Professional Documents
Culture Documents
YONGNIAN
FOOD MARKET
01
Architects
Roarc Renew
Location
Shanghai, China
Category
Market
Principal architect
Zhenqi Bai
Project Year
2019
Area
1000.0 m2
• This aging food market mostly serves for those regular residents
coming to buy foods.
• existing in this place, e.g. unclean shopping environment, disorderly
stalls, dim lighting system, obscure roadmap, wrecked and disorderly
posters in and out of the market, as well as defective floor drains,
ceiling, waterproofing system, equipment, anti-theft system and
firefighting system. In addition to solutions for all these problems, we
can then make this place a little bit more comfortable.
A
3D PLAN
B
CUSTOMER
SERVICE
Client : KSRTC
Project status: Completed in 2014
Area (total): 2.98 acres
The KSRTC bus terminal under the public-private partnership (PPP) model at Puttur, an
important commercial centre in Dakshina Kannada district.
Concessionaire Hindustan Promoters and Builders, who have built the terminal, is given
33 years of licence to operate the commercial space at the terminal. The terminal has
come up on about 2.98 acres of land, where KSRTC’s old bus-stand and bus-depot
were once located. As many as 27 bus bays would cater to passengers’ requirement.
The amenities include ladies’ waiting room with rest rooms, space for canteen, shops,
traffic control, retiring room for bus crew and others. The terminal also has a parking
facility for passengers at the basement. The developer has made provisions for parking
at the basement while ground and first floors would have space for commercial
activities, including shops and establishments. Location of the bus terminal in Puttur
KSRTC BUS TERMINAL, PUTTUR
COMPONENTS OF A BUS TERMINAL
The whole bus terminal complex for KSRTC is divided into two major components:
• Terminal Area’
• Commercial area
The project accommodates the terminal complex housing bus parking areas,
passenger amenities and commercial retail and office spaces integrated in
the building.
The terminal facility accommodates 27 bus bays and passenger amenities
area in one level and a retail mall in the lower levels.
The design takes advantage of the steep gradient of the site having
integrated access of the retail areas with the terminal level. SITE PLAN
KSRTC BUS TERMINAL, PUTTUR
60
Pedestrian/Car/Auto circulation
This zone is an extension of the terminal zone which provides space for the
officers and as well the public. This zone provides all the amenities as per
requirements.
It consists of basement parking, ground floor retail area, mezzanine floor for
office purpose, private office spaces at first floor and hotel rooms at second
floor level.
• This floor is dedicated for KSRTC office providing dormitories, office spaces ,
gents and ladies toilets.
• There is also space dedicated for future expansion of the office which
occupies the other half of this floor.
KSRTC BUS TERMINAL, PUTTUR
COMPONENTS AREA
19 OFFICE SPACES 476.81 sq.m
BLOCK PLAN
INTERSECTING
ROADS
IMAGES
MERITS DEMERITS
Multiple access to the site and Bays not wide enough for two buses
traffic is controlled with the use to pass each other.
of bollards
Proximity from one office to the other
Amenities are good is bad.