You are on page 1of 1

NOTES

X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15


49500
4150 3350 400 4950 2150 7075 1865 2885 2500 7500 6000 6000
425 250

R7

PORTICO
ALU LOUVER SEEN BELOW
Y1
UP
3500

SERVICE
+ 3.00 Lvl LIFT GOODS LIFT DUCT TERRACE R7
Y2 3T
CAPACITY
5T CAPACITY
3800 X 4650 R7
SHAFT
DN
+ 8.00 Lvl
FALSE
3200X3500mm CEILING
250

Y3 PR FALSE

1255
+ 11.00 Lvl
2185
CEILING
16A

PUMP
18 Implanorm
799,9/11/1380-K-W UNE 23035
D<9,3m H.T.245291-06/10

BREAK
1460 PANEL + 11.245 LVL (B.O.P)
SILO 3000

WALK WAY
SLURRY 63A

MIXING TANK CONVEYING CONVEYING


7500

10 KL - 2150 DIA VENTURY VENTURY

1515
19
ELECTRICAL LEGEND FOR GENERAL POWER SOCKETS :-
18
AREA - 497 Sq.m FIXTURE DESCRIPTION

3750
SR.NO QTY.
SLURRY SYMBOL
MIXING TANK + 8.00 Lvl
10 KL - 2150 DIA 21 1
PR
PR 32A

Y4 TOOL BOX
2

PUMP
21

PUMP
PORTICO
20 + 8.00 Lvl SEEN BELOW
+ 3.00 Lvl 4
CONVEYING CONVEYING
7500

PR
800 VENTURY VENTURY
SLURRY HOLDING
TANK 40 KL CIP LOCATION 5
3400 DIA + 11.245 LVL (B.O.P)
IPQC LAB
33750

6700X5590
RM WAREHOUSE 6 16A
14800 X 30400mm
+ 11.30 Lvl
300x300 FLOOR CHAMBER
+ 0.00 Lvl OPENING FOR
PASS BOX
(DOUBLE HEIGHT) ELECTRICAL 7 32A
30000

16A

Y5
8 63A
2515

1. FALSE FLOOR HEIGHT-0.75M FROM FLL


2. FALSE CEILING HEIGHT-3M FROM
+ 9.65 Lvl ABOVE FALSE FLOOR LEVEL
CORRIDOR 6000
SLURRY HOLDING + 8.00 Lvl 01. ARCHITECTURAL
TANK 40 KL
Y6 3400 DIA AREA - 28 Sq.m 02. STRUCTURAL
TOOL BOX

13

REPRO
2335

PASSENGER 03. HVAC


LIFT
2015x2035mm 2250 800 1150
7 ENGINEERING
04. ELECTRICAL
Y7 CONTROL ROOM 1

6000
4200X5970mm 05. UTILITIES
R7

2400
UPS
WALK WAY

2
F REFERENCE DRAWING
3150

16A F
3
22 STAIRCASE
UPS CONTROL
DISPENSING OPERATING
F 700 RACK

1500
BOOTH CONTROL ROOM

500
3000X5970mm
Y8
ELEC MECH

300
SHAFT SHAFT STAIRCASE + 7.40 Lvl
700MMx500MM FALSE
FLOOR OPENING
SEEN BELOW

R7
7000

STEEL CANOPY
SEEN
PIPING

LOW TERRACE
SHAFT

BELOW R0 03.05.2022 M.M H.B


SEEN BELOW FOR REVIEW
+ 5.00 Lvl
+ 5.00 Lvl
REV DESCRIPTION DATE DRAWN CHECK

REVISION HISTORY
PROJECT NAME :-
Y9
CAPACITY EXPANSION FOR MCC ( 750 MTM)
X8 X9 X11 X12 X13 X14 X15 CLIENT :-

DFE PHARMA
1865 5385 250 7500 6000 6000 B-4, SIPCOT Industrial Complex, Kudikadu,
Cuddalore
Tamil Nadu - 607005
795

WALK WAY
Y5
CONTRACTOR :-
2515

AHU-2 -8700 CFM


4550 L X 1820 W X 1600 H mm
CRESCON PROJECTS & SERVICES PVT LTD
DIRECTION
OF
AIR FLOW

WEIGHT-1100KG 15
No.70 Second Floor, 8th Street
Y6 13
Sector No.2, KK Nagar
Chennai - 78
2335

PASSENGER TEL : 044 - 23664945,


WALK WAY Email : cresconproj@gmail.com
LIFT
2015x2035mm
7
DRAWING TITLE :-
Y7 AHU-1 -6550 CFM GENERAL POWER LAYOUT - MCC PLANT
WALK WAY

FAU-1-4600 CFM EAU-1-4550 CFM


AIR FLOW
OF
DIRECTION 5000 L X 1820 W X 1600 H mm 3525 L X 1600 W X 1700 H mm
3525 L X 1600 W X 1700 H mm
FIRST & MEZZANINE FLOOR PLAN
3150

AIR FLOW AIR FLOW


OF OF
DIRECTION DIRECTION

WEIGHT -1012KG 14
WEIGHT-690KG 16 17 WEIGHT-690KG
+ 4.50 Lvl 16A
DRAWN :- M.M CHECKED :- H.B APPROVED :- A.B
+ 4.00 Lvl WALK WAY
Y8 TOOL BOX SIGN :- SIGN :- SIGN :-

SCALE :- 1:100

Rev. R0
1500

DWG NO:- DFE/B01/ELE/DWG/GPR/002

SHEET NO:- 01 CON'T. ON :- 01 Size. A1


2800 3900 1500 3005 3495

You might also like