No: RVNL/MPMRCL/Indore/INO3/0332 Date:28/02/2022
The Engineer
DB-Geodata-Louis Berger,
General Consultant
Indore Metro Rail Project
Indore
Name of work: Design and Construction of Elevated Viaduct between Ch.14+488 & Ch.25+415,
viaduct connecting Depot leading up to Interface Location, Nine (9) Elevated
Metro Rail Stations including all Civil, Structural, Roof structure, Mechanical,
Electrical and Plumbing (MEP) works, Architectural finishes, Fagade, Entry/Exits,
FOB, Viaduct within the stations including Transition spans” for Indore Metro Rail
Project Yellow Line. (Package - INO3)
Subject: Submission of Geotechnical Report for Test Pile at Super Corridor Station-5
Package IN-03 of Indore Metro Rail Project.
Ref. Contract no 273/MPMRCLI2021/Package INO3
Dear Sir,
Please find enclosed herewith the Geotechnical Report for Test Pile at Super Corridor Station-5
Package IN-03 of Indore Metro Rail Project for your review and approval.
Thanking you and assuring you of our best services at all mes.
DA: As above
‘Addl. General Manager (P)
Indore
CC: |. CPM/BPL/RVNL ~ For kind information Please.
2-GM|MPMeCL Indeve — For vind infamrabion pl
Regd. Off. : Plot No. 25, (1st Floor), August Kranti Bhavan, Bhikaji Cama Place, New Delhi-110066
Tel.: +94 11 26738299 Fax : + 91 11 26182957, Web : www.rval.org,EMPLOYER: MADHYA PRADESH METRO RAIL CORPORATION LTD {iif
GC: DB-GEO DATA-LOUIS BERGER BEGEODATA @ es tower
CONTRACTOR: RAIL VIKAS NIGAM LIMITED /@ aasisacs”
PROJECT: INDORE METRO RAIL PROJECT — PACKAGE IN-03
me
GEOTECHNICAL REPORT FOR TEST PILE ~ SUPER CORRIDOR STATION 5
DOCUMENT NO
VIL /IND / L003 / RAS / GEO / RPT /1N 03 / XX / 5003/3 / P
For DDC Tear
TRev a ~
vate | *** | modifiations/ Purpose of ssue | Prepared By Checked By | Approved BY
Name | Sin [Name | Sign | Name | Sign
12-02-22 | RO | For Approval os | Wer’ | ose | yer | sow | gb
Date Pages Document No Rev No
12-Feb-2022 2421=23
VNU / IND / L003 / RAS | RO
GEO / RPT / IN 03 / XK /
5003 /53/P° Jer Rresrer Provr ferbre
Ve A Rail Vikas Nigam Limitec
LE I I,
Design Certificate
Project: Design and Construction of Elevated Viaduct between Ch.14+488 & Ch.25+415, viaduct
connecting Depot leading upto interface location, Nine (3) Elevated Metro Rail Stations including all
Civil, Structural, Roof structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural
finishes, Fagade, Entry/Exits, FOB, Viaduct within the stations including Transition spans” for Indore
Metro Rail Project Yellow Line.
DESIGNER STATEMENT:
We certify that:
a) The outline designs, design briefs as illustrated and described in the drawings /
documents scheduled in the attached transmittal, complies with the design basis
criteria and other contract provisions.
b) An in-house check has been undertaken and competed to confirm the completeness,
adequacy and validity of the works as illustrated and described in the drawings /
documents scheduled in the attached transmittal
Signed by Designer's authorized representative
Name: Pallavi Bhosle
Position: Lead Designer ~ Geotechnical
Signature:
SA
Pallavi Bhosle
Date: 23.02.2022Tatarmfielies
(nen (DB) aczo01Ts Qs alas ge Lined
MPMETRO. rtichenncerings Semen
CONTENTS
1. GENERAL 2
2. REPORT: OBJECTIVES AND SCOPE .. 2
3. LOCATION OF TEST PILE 2
4, STANDARDS AND coDés. 2
5. PILE CAPACITY AND TEST LOAD. 3
6. _TESTPILE CONSTRUCTION. 3
7. LOAD TEST PROCEDURE 3
8. SUMMARY. 4
Annexure | : Location Plan and Subsurface Profile
Annexure I : Factual Data
Annexure tll: Geotechnical Parameters (CR, RAD, UCS)
AnnexurelV Pile Capacity Analysis
rofat‘eres
«one {GEODATA @ este Pa isi iid
Menor —etnmnntnaeseiten ‘mnt
5. _ PILE CAPACITY AND TEST LOAD
Based on the factual data and design parameters the axial and lateral capacity of pile is worked out
at test location and summarized below. The calculations are attached as Annexure.
Lateral Capacity for Pile Dia = 1200 mm
+ The 300 mm length for which friction is required to neglect is included,
Based on the structural design the required axial and lateral capacities are about 650 T and 13 T
respectively.
‘As per the code, the test shall be carried out for the loading equal to 2.5 times the design capacity.
For lateral capacity the test pite will be in free head condition. Hence, minimum test loads shall be
considered as below —
Vertical or Axial Capacity
Lateral Capacity = 2.5 * 13
5 * 750 = 1875 Tons (Minimum)
32.5 Tons (Minimum)
6. _ TEST PILE CONSTRUCTION
During construction of test pile, the rock samples recovered from pile boring shall be checked against
the corebox of SC05-02. The pile termination shall be carried out based on the termination level
shown in the drawing. The pile Penetration Rate Shall Be Measured by Depth of Penetration into
Rock Per Unit Time for the record purposes only
The test level shall be marked on the pile surface and extra concrete will be chipped off carefully and
pile top will be trimmed off to a plain and level surface. If during the chipping, weak concrete is met
with at the test level, further chipping shall be carried out till good concrete is met with and the pile
shall be then built up to the test level with the same or higher grade of concrete, After final
preparation, a steel bearing plate shall be set centrally on top of the test pile head by pouring non
shrink grout for levelling if required.
7. LOAD TEST PROCEDURE
The test load provision in the initial load test shall not be less than the estimated safe load multiplied
by the minimum factor of safety of 2.5. Maintained load method shall be followed in this test. The
‘otal load shall be applied in increments of 20% of design load and deflection shall be noted. The
loading will follow the loading sequence chart attached. For each load increment applied, the
displacement will be measured at the time intervals mentioned in the recording schedule attached.
Sofa‘a feamfru fte
me) nN DB) acx0011 Qn Fela gan nd
MPMETRO
ANNEXURE |
Location Plan and Subsurface Profile
Sof?MPMETRO. minatene
‘tara fm fg
(nn in] (DB) accoois Qs al sen Ud
ANNEXURE II
Factual Data
Tora_— Borehole 1D: SCOS-02,
he | BOREHOLE LOG
Pacers seat
Jrcject Name: Getechclinesignon of indore Mao Ral Proed Package RGD Prec Nirbar 8.1056
[tent Rat Vikas Nigam Linnea Proce Location: indore, MP [Ghanage: 16858620 4m
Die Sao Jn 4 2027 [Conga Jan 152022 [pve Gating 0.19 7.5m Logged By VER
aupnent Saaz Temnates Oop Notting 2516470.am[Eneing 62898 408m —| Grand Evan
Dang Method Rly Org 2050. (reund Water able 227 Sonam
s_lelz Boley | Conna t%) strongtnParamators| Ia srw ase
2/8] & unwnaioorrnvon| 3 | caine ten 3 POS we we FRE
nie [Tog [roo || FEE ee Fo Be
“) pc a Tt it
fo 65.00|
wes 7800 | 700 A
ves 1700] e200 .
ve 7600 | 900
a 100.00] s6.00 .
me 8.00 | 7400
breviation
|SPT: Standard Penetration Test ‘Cohesion UCS: Unconfined Compressive Strength
|UDS: Undistrubed Sample 6: Angle of intemal Friction ‘LL: Liquid Limit
|TCR: Total Core Recovery ‘SG: Specific Gravity ‘PL: Plastic Limit
RAD: Rock Quality Destnaion __MG-Mlalure Content 2k & Dry Dens nou
28
sof2tINDORE METRO RAIL PROJECT PACKAGE IN-03
(GEOTECHNICAL FACTUAL REPORT
‘8005.02
S19562021-2GFRIVertINOORE METRO RAIL PROJECT PACKAGE N03
(GEOTECHNICAL FACTUAL REPORT
‘Core Length (ap No. of Core Pieces
120-135 125
135-180 2647
150-105 4288
165-180 50-54
180-195 weet
195-205 eert
SGA DIGERVETnn
N
ANNEXURE III
Geotechnical Parameters (CR, ROD, UCS)
ofareer
TEL] $6 | 0oT [OSs Dor] oOt [O53r Ze 06 | 06 _[OS3t $5] 00T [OST
96 | 96 lost Toe | 68 | 7# [Oost oor | oor _|oorst £6 _[oot_jorst
Ete | 96 | 96 loser | a8 loset 66 _| 66 _[OSer | ¥6 [ost Té_| dor [OSer
33__| oot _|oozt Taz | 55 [oor fooet 78_| oot ooze 5a [99 | 6 [ooze ¥6_| 66 [007
0_| at _osor 0_[ wv _osor <_[3¢_losor [oor [osor @_| ec | oot fosor
| & [ove 0 [6 loos 0 | es [ove o_[ €€ [00% 0c_| ss | 86 [006
0s 0S 052 052 Os
ons 009 008 003 008
os os os os os
one OOF one oo Oe
Ost OST Ost ost ost
[Toso 050 050 i 05
son [abu | wo Meee] — [son jody | w fade) [son [gow] wo |meaa] [> [abu | w_fadea| son [abu | w_freea
Ors3s 60598 20-595 O55 20-595
| 66 [oraz
6_[ bor Joosz
35_| v6 loser
vse | 65 | 16 lovee
Z_| 06_looo 0 | €_|osoz
ves | 09_| ae loser 1 | 36 loser | 86 loser 0a lover
es | 68 fost £06 | ss_| 08 loost es | 95 | oor [oor | 8¢_loser
T_[ oor [oor fost zs | 69 | 5 oost 35_| 18 [0597 | 9 fost ez [ve | 1 Joost
| oot [over oz_| 16 lost E08 | 0 | 16 loost Fe [9 | a lost | 0c _foost
| 46 [ooze we [15 | 06 fooer 6_| 05 loser Z| 2¢_ loser loser
eee | 09 | 008 [oor [95 lostr | ev [oor | $9 ooze oor
0 | 8 looor o_[ 0 [oss | $6 [oor oot sor
o_| st [ous o [es [006 | oF [0s 086 oor
05% 05 087 os 0s
00's 093 009 03 098
os Ost os 05 os
ove Oo oe ‘ove ove
ost 0s ost [fost ost
050 050 050 0s oso
‘son [abu | 2 fadea! san [aby | w> fadeo| [San [abe] wo fda] §=— [son [ade] w fndeg son [abu | wo fda
50595 0-598 £0595 20595 1053s
meme sare]
ur wey sey ey stew @ vivcosom (80)
ail al wuMPMETRO
‘arr ts
inne (DB) nce0017 Qn fal asian ned
ANNEXURE IV
Pile Capacity Calculations
1Sof2t(i fl (DB) aczoowm O--- ‘afin hie
sania lias gam Lined
HP semen
BH SC05-02 - 1.20 m Dia Pile Capacity
A] Axial Capacity of Pile
Depth |(CR+RQ| Qc/Cub| Cus Design
UCS | Method | ks,
From | To | DV/2 P| traeay | (pay cus cma
120 | 135 | 3250 | 2680 | Memosi] 033 | 2680] 116 16
13.5 15.0 | 41.50 | 26.80 | Method1[ 0.45 26.80 | 1.16 1.16
15.0 | 165] 70.00 | 2680 | Wettoat} 081 | 26.80 | 116 116
16.5 18.0 | 72.50 | 26.80 | Method1| 0,85 26.80 | 1.16 1.16
18.0 19.5 | 78.00 | 53.00 | Method] 0.92 53.00 | 1.64 1.64
19.5 20.5 | 86.00 | 53.00 | Methodi | 1.02 53.00 | 1.64 1.64
Socket Qc /cub zis j re | rat | au
tenath [Method] SP | apa) [ustmral of |g i 18 5 8 8 rons | (rons) | capacity
20 [ewes] 9.45 | 2680 | 146 | 120 | 482 | 5:00 | 54558) 17892] 720.00
3.60 [memosi] ogs | 2680 | 116 | 120 | 911 | 5.00 | 565.49| 314.86] 880.00
4D [Methoes| oes | 2680 [ it6 | 120 | 911 | 5.00 | 565.49] 349.85] 910.00
B] Uplift Capacity
Uplift Capacity shall be considered as 70 % of socket friction and pile weight.
Hence,
aE
Socket Raf [O70RS] rome | PY
Start [Dia [End | (Tons) | (Tons) | i | (Tons)
14.00 | 20 | 16.40 | 174.92 [122.45] 25.97 | 140.00
14.00 | 360 | 18.30 | 314.86 | 220.40| 28.98 | 240.00
14.00 | 40 | 18.30 | 349.85 | 244.89| 29.77 | 270.00
wefanA Pal as Nga Linted
MP. ‘tnt
BH SCO5-02 -1.20™m Dia Pile Capacity
E] Lateral Capacity
Pile shall be designed as Bored Cast-in-situ Piles as per IS 2911 (Part 1/ Sec 2) - 2010,
The lateral capacity of pile shall be determined for the allowable deflection of pile
As per IS 2911, the permissible deflection is S mm
For rock strata, consider cl 6.7.3.2 and behaviour of rock shall be considered as cohesive
Depth Consider SPT _|Thicknes| k, x 10*| Kx 10°| n,x10* R iT
From | To | Stratatype | _N s_[Rvim® [kN/m* | kN? | mom
0.00 1.50
150 | 600 |Norm.toaded Gay | 9100 | 450 120 479
600_| 12.00 [Preloaded cay | 100.00 | 6.00 | 72.00 | 12.00 3.80
12.00 | 13.50 [Preloaded clay | 100.00 | 150 | 72.00 | 12.00 3.80
13.50 | 15.00 |Preloaded Clay 100.00 | 1.50 | 72.00 | 12.00 3.80
15.00 | 16.50 |Preloaded Clay 100,00 | 1.50 | 72.00 | 12.00 3.80
16.50 | 18.00 |Preloaded Clay 100.00 | 1.50 | 72.00 | 12.00 3.80
18.00 | 19.50 [Preloadedciay | 100.00 | 150 | 72.00 | 12.00 3.80
19.50 | 20.50 [Preloaded Clay 100.00 | 1.00 | 72.00 | 12.00 3.80
The sub-soil consists of the layers of cohesive / cohesionless soll and rock of different consistency.
Hence, weighted average of the soll from cut-off level to start of socket depth of Pile shall be
considered as below
Depth Consider [Thickne] Ror T
From | _To StrataType [ss
230 | 600 |Norm.toaded clay | 3.70 | 479
6.00 | 12,00 |Norm.toadedciay | 600 | 3.80
12.00 | 13.50 [preloaded clay 150 | 3.80
For Weighted average i120 | 443
19 0f2Ana prone AT nee
MP Semen
BH SCO5-02 - 3.20 m Dia Pile Capacity
F] Design Summary - Recommendation
Pile Diameter 1.200 om
Pile Cut-off Depth BEGL 230 0m
Grade of concrete 35
Start of Socket Length 14.00 m
Consider socket length as 36D
Hence, Pile Termination Depth 18.30 m
Pile Spacing in Group Shall be 25D
Design End Bearing Resistance 5.00 T/sqm
Design Side Friction Resistance 5.18 T/sqm
‘Axial / Compressive Capacity {Critical from IS & IRC) 880 Tons
Uplift Capacity (Critical from IS & IRC) 240 Tons
For Fixed Head Pile IRC 1S
Depth of Fixity from Ground Level 10.55 m
Lateral Capacity 32.00 78.00 Tons
For Free Head Pile IRC 1S
Depth of Fixity from Ground Level 9.23 m
Lateral Capacity 13.00 33.00 Tons
2i0f2