Panel 24
9660800

9660800
Panel 25

Panel 26

Panel 27

5
-3
Panel 28 0

RL
L
R

RL 0
Panel 29
RL +35

RES PIT UTARA

MD : 7.335 BCM
TS : -
OB : 350.481 BCM Disposal Utara
CO : 81.343 MT
SR : 4.32 MT Vol : 650.991 BCM

RL+45
9660000

9660000
RES DGN NOP BY TP EOM OKT

MD : 27.243 BCM
TS : 42.100 BCM
OB : 1.723.739 BCM
Panel 33 CO : 607.252 MT
SR : 2.83

Panel 34
Radius 300 m
Radius 300 m
Panel 35

Panel 36

Radius 500 m
Panel 37 RL-35
9659200

9659200
Panel 38 RL-30
RL+35

Panel 39
RL-20
RES PIT TENGAH

Panel 40 MD : 20.243 BCM


VOL BANK SOIL HW NEW TS : 19.100 BCM
CAPACITY : 110.000 BCM OB : 874.739 BCM
CO : 182.252 MT
SR : 4.77
RL-10
Panel 41 RL+20
RL+10
RL+30 RES PIT TENGAH
Opportunity
single slope 20 m (co:13kmt)
RL+55
RL 0
Panel 42
RL+25

Panel 43
RL+10
Disposal Tengah & Selatan
Vol : 1.672.881 BCM
RL+20
Panel 44
5
9658400

9658400
+4

RL+60
RL+10
RL

Panel 45
RL 0
0
+4
0

RL

Panel 46
+1
RL

RL-10

Panel 47 RL+50
RL-15
RL-20

Panel 48
RES PIT SELATAN
0
+4

MD : - BCM
RL

TS : 23.300 BCM
Panel 49 OB : 629.976 BCM
CO : 392.363 MT
SR : 1.64
9657600

RL+60
9657600
9656800

9656800

290300 291000 291700 292400 293100

Peta Overlay Legend: Tatakan, 7 November 2022


Desain Monthly Plan November 2022 Mengetahui:
Dengan Citra Drone 5 November 2022 Boundary Disposal Ramp

Pit Warutas Blok 4


Boundary Pit LOM Pit

Toe
Skala:

5
Crest
1:4,500
0 187.5 375 750

Meters