This document provides instructions for reinstalling various engine components and making electrical connections after servicing the 1B 26 SOHC engine. Steps include installing belts, covers, filters, sensors, connectors, and refilling the cooling system. Tightening specifications are provided for certain fasteners.
This document provides instructions for reinstalling various engine components and making electrical connections after servicing the 1B 26 SOHC engine. Steps include installing belts, covers, filters, sensors, connectors, and refilling the cooling system. Tightening specifications are provided for certain fasteners.
This document provides instructions for reinstalling various engine components and making electrical connections after servicing the 1B 26 SOHC engine. Steps include installing belts, covers, filters, sensors, connectors, and refilling the cooling system. Tightening specifications are provided for certain fasteners.
Tighten Tighten the alternator adjusting bolt to 20 NSm (15 lb-ft). 42. Install the upper timing belt cover. 43. Install the upper timing belt cover bolts. Tighten Tighten the upper timing belt cover bolts to 10 NSm (89 lb-in). 44. Install the A/C compressor drive belt, as necessary. 45. Install the right front wheel well splash shield. 46. Install the right front wheel. Refer to Section 2E, Tires and Wheels.
A102B003
47. Install the air filter housing.
48. Install the air filter housing bolts. Tighten Tighten the air filter housing bolts to 12 NSm (106 lb- in). 49. Connect the air intake tube to the throttle body. 50. Connect the breather tube to the valve cover. 51. Connect the manifold air temperature sensor con- nector.
A102B001
52. Connect the coolant temperature sensor connector.
53. Connect the engine coolant temperature sensor connector. 54. Connect the idle air control valve connector. 55. Connect the throttle position sensor connector. 56. Connect the DIS ignition coil connector. 57. Connect the fuel injector harness connectors. 58. Connect the oxygen sensor connector. 59. Connect the ECM ground terminal at the intake manifold. 60. Connect the negative battery cable. 61. Install the fuel pump fuse. 62. Refill the engine cooling system. Refer to Section 1D, Engine Cooling.