Piling and Foundation Engineering Project for Hotels 10, 11, and 12

of the Saudi Arabian Red Sea Development Project

Equipment
空白演示 operators
Training and
单击输入您的封面副标题
assessment
Maintenance Department/Safety Department/Engineering
Department
2023.06.20
Chapter One Preface

Considering the recent occurrence of several on-site safety incidents caused by operators, it has
been exposed that the safety awareness of on-site operators is relatively weak, and there are
phenomena such as non compliant operation, misoperation, carelessness, and non-compliance with
management. Therefore, this training is conducted; This training aims to strengthen personnel's
awareness of safe operation, achieve the "four no harm" principle, ensure the normal operation of on-

site equipment, improve quality and efficiency, and ensure on-site safety production 。
Chapter Two Personnel Entry Requirements
Operators should complete the safety department's entry education and training, as well as the
maintenance department's equipment operation training and assessment before entering the site for
operation. After completing the training and passing the assessment, they can enter the site to operate
the equipment. Special equipment operators should also provide TUV and other relevant certificates 。

Pre job education and training Equipment operation training Personnel TUV
Chapter 3 Daily Operation Management Requirements
Before work: Conduct daily inspections of the equipment according to the daily inspection table, such as the
appearance of the equipment, whether there are cracks in the structural components, whether the fire extinguisher is
normal, whether the lighting horn is normal, and whether the remaining amount of various oils (engine oil, diesel,
hydraulic oil) and water is sufficient; In addition, the lifting equipment also needs to check various limiters (large and
small hook limiters, variable amplitude limiters), anti unhooking devices, horizontal displays, etc 。

Equipment appearance Whether the structural Is the fire extinguisher Light And horn
components are normal functioning properly
Dipstick Hydraulic oil dipstick Diesel tank Water tank

Height limiter Angle limiter Anti decoupling device Horizontal display instrument
Chapter 3 Daily Operation Management Requirements
During work: Pay attention to whether the surrounding environment will affect the equipment operation, such as the presence of
steel bars on the road, whether the clearance for lifting operations is met, whether the foundation of the equipment operation area is
compacted, whether the lifting operation is well enclosed, and whether the distance between equipment edges meets the
requirements; Pay attention to the operating conditions of the equipment, such as abnormal smoke color, abnormal engine noise,
abnormal body noise, and remaining maintenance time of the equipment; Pay attention to one's own state, vision, hearing, and
reactions for normality 。

The roadside steel bar Headroom margin Foundation compaction Insufficient edge
punctured the tire (enclosure) distance
Chapter 3 Daily Operation Management Requirements
After work: After the homework is completed, the doors and windows should be locked, and the equipment should be
parked in the designated area after being turned off and powered off. If it needs to be parked on site, it should be
parked in a safe area 。

Designated area for equipment Equipment parking safety area


parking
Chapter 4 Emergency Response Measures
In case of sudden situations such as overturning, fire, loss of control, and no action during equipment operation, the
operator should first ensure their own safety. On the premise of ensuring their personal safety, the equipment should
be shut down, extinguished, and powered off, and the on-site management personnel should be reported in a timely
manner 。

Engineering Department Phone Number: 059 531 3954 (Liu shuangshuo)


Security Department Phone Number: 050 712 5304 (Wang peng)
Maintenance Department Phone Number: 0506303603 (Lan zong peng)

Chapter 5 Penalty Rules


According to the project equipment management rules, violations of the above disclosure content and the project

equipment management rules will result in a warning for the first time, a deduction of one day's work hours for the
second time, and withdrawal for the third time 。
Chapter 6 Conclusion
Gentlemen, this safety training class is coming to an end. Please follow the above
equipment safety operation specifications for future construction operations; Remind
yourself to pay attention to safety in all aspects, not only for the project, but more
importantly for yourself and the people around you; I hope everyone can work happily
and go home safely. Thank you all 。