2 TRAINING REPORT PT 02

INSPECTION COMPANY: TWI NDT REPORT NUMBER: 0011 PROJECT NUMBER: 1970
CLIENT: Tramcar WELD NUMBER: 69
SPECIFICATION: CSWIP WELD DETAILS: Single V Butt joint weld
TECHNI 132/PT SURFACE CONDITION: As welded
PROCEDURE NUMBER: 132 WELDING PROCESS: 136
DATE OF EXAMINATION: 8.4.15 SCOPE OF INSPECTION: 100%
LOCATION: Prenton Park workshop PROCESS STAGE: After back gouging
MATERIAL: C/Mn VIEWING CONDITIONS: >500Lux
CONSUMABLES MANUFACTURER TYPE BATCH NUMBERS
Solvent Remover Magnaflux 7HF 120514
Penetrant Magnaflux SKL-SP2 150415
Developer Magnaflow SKC-S 140905
APPLICATION: dipping
DWELL TIME: 20 minutes
DEVELOPMENT TIME: 10 minutes
TEST TEMPERATURE: 5-10 oC

TEST RESULTS
Lineair indication, possible cold lap detected. from datum point A; length 120mm.

ACTIONS

SIGNATURE: D Pennar REPORT DATE: 8.4.15

NAME: Dye Pennar QUALIFICATION: CSWIP LT2 PT (EN10204)