PROJECT SITE:
MONTH:
Project Name /
Project Manager: No.
Document No. NAI-HSE-006
Safety is a primary requirement for the well-being of employees of an organisation. It should aim
at the highest degree of physical, mental and social well-being at work. For the improvement of
safety in an organisation, the following steps are needed to comply with the safety requirements
and alignment with standard.
1. Safety Meeting – The safety meeting gives the idea for the improvement in level of general
safety plan, it provides a platform whereby workers can interact with representative of
management on issues bordering their safety while at work. Hence, the discussion on the each
matter are dealt with best solutions.
The management in deliberation with the HSE department have considered adequate
implementation of NCDC guidelines and come up with a resolve to hold the safety
meeting every two weeks instead of the usual weekly arrangements.
2. Meeting agenda / subject – for these safety meetings, agenda and its discussion points are
needed to pre-plan, agenda of the meeting is for the purpose of health & safety.
The agenda would be solely centred around sensitization on preventive measures and
employee responsibilities as outlined in NCDC guidelines.
4. First aid cases – Cases requiring first aid, cause for first aid and type of first aid treatment
given.
The use of Facemask as preventive and protective piece to minimize and mitigate against
possible spread of the virus transmitting the COVID 19 disease will be enforced on all
personnel. Also, the regular temperature check and hand wash exercise will be carried
out a daily basis.
6. Suggestions – Feedback and comments are very important for health, safety and
environmental issues, management can have an idea of the general health and safety
performance and decisions can be made if required.
Topic:
ACCIDENT / INCIDENT
CURRENT PREVIOUS CUMULATIVE UP
# INVESTIGATION
MONTH MONTH TO DATE
1 Flooding Nil Nil Nil
2 Theft Nil Nil Nil
3 Fire Nil Nil Nil
Some of the observation listed above may lead to serious personal injuries, death or possibly
death or damage of company’s properties can also lead to payment of compensation, loss time
incident (LTI) or production time and loss of company reputation, if nothing is done now by
all concerned to have a positive attitude towards Safety on this project site.
PICTURES
DATE: DATE: