You are on page 1of 1

KEY 

PLAN N

1 2 3 GROUND FLOOR 
Nw

W
Ne

Sw Se
S

GF-SPDB/C5 GF-LDB/R1
E
INCOMING FROM MAIN POWER PANEL
RP4
D D 3.5C 25 Sqmm XLPE insulated Aluminium
conductor PVC outer sheathed armoured
cable
INCOMING FROM MAIN ELDB DFE SPDB-1
INCOMING FROM MAIN LIGHTING PANEL
EXISTING ETP
OFFICE

3C 4 SQMM XLPE INSULATED PVC 3Ø VTPN MCB DB GANG W

ETP
AY

OFFICE
(TO BE DEMOLISHED)

GANG W
OUTERSHEATHED AR CU CABLE

AY
4C 6 SQMM XLPE INSULATED PVC LOCATION: GF FUTURE AREA
WASHER
TEMPORARY

12.5kA Power
PLACE FOR
TANK

GANG W
AY
EXISTING
ETP & MEE
DISC
RO
FEED
WATER
COLLEC

EXISTING
Contactor
TANK

4P
TION

ELECTRICAL PANELS

CONNECTED LOAD: 12.00 KW
CAPACIT
:40KL Y

OUTERSHEATHED AR CU CABLE
P-10

GARDEN
WATER
TANK
CAPACIT
PIPE RACK
Y:20KL

GF-ELDB-1 SPD

 GA  &
TEMPORARY

EXIT ANCE
TE
PLACE FOR

BOQ NO : 1.1
COLLEC
PIT TION

EXISTING
SETTLERS (3 NOS)

TR
& GARDEN WATER

GF-LDB-1

EN
TANK (1NO)

4 WAY TPN MCB DB 12.5kA Power EXIST

63A 4P MCB
ING R

4P Contactor
M WA

LOC: ELECTRICAL ROOM @ AB
RE H
OUSE

A
2
EXIST
L .8 M ING P
EXIST 2.075   (L) x  LC PA
CAPACING HC (H) M 0.8(W NE EXIST B

4 WAY TPN MCB DB 12.5kA Power


ITY : 2 L TANK ) M x ING R
0KL O-1&

SPD
2 CO Dish
NTRO  Was
L PAN 8.2 x

BOQ NO: 1.3
C DINN h
EL  3.5
ING 
EXIST    AR
DM ST ING 50 8.9 x EA (
CAPACORAG KL FO  13.5 40 N

300mA RCCB
1  m os)
ITY : 5E TAN R
0KL K

PUMP
Contactor
SER

LOC: ELECTRICAL ROOM @ AB 4P
50KL VING
SS-31 ARE

32A
D280 6 TAN 3.5 x A
SPRO0*H82 K  3.0 
-III FE 50MM m
PUMP
Ø515

CL:4.5KW
ED TA Ø515

NK 50KL PUMP
CAUSTIC

300
SS-31

200
280

300
D280 6 TAN 100
1400
FOR DOSING

200
280

SPRO0*H82 K 3500 (SKID-I) REGENE TANK


KITC

800
HCL
TANK -III PE50MM DOSING RATION
RMEA TANK OFF HEN

450
40KL 280
MULTI
3.0x2 ICE

200
SS-31
100

TE GRADE
1205

510
SPD
FILTER
BUL K I T
3500 (SKID-II)

D280 6 TAN .5m


PT-R 0*H70 K 1785 2235

10KL STO K  C H


EL.(+
Ø515

TANKO-1 R 00MM 3.0 x RAGE  E N

250
BOQ NO: 1.3
SS-31

215
200
463

EJEC
280
)0.300 200

260
(F.F.L
250
D200 6 TAN  2.5m

E
M

505
T )
463
FEED 0*H35
WALK K
CT &   TANK00MM

350
HORIZON
 WAY

1900
AIR BOILE  FOR
COMPRE
3460

450

PUMP
SSOR R

505
400

EL.(+
(F.F.L )0.300

4P
) M

32A
280 EL.(+)2
MID LA .1M

200
NDING

300
CL:4.5KW
2

DISC

-1
RO
TANK

CT
 REJE
RO-1 40KL
UP FG
FG LIFTER
LIFTER EL.(+ 1500x
1500x 1500m
1500m (F.F.L )0.300 m
m ) M FG

DISC

-2
LIFTER

RO
TANK
1500x

MCB
1500m
m

4P

CT
10KL
PUMP

RO-2
C2,C3,C4

REJE
REJE O-1
TANKCT
40KL
PT-R

PUMP

30KL

CT
RO-3
LT PANEL ROOM

REJE
C1 C5 C6 C7

FEED ER
RYB

 BOIL
CT & 10KL
MCB

TANKR AR
WATE CLE
25KL
25A
GF-SPDB/C2,C3,C4 DP 25A HT PANEL ROOM

3C 2.5 sqmm XLPE insulated
Filter feed pu
34 to 38 m3/
mp NaCl
HPN 
1&2
hr NaCl Dosing

 system

34 to 38 m3/
PSF

hr

RCCCB 16A 32A 32A 32A 20A


HPN 
1&2

DP

1500k D.G- S
VA PR ET
HPN 
1&2

OPOS
3C 2.5 sqmm XLPE insulated

ED 
R-272W 30mA RCCCB SP TP TP TP SP

32A
RP3 R-442W 30mA MCB MCB MCB MCB MCB
C C R1 R2 R3

PVC AR CU cable
R1 Y1 B1
10A

PVC AR CU cable
SP 10A
MCB 5C 4 sqmm XLPE insulated PVC
SP AR CU cable
MCB ELECTRICAL LEGEND FOR LIGHTING,GENERAL POWER
SYMBOLS C1 C2,C3,C4 C5 C6 C7 SOCKRT
6/16A 02 01 FIXTURE DESCRIPTION
SL.NO QTY.
FAL

GROUND FLOOR  6/16A 01 01
SYMBOL
34W PHILIPS BN100C LED 40S-6500 PSU
EL.(+)0.300M E
SYMBOLS WATTS
34W
R1
06
R2
03
R3
SYMBOLS WATTS R1 Y1 B1 01
L120 GR(1.000)
32A
32A
34W 09 04
LOAD IN WATTS 170 102
16A
16A 01 6/16A 230V,3PIN SINGLE MODULAR SOCKET  
LOAD IN WATTS 306 136
WITH SWITCH

GROUND FLOOR

GROUND FLOOR

SPARE

GROUND FLOOR

GROUND FLOOR

SPARE
LOCATION
B B LOCATION
6/16A 230V,3PIN SINGLE MODULAR SOCKET  
WITH SWITCH

GF:LT PANEL ROOM

GF:LT PANEL ROOM

GF:LT PANEL ROOM

GF:LT PANEL ROOM

GF:LT PANEL ROOM
GROUND FLOOR

GROUND FLOOR

GROUND FLOOR

GROUND FLOOR

GROUND FLOOR
E
32A 415V,3P+N+E INDUSTRIAL PLUG & SOCKTS 
LOCATION

TAG :RP1,2

TAG :RP5,6
32A
WITH 40A RCBO,30mA

TAG :RP3

TAG :RP4

TAG :RP7
GF-ELDB/R1
16A 16A,230V,1P+N+E INDUSTRIAL PLUG & 
SOCKETS WITH 40A RCBO,30A
E
6/16A MODULAR SWITCH

GF-SPDB/C1 01. ARCHITECTURAL
02. STRUCTURAL
FAL
A RP1 RP2 A 03. HVAC

E 04. ELECTRICAL
05. UTILITIES
REFERENCE DRAWING
1 2 3

R2 FOR REVIEW 07.01.2023 SMR G.K


R1 FOR REVIEW 29.12.2022 C.C H.B
REV DESCRIPTION DATE DRAWN CHECK

REVISION HISTORY
2 PROJECT NAME :­
1 GF-ELDB/R2

CAPACITY EXPANSION FOR MCC ( 750 MTM)
UP

GF-SPDB/C6 GF-LDB/Y1
E

RP5 RP6
A A CLIENT :­
D
E
DFE PHARMA
B‐4, SIPCOT Industrial Complex, Kudikadu,
Cuddalore
Tamil Nadu ‐ 607005
FAL

CONTRACTOR :­

HT PANEL ROOM CRESCON PROJECTS & SERVICES PVT LTD
GF-SPDB/C7 No.70 Second Floor, 8th Street
Sector No.2, KK Nagar
FAL E 16A Chennai ‐ 78
TEL : 044 ‐ 23664945,
B RP7 B Email : cresconproj@gmail.com

DRAWING TITLE :­

1 2 LT PANEL & HT PANEL LIGTHING
LAYOUT
DRAWN :­ C.C CHECKED :­ H.B APPROVED :­ A.B

SIGN :­ SIGN :­ SIGN :­

SCALE :­ 1:100

DWG NO:­ DFE/B03/ELE/DWG/LTG/001 Rev. R1


SHEET NO. 01 CON'T. ON 01 Size. A3

You might also like