You are on page 1of 1

X5 X10

X X1 X2 X3 X4 61430 X6 X7 X8 X9
115 6900 3000 6900 6900 6900 6900 6900 6900 3000 6900
115
1200

1 1 1 1 1 1 1 1 1 1 1 1 1 1
P1/B2 ASSISTED PATIENT TOILET P1/B1 C
115

P2/B10

200

200

200

200

200

200
P1/B2 P1/B1 STAFF TOILET
200

200

200

200

200

200

200
C C C C C P1/B8 P1/B8 C C P1/B7 P1/B7 C C C C C C P2/B6 C

200
P2/B10 P2/Y8 P2/Y8 P2/Y7 P2/Y7 P2/B6

200
475 475 H 475 475 475 475 475 475 475 475 475 475 475 475

450

1
B 200 H 200
Y13 D P1/Y8 P1/Y10

900
P1/Y2 P2/R8 P2/Y6

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
200 P1/R4 P1/Y4 P1/R8 P1/R10 P2/B8
P1/R2 DOCTOR'S ROOM D P2/R6
A H A H A H A H D H A H A H

450
D H P2/B10 D FG
1300

1300

1300
CC
U2/B1 A P2/R10 P2/R7

1150

1150

1150

1150

1150

1150
BHP 5
G
P2/B10 P2/Y11 P2/Y10 D
H H H H H H
1650

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/B2 P1/Y2 P1/B2 P1/B1 TWIN ROOM P1/Y4 P1/R4 P1/B1 P1/Y8 P1/B7 TWIN ROOM P1/Y10 P1/R10 P1/B7 F A P2/Y8 P2/Y7 TWIN ROOM P2/R8 P2/B8 P2/B11 FG P2/R7 P2/Y6
D P1/B8

200
P1/R2 P1/Y1 P1/B8 D P2/B5D D P2/B6
MED CART
TWIN ROOM

2100
D TWIN ROOM D D D P1/R8 D D P2/Y10 D D P2/R6
A A A A P2/R10 A A A
TWIN ROOM D TWIN ROOM TWIN ROOM TWIN ROOM P1/R9 TWIN ROOM TWIN ROOM TWIN ROOM P2/R5 TWIN ROOM
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/R1 P1/Y2 A P1/Y4 P1/Y8 P1/Y10 1650 A P2/B7 P2/R8 D P2/Y6
P1/B2 DU P1/B1 P1/R3 P1/B1 P1/B8 P1/R7 P1/B7 P2/Y8 P2/Y7 P2/B5 P2/B6
P1/B8 P2/Y11 H
F G P1/B2 A H G F F G A H G F F G A H G F F G A H P1/B7 G F H G F F G A H P2/B11 G F F G A H G F

200
P2/B9 TWIN ROOM
LINEN EQUIPMENT BAY D
P2/R10

BHP 5
H H P1/R3 H H D H P2/Y9 H H
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P2/R8 P2/Y6 P2/R5
7000

P1/R1 P1/R7 P1/R9 F

825
P1/Y4 G
P2/B9 P2/Y9
A P2/B7

200
P1/Y2 P1/Y7 P1/Y10 P2/R10 PHARMACY
A A A A D TOILET A A A
D 900 D
475 475 P1/B2 JANITOR 475 475 475 475 475 475 P2/Y11 H 475 475 475 475 475
P2/B6

200
P1/B2 P1/B1 P1/B8 P1/B8 P1/B7 H P2/Y8 P2/Y7 P2/Y7 P2/B6
D D D D D D D D D D D 1 DP1/B7 D D D 1 D D D 1 D
1 1 D 1 1 D 1 1 D 1 D 1 D 1 D 1 D
A D D A A D P1/B1 D A A D D A A D D A D A A D D A A D D A
D D D D D D D D NURSE STATION P2/B9 D D D D D
P1/Y1 TS TS TS TS TS TS TS TS
2 A D TS TS TS TS TS
P1/Y1 D P2/Y5 P2/Y5
P1/Y3 P1/Y3 P1/Y3 P1/Y9 P1/Y9 P1/Y9 450 P2/R9 P2/R9 P2/R7
TOILET H H TOILET TOILET H H TOILET TOILET H H TOILET TOILET H H TOILET 750 1000 1000 TS H TOILET TOILET H H TOILET ACDB/R5 TOILET H H TOILET
M ACDB/R2 ACDB/R1 FCU M ACDB/Y2 ACDB/Y1 ACDB/B2 ACDB/B1 ACDB/R3 ACDB/R4 U2/B1 P2/Y11 M M ACDB/B4 ACDB/R6

1700
P2/R7

2050

2050

2050

2050

2050

2050

2050

2050
U2/B1
2150

2150

2150

2150
LDB1 B NS NS B NS U2/B1 EQ EQ
FCU FCU FCU FCU FCU FCU ACDB/Y3 FCU FCU
M P2/B11 A FCU FCU
FCU M P2/B10 P2/B9 P2/B9 FCU P2/Y8 FCU
D

2
FOYER FOYER FOYER FOYER FOYER FOYER FOYER FOYER 1 FOYER ACDB/Y4 FOYER FOYER FOYER FOYER

1500
M M M

600
PDB1 M M M 200 M ACDB/B3
C 200 M
150

150

150

150

150

150

150
150

150

150

150

150

150
D
Y12 FHC
P1/Y9
D
A P1/Y1 A P1/Y3 A A P2/R9 A
PDB2 LDB2
700 700 700 700 700 P2/Y5
3000

1 U1/B2 U1/B2 1 2400MM WIDE U1/B2 1 2400MM WIDE 1 U2/B2 1 U2/B2


M M CORRIDOR M CORRIDOR M M

Y11

740
150

150

150

150

150
150

150

150

150

150
H H H H H H MGPS LV ELECTRICAL SERVICES SPACE HVAC H H H H
M FOYER FOYER M M FOYER FOYER M M FOYER FOYER M H FOYER M M FOYER FOYER M M FOYER FOYER M
UDB1 ACDB
FCU FCU FCU FCU FCU FCU ELECTRICAL PANEL FHC FCU FCU FCU FCU FCU
2150

2150

2150

2150
2050

2050

2050

2050

2050
ACDB/B8 ACDB/B7 ACDB/B5 ACDB/B6 ACDB/R9 ACDB/Y5 ACDB/Y6
TOILET TOILET ACDB/Y8 TOILET TOILET ACDB/Y7 ACDB/R8 TOILET TOILET ACDB/R7 D TOILET TOILET TOILET TOILET TOILET
P1/R6 H H P1/R6 H H P1/R6 P1/Y7 H H P1/Y7 1500 H P2/Y3 P2/Y3 H H P2/Y1 P2/Y1 H H P2/Y1
TS TS TS TS TS TS TS TS TS TS TS
P1/R6
D D D D D D D D D D D
A D D A A D D A A D D A D A A D D A A D D A
STAIRCASE 1
1 1 1 1 1 1 1 1 1 1 1
D D D D D D D D D D D D LIFT D D D D D D D D D D
P1/Y5 475 475 P1/Y5 P1/Y6 P1/Y6 P1/Y11 P2/B2 P2/B2 P2/B1 P2/B1
7000

2400MM WIDE 475 475 P1/Y11475 475 475


P2/R11 475 475 2400MM WIDE 475 475
CORRIDOR CORRIDOR
P2/R3 P2/Y2
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/B3 P1/R7 P1/B9 P1/R11 P2/Y4 P2/R1
P1/R5 P1/B5
A H A H A H 1 H A H A H

1500
M

F H F F H P1/Y6 F F P1/Y11 H F P2/Y3 F F P2/B2 H F F H F


P1/Y5 P1/Y5 P2/B1 P2/B1
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/B3 P1/Y6 P1/Y11 P2/R11 P2/Y4 P2/R3 P2/Y2 P2/R1
D D D P1/B5 P1/B9 P2/B2
TWIN ROOM P1/R5 TWIN ROOM P1/R7 TWIN ROOM D D TWIN ROOM P1/R11 D P2/B3 D D TWIN ROOM D D TWIN ROOM D
A A A A A A TWIN ROOM A TWIN ROOMP2/B1
P1/Y5 TWIN ROOM P1/Y5 P1/Y6 P1/Y11 TWIN ROOM P1/Y11 D J P2/R4 P2/B2 P2/R2
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/B4 P1/Y6 P1/B6 P1/R7 P1/B10 LIFT TWIN ROOMP2/R11 P2/B2 P2/Y4 P2/B1 P2/Y2
P1/R5 P1/R11
1150

1150

1150

1150

1150

1150

1150

1150

1150
G A H G G A H G G A H G H G G A H G G A H G

H H H H H
BHP 5

BHP 5

BHP 5

BHP 5

BHP 5

BHP 5
P1/B4 P2/B4 P2/R4 P2/R2
Y10 P1/R5
A
P1/R7
A
P1/B6 P1/R11
A
P1/B10
A
P2/Y4
A
P2/Y2
A
1200
115

475 475 475 475 475 475 475 475 475 475 475
200

200

200

200

200
P2/B2
200

200

200

200
C P1/Y5 C C P1/Y6 P1/Y6 C C P1/Y11 C C C P2/B2 C C P2/B1 P2/B1 C
D 1
P1/Y5 1 D D 1 1 D D 1 1 DP1/Y11 1 D P2/R11 D 1 1 D D 1 1 D

CONNECTING CONNECTING
CORRIDOR CORRIDOR

BED HEAD PANEL 4 - ANGIO LOUNGE LEGEND


01 SWITCH
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE)
02 1 NO. 6A SOCKET ONLY ON RAW POWER
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE)
03 1 NO. 6A SWITCH SOCKET ON RAW POWER 1
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE)
04 2 NO. 6A SWITCH SOCKET ON RAW POWER 2
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE)
05 3 NO. 6A SWITCH SOCKET ON RAW POWER 3
1 NO. 6/16A SWITCH SOCKET ON UPS POWER (3 MODULE)
1 NO. 6/16A SWITCH SOCKET ON UPS (3 MODULE) - FOR MONITOR 06 1 NO. 6/16A SWITCH SOCKET ON RAW POWER
04 TAG
LEGEND @ 1800MM
07 1 NO. 6A SWITCH SOCKET ON UPS 1

SWITCH FOR EXAMINATION LIGHT


BED HEAD PANEL 1 - ENDO RECOVERY/ EMERGENCY OBSERVATION, HOLDING &
08 2 NO. 6A SWITCH SOCKET ON UPS 2
PROCEDURE ROOM DATA OUTLET POINT
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) 09 3 NO. 6A SWITCH SOCKET ON UPS 3

NURSE CALL POINT R0 16-04-2018 POWER & UPS LAYOUT


1 NO. 6/16A SWITCH SOCKET ON UPS (3 MODULE) - FOR MONITOR 10 1 NO. 6/16A SWITCH SOCKET ON UPS POWER
@ 1800MM 1 NO. OXYGEN OUTLET O2 REVISION ISSUED
1 NO. 6/16A SWITCH SOCKET ON RAW POWER DATE REVISIONS PURPOSE
BHP 1 NO. TO
SWITCH FOR EXAMINATION LIGHT 1 NO. VACUUM OUTLET VA 11 FCU
MOUNTING HEIGHT OF WALL FIXTURES 01 FOR FCU
Structural Consultant
DATA OUTLET POINT 1 NO. COMPRESSED AIR (A4) OUTLET A4
01 CENTRE AT 300MM FROM FFL A 1NO. 6A SOCKET ONLY ON RAW FOR X-RAY
12 X
NURSE CALL POINT VIEW BOX
02 CENTRE AT 600MM FROM FFL B BED HEAD PANEL 5 - SINGLE, TWIN, PREMIUM SINGLE & SUITE ROOMS
1 NO. OXYGEN OUTLET O2 1NO. 6A SWITCH ONLY ON RAW FOR X-RAY
03 CENTRE AT 900MM FROM FFL C 2 NO. 6/16A SWITCH SOCKET ON RAW POWER (6 MODULE) 13 X-RAY
VIEW BOX
1 NO. VACUUM OUTLET VA
04 CENTRE AT 1200MM FROM FFL D SWITCH FOR EXAMINATION LIGHT
14 DATA OUTLET POINT
05 CENTRE AT 1350MM FROM FFL E BED HEAD PANEL 2 - ENDO PROCEDURE & ERCP SWITCH FOR PATIENT READING LIGHT
15 TELEPHONE OUTLET POINT
06 CENTRE AT 1500MM FROM FFL F 2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) SWITCH FOR CEILING FAN
SANJAY ELECTRICALS
05 BHP 5 16 TV OUTLET House no-106 Gali No-3 Padam Nager
07 CENTRE AT 1650MM FROM FFL G 2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) CEILING FAN REGULATOR Sector-87, GreaterFaridabad-121002, HR.
17 AUDIO JACK E-mail : smsanjayelectrical@gmail.com
08 CENTRE AT 1800MM FROM FFL H 1 NO. 6/16A SWITCH SOCKET ON UPS POWER (3 MODULE) DATA OUTLET POINT
18 CEILING FAN REGULATOR
BHP 2 1 NO. 6/16A SWITCH SOCKET ON UPS (3 MODULE) - FOR MONITOR Architects
09 CENTRE AT 2100MM FROM FFL J 02 NURSE CALL POINT
@ 1800MM 19 NURSE CALL POINT Helix Healthcare Architecture
10 CENTRE AT 2400MM FROM FFL K SWITCH FOR EXAMINATION LIGHT 1 NO. OXYGEN OUTLET O2
16, Sadhna Enclave, Panchsheel Park ( South), New Delhi - 110017
20 NURSE CALL INDICATOR NI
T: +91-11-26011107 / 26011108 / 41402479
11 CENTRE AT 3150MM FROM FFL L DATA OUTLET POINT 1 NO. VACUUM OUTLET VA
Email : helix@hlx.co.in
21 NURSE CALL SYSTEM NS
Web : www.hlx.co.in
12 ABOVE FALSE CEILING M 1 NO. OXYGEN OUTLET O2 NURSE STATION 22 THERMOSTAT TS
Project
1 NO. VACUUM OUTLET VA 2 NO. 6A SWITCH SOCKET ON UPS POWER 2 23 QUEUE MANAGEMENT I/O QM
06 NS
BED HEAD PANEL 3 - RESUSCITATION & ICU 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 24 WIFI 1
Sarvodaya Super Speciality Hospital and Research Centre
At Site No. 1 Sector - 8 Faridabad, Haryana
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) DATA OUTLET POINT
25 UPS DISTRIBUTION BOARD
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) WORK STATION-OPD 26 POWER DISTRIBUTION BOARD Client
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) QUEUE MANAGEMENT I/O QM 27 LIGHTING DISTRIBUTION BOARD
Anshu Hospital Ltd.
2 NO. 6/16A SWITCH SOCKET ON UPS POWER (6 MODULE) 1NO. 6A SWITCH ONLY ON RAW FOR X-RAY VIEW BOX X-RAY
28 MANUAL CALL POINT
1 NO. 6/16A SWITCH SOCKET ON UPS POWER (3 MODULE) 07 WS1 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 29 HOOTER
Architectural:
1 NO. 6/16A SWITCH SOCKET ON UPS (3 MODULE) - FOR MONITOR
2 NO. 6A SWITCH SOCKET ON UPS POWER
03 BHP 3 @ 1800MM
2
30 OXYGEN OUTLET O2 FOR APPROVAL
SWITCH FOR EXAMINATION LIGHT DATA OUTLET POINT
31 VACUUM OUTLET VA Drawing Title:
SWITCH FOR LIGHT TELEPHONE OUTLET POINT COMPRESSED AIR (A4) OUTLET BLOCK 'C THIRD FLOOR POWER & UPS LAYOUT
32 A4

DATA OUTLET POINT WORKSTATION 33 COMPRESSED AIR (A7) OUTLET A7 Project Code Drawn By Checked By Approved By
NURSE CALL POINT 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 34 NITROUS OXIDE OUTLET
RV
2 NO. OXYGEN OUTLET O2 08 WS2 2 NO. 6A SWITCH SOCKET ON UPS POWER 2 35 CARBON DIOXIDE OUTLET

1 NO. VACUUM OUTLET VA DATA OUTLET POINT Drawing No.


Scale North Date
1 NO. COMPRESSED AIR (A4) OUTLET A4 TELEPHONE OUTLET POINT
@
1:200 09-04-2018
A1 EL-06

You might also like