Suction Valve.
Pump Barrel.
Plunger.
S-VIT Rack.
Marking instruction:
Number 0742843-8
1. Remove the fuel pump top cover, see Instruction Manual VOL ll, Procedure 909-3
2. Remove the plunger/barrel assembly, see Instruction Manual VOL ll, Procedure 909-3
Puncture Valve.
Suction Valve.
Piston for
puncture valve
Puncture valve
high pressure
Drain Fuel pump top cover
High
pressure Suction valve
fuel to
fuel valve
Fuel inlet
Lube hole
MC fuel pump
Drain oil
•Without VIT
Toothed rack
•VIT is an option
Shock Absorber
Fuel oil inlet
Previous New
Sharp edges
Crack initiation area
to be removed:
R1-R10 SL02-412
The fractures have been experienced on small and medium bore engines. The fractures
where initiated at the position where the inclined drillings for the high-pressure pipes
intersect with the central bore. The cause of the failure has in all cases been related to
roundings which did not fulfill our specifications.
Peep hole
Original design
New design
Fuel inlet
Lube hole
Leakage Gasket
0.5 mm gap
S90-K98MC/MC-C
At suction stroke,
the pressure above
the suction valve is
higher than below the
valve – the pump will
fill up with fuel oil.
© MAN B&W Diesel < 44 >
Fuel Pump.
MAN B&W Diesel
Fuel To
exhaust
pump
valve
Design Features
L/72316-5.0/1101 (2600/RØL)
Fuel
oil
drain
Lubrication hole
Bronze bushing
Roller
Steel bushing
guide
neck
© MAN B&W Diesel < 48 >
Reversing Mechanism.
MAN B&W Diesel
A Cracks B Cracks
Venting Hole.
Adjustment Shims.
Function of
Standard Fuel Valve.
Return Oil
Venting Venting
Closed. Closed.
Venting
open. When opening
Pressure
building pressure is reached,
up.
Atomizing takes place.
Wrong Nozzel.
Wrong Nozzel.
Typical
Blow-By
Crack.
Marking must, as a minimum, consist of: Name, IMO id No. and nozzle size.
Name: Manufacturer’s name/ trade mark
IMO id No.: A unique identification No. which links the component
with the design specification that was used at the time of
manufacture, eg. MAN B&W part No. or licensee’s drawing No.
Nozzle size: Diameter of nozzle hole.
Example of marking:
The example shows how to mark a nozzle with hole
diameter Ø 1.5 mm. with Part No. 1261573-1
+ 25 bar
Opening pressure 300 bar
- 0 bar
+ 30 bar
Opening pressure 350 bar
- 0 bar
Large bore
Small bore
Medium bore
Present New
K90MC
Risk of seizure
Conventional valve
Slide valve
(890 h after installation)
High
Pressure
Pipes.
High
Pressure
Pipes.
High
Pressure
Pipes.
Fuel pump
Air
Slide fuel valve sw
irl
Smokeless performance
Low HC performance
Inconel coating
is applied to
aviod hot
corrosion
0% 100% load.
Position Servo.
P comp.
p scav.
Load
0% ~45% ~85% 100%
© MAN B&W Diesel < 108 >
Following takes place in the Pump:
MAN B&W Diesel
From 0% Load to Lower Break Point (ca 45%) : S-VIT not activ.
From Lower Break Point to Upper Break Point (ca 85%) : S-VIT activ – Barrel lowered – S-VIT index increases.
From Upper Break Point to 100% Load : S-VIT activ – Barrel raised – S-VIT index decreases.
Barrel
Position
S-VIT Index
Load
0% ~45% ~85% 100%
© MAN B&W Diesel < 109 >
Fuel Injection System.
Barrel Position.
MAN B&W Diesel
P comp.
p scav.
Load
0% ~45% ~85% 100%
© MAN B&W Diesel < 110 >
Function of Super-VIT.
MAN B&W Diesel
Adjustments
for low Pmax.
Shims
Pressure
P comp.
p scav.
Load
0% 100%
© MAN B&W Diesel < 114 >
Fuel Injection System.
MAN B&W Diesel
p scav.
Load
0% 100%
© MAN B&W Diesel < 115 >
Adjustment of pmax
MAN B&W Diesel
Shims