12024 2000
500 Width = 600mm. 12 mm. dia. RSB
3000 DC1 Heigth =3000 mm. Heigth = 600mm. Vertical Bars spaced @ 300mm. and
Grouted Riprap 2 1500 1500 Thickness = 150mm. 10pcs - Horizontal Bars
(See section Details)
2000
2000
Width = 600mm.
1000
1000
12 mm. dia. RSB
STA. DC1 - DC2 Length =11094 mm. Heigth = 600mm. Vertical Bars spaced @ 300mm. and
RAMP DC1 Thickness = 150mm. 9pcs - Horizontal Bars
2250
RAMP Width = 600mm. 12 mm. dia. RSB
2150 Heigth = 600mm. Vertical Bars spaced @ 300mm. and
DC2 - DC3 Heigth =1000 mm.
800
800
Thickness = 150mm. 10pcs - Horizontal Bars
6000
1900
FEMALE MALE
TOILET TOILET STA.
DC 2-3
800
DRIPPING/
SORTING
4000
11596
AREA
8000
2"x 2" Angle Bar Anchor
2nd flr. Horizontal Bars
ls)
900
CANAL
sink
(See section Detai
Grouted Riprap 1
6100
RSB Horizontal Bars
PACKING
AND WASHING WASHING 2 GROUTED RIPRAP 2 SCALE 1: 20 METERS
12 mm. dia. RSB
PROPOSED DRAINAGE
WEIGHING AREA AREA 12 mm. dia. RSB Vertical Bars spaced
S 5
3100
23718
RECEIVING RECEIVING STA.
EXIT EXIT AREA AREA DC 3-4 DRAINAGE CANAL SECTION
DETAILS @ MIDPOINT OF
150 150
FIRST FLOOR
STA.
ISOMETRY
DC 4 2000
1000
3000 3000 3000 3000 500 16 mm dia. RSB with
2"x 2" Angle Bar Anchor
150 150 150 150
1000
12000
1000
1500
1500
9 pcs.- 12 mm. dia. RSB 10 pcs.- 12 mm. dia.
Horizontal Bars RSB Horizontal Bars
12223
600
800
800
1000
1000
Vertical Bars spaced @ Vertical Bars spaced @
300mm. 300mm.
800
BAL
ILI
- MA 600 600
3000
YAN TOTAL LENGTH = 20.036 Meters TOTAL LENGTH = 4 Meters
1000
DC 4
AD
ELEVATION
SUBPROJECT ID NO. :
PROJECT TITLE:
PREPARED AND SUBMITTED BY: CHECKED AND REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE