5 (8/3)*5 (11/5*100)
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 51.30 m1 0.838 - - - - - - -
RT. 06
1 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 1.945 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 48.90 m1 0.799 - - - - - - -
RT. 07
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 14.50 m1 0.341 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 14.50 m1 0.185 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 14.40 m1 0.853 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 14.40 m1 0.414 - - - - - - -
RT. 08
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 134.70 m1 3.163 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 134.70 m1 1.722 - - - - - - -
RT. 09
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 33.70 m1 0.791 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 33.70 m1 0.431 - - - - - - -
3 Pek. Pas. U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 2.701 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 40 x 60 Pabrikasi (K-350) 67.90 m1 1.109 - - - - - - -
RT. 11
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 77.90 m1 1.829 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 77.90 m1 0.996 - - - - - - -
RT. 12
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 91.60 m1 2.151 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 91.60 m1 1.171 - - - - - - -
3 Pek. Pas. U-Ditch 60 x 80 Pabrikasi (K-350) 63.90 m1 3.785 - - - - - - -
4 Pek. Pas.Tutup U-Ditch 60 x 60 Pabrikasi (K-350) 63.90 m1 1.839 - - - - - - -
RT. 13
1 Pek. Pas. U-Ditch 30 x 30 Pabrikasi (K-350) 59.90 m1 1.407 - - - - - - -
2 Pek. Pas.Tutup U-Ditch 30 x 60 Pabrikasi (K-350) 59.90 m1 0.766 - - - - - - -
Dibuat oleh :
KONSULTAN PENGAWAS
PT. ESYA MEGAH PERKASA
9,278,100.00
22,450,000.00
Rp 130,561,146.00
16,679,600.00
Rp 53,622,000.00
24,265,800.00
13,209,000.00
43,200,000.00
Rp 22,377,600.00
29,000,000.00
Rp 15,022,000.00
54,000,000.00
Rp 27,972,000.00
44,725,200.00
24,346,000.00
33,300,000.00
Rp 17,249,400.00
31,307,640.00
Rp 62,055,000.00
17,042,200.00
Rp 36,729,000.00
Rp 55,448,190.40
Rp 22,772,800.00
84,264,180.00
45,868,900.00
36,731,760.00
19,994,800.00
13,300,000.00
Rp 6,889,400.00
Rp 41,344,362.90
Rp 16,980,300.00
Rp 39,410,123.70 805,933
Rp 16,185,900.00 331,000
1,136,933
6,899,100.00
3,755,500.00
Rp 17,280,000.00
Rp 8,395,200.00
64,090,260.00
34,887,300.00
16,034,460.00
8,728,300.00
Rp 54,722,850.70
Rp 22,474,900.00
37,064,820.00
20,176,100.00
43,583,280.00
23,724,400.00
Rp 76,684,812.00
Rp 37,256,037.83
28,500,420.00
15,514,100.00
2,026,092,348.53
2,026,091,348.000
(1,000.53) -0.001
-0.001
#REF! 30*30
#REF!
#REF! 30*40
#REF!
304.70 40*60
51.30
63.00 60*60
#REF! 60*80
#REF!
#REF!
#REF!
14,184,420.80
5,825,600.00
20,010,020.80
500,000.00
259,000.00
759,000.00
-
-