Document No. NAI-HSE-024
Revision No.
Warehouse / Workshop Checklist.
Date:
[The first revision shall be named as “0” followed by 1, 2, and 3 for the subsequent revisions. The revision number
shall be indicated on the header of the document i.e. [Project no.] – COMPANY- 0). The amendments shall be
described in the amendment record.]
Revision No.
Warehouse / Workshop Checklist.
Date:
you can.
Revision No.
Warehouse / Workshop Checklist.
Date:
resistant footwear.
Is poor drainage causing a Improve floor drainage.
pooling of fluids on the floor?
Are walkways uneven, do they Barrier off area as a temporary
have holes or missing tiles? solution, ensure barriers cannot
be easily moved.
Revision No.
Warehouse / Workshop Checklist.
Date:
Cleaning
Are spillages left on the floor for Encourage a ‘see it, sort it’
some time before they are mentality among staff.
cleaned up?
Ensure spills cleaning equipment
is readily available for use.
Are small spills wet mopped? Spot clean small spills using
absorbent cloth/paper towel.
Can people walk through areas Keep people off smooth wet
during wet mopping or when floors – Barrier off/close off
floors are still wet? areas, wet mop out of hours when
no-one is around.
Is the floor smooth or slippery
when wet?
Reduce drying time – dry mop
the floors with a clean,
proprietary dry mop.
Are warning signs left out long Remove cones and signs as soon
after the spill has gone and floor as cleaning is completed and
has dried? floor is dry.
Revision No.
Warehouse / Workshop Checklist.
Date:
Assessment Score (Any score less than 50%, work will be stopped for immediate correction.) :
---------------------------