Professional Documents
Culture Documents
CONTENTS
1 SAFETY INFORMATION ............................................................................................................. 8
1.1 SAFETY LABELS................................................................................................................ 8
1.2 SAFETY RULES ................................................................................................................ 10
1.3 PREPARATION FOR EMERGENCY ............................................................................... 10
1.4 WEAR SAFETY PROTECTIVE ARTICLES .................................................................... 11
1.5 KEEP MACHINE CLEAN ................................................................................................. 11
1.6 KEEP OPERATOR’S COMPARTMENT CLEAN ............................................................ 11
1.7 MOUNTING AND DISMOUNTING ................................................................................ 11
1.8 MOVE MACHINE SAFELY.............................................................................................. 11
1.9 REQUIREMENT TO THE CONSTRUCTION FIELD ..................................................... 12
1.10 CHECK MACHINE BEFORE START-UP ...................................................................... 13
1.11 OPERATE SAFELY.......................................................................................................... 13
1.12 KEEP AWAY FROM TRANSMISSION PARTS ............................................................. 14
1.13 MAINTAIN SAFELY ....................................................................................................... 14
1.14 BEWARE OF HIGH PRESSURED LIQUIDS................................................................. 14
1.15 BEWARE OF SCALD ...................................................................................................... 15
1.16 AVOID HEATING UP NEAR PRESSURE OIL PIPE ..................................................... 15
1.17 AVOID HEATING UP PIPE WITH PRESSURE OIL ..................................................... 15
1.18 RREMOVE PAINT BEFORE WELDING OR HEATING .............................................. 15
1.19 AVOID FIRE ..................................................................................................................... 16
2 BRIEF INTRODUCTION TO SUNWARD SERIES PILE DRIVER.......................................... 17
2.1 ADVANTAGES OF SUNWARD PILE DRIVER .............................................................. 17
2.2 COMPARED WITH THOSE BY OTHER FACTORIES................................................... 17
3 BASIC STRUCTURE AND WORK PRINCIPLE ....................................................................... 19
3.1 BASIC STRUCTURE OF ZYJ 260B-Ⅱ............................................................................ 19
3.2 PILING PLATFORM.......................................................................................................... 20
3.2.1 STRUCTURE ........................................................................................................... 20
3.2.2 PILE PRESSING PROCESS .................................................................................... 21
3.3 TRAVEL MECHANISM .................................................................................................... 21
3.3.1 VERTICAL MOTION MECHANISM ..................................................................... 21
3.3.2 LONGITUDINAL MOTION MECHANISM .......................................................... 22
3.3.3 CROSS MOTION AND ROTATION MECHANISM.............................................. 22
3.3.4 CONTINUOUS STEPPING AND ROTATION ....................................................... 23
3.3.5 LONGITUDINAL MOTION.................................................................................... 23
3.3.6 CROSS MOTION ..................................................................................................... 24
3.3.7 ROTATION ............................................................................................................... 24
3.4 HYDRAULIC SYSTEM (FOR PILE PRESSING)............................................................ 25
3.4.1 STRUCTURE ........................................................................................................... 25
3.4.2 WORK PRINCIPLE (SEE APPENDIX FIGURE 1 HYDRAULIC SYSTEM) ...... 27
3.5 SIDE PILING AND CORNER PILING ............................................................................. 29
3.6 ELECTRIC SYSTEM ......................................................................................................... 32
3.6.1 COOLING DEVICE FOR HYDRAULIC OIL ........................................................ 32
3.6.2 HEATING DEVICE FOR HYDRAULIC OIL (FOR NORTH USERS).................. 32
4. OPERATING REGULATIONS ................................................................................................... 33
4.1 CONTROL PANEL............................................................................................................. 33
4.2 PREPARATION BEFORE PRESSING PILE .................................................................... 34
4.3 OPERATION METHOD AND STEPS ............................................................................. 38
4.3.1 START-UP................................................................................................................. 38
4.3.2 POSITIONING PILE ................................................................................................ 38
4.3.3 LEVELING ............................................................................................................... 38
4.3.4 PRESSING PILE ...................................................................................................... 39
6
ZYJ 260B-Ⅱ Operator’s manual
4.3.5 ATTENTION............................................................................................................. 41
4.3.6 CABLES ACCESS PHASE SEQUENCE ................................................................ 41
DUE TO SOME SPECIAL REASON, N MAY CHANGE............................................... 41
4.3.7 OIL COOLING OPERATION .................................................................................. 42
4.3.8 CONNECTING WELDER ....................................................................................... 43
4.4 INSTALLATION AND REPLACEMENT OF CLAMPING JAW .................................... 43
4.4.1 INSTALLATION ...................................................................................................... 43
4.4.2 REPLACEMENT OF CLAMPING JAW................................................................. 45
5ASSEMBLY, DISASSEMBLY, TRANSPORTATION AND MAINTENANCE .......................... 46
5.1 ASSEMBLY ........................................................................................................................ 46
5.2 DISASSEMBLY ................................................................................................................. 50
5.3 TRANSPORTATION ................................................................................................................. 51
5.4 DEBUGGING ..................................................................................................................... 52
5.5 DAILY MAINTENANCE AND TIME MAINTENANCE ................................................ 52
5.6 LUBRICATION DIAGRAM .............................................................................................. 53
5.7 TORQUE FOR STANDARD TIGHTENING PARTS ....................................................... 54
6 CRANE ......................................................................................................................................... 55
6.1ATTENTION ....................................................................................................................... 55
6.2 BASIC STRUCTURE AND WORK PRINCIPLE............................................................. 55
6.2.1 JIB SYSTEM AND ITS EXPANSION..................................................................... 57
6.2.2 WINCH SYSTEM..................................................................................................... 57
6.2.3 SLEWING SYSTEM ................................................................................................ 58
6.2.4 DERRICKING SYSTEM ......................................................................................... 58
6.2.5 HYDRAULIC SYSTEM .......................................................................................... 58
6.2. 6 SAFETY DEVICE ................................................................................................... 60
6.3 CRANE OPERATION ........................................................................................................ 62
6.3.1 PREPARATION BEFORE START-UP..................................................................... 62
6.4 MAINTENANCE................................................................................................................ 63
6.5 PARAMETER ..................................................................................................................... 63
6.6 HYDRAULIC DRAWING ................................................................................................. 66
6.7 ELECTRICAL DRAWING ................................................................................................ 67
7 TROUBLE SHOOTING ............................................................................................................... 68
7.1 COMMON MALFUNCTIONS AND CORRESPONDING SOLUTIONS....................... 68
7.2 REPAIR ............................................................................................................................... 70
8 MAIN TECHNICAL DATA ......................................................................................................... 72
APPENDIX TABLE 8-1 SIGNS IN THIS MANUAL ............................................................. 72
APPENDIX TABLE 8-2 BASIC PARAMETERS ................................................................... 72
APPENDIX TABLE 8-3 OIL PRESSURE AND PILE PRESSING FORCE .......................... 74
APPENDIX TABLE 8-4 ATTACHMENT TOOLS .................................................................. 75
APPENDIX TABLE 8-5 WEARING PARTS........................................................................... 75
APPENDIX TABLE 8-6 CLAMPING JAW COLLOCATION................................................ 76
APPENDIX TABLE 8-7 HYDRAULIC PUMP PRESSURE-FLOW CURVE
ADJUSTMENT LIST ............................................................................................................... 77
APPENDIX TABLE 8-8 HYDRAULIC PARTS FOR MAIN MACHINE.............................. 78
APPENDIX TABLE 8-9 ELECTRIC PARTS FOR MAIN MACHINE .................................. 78
9 APPENDIX FIGURES.................................................................................................................. 79
APPENDIX FIGURE 1 MAIN MACHINE HYDRAULIC SYSTEM ..................................... 79
APPENDIX FIGURE 2 MAIN MACHINE ELECTRIC SYSTEM ........................................ 80
APPENDIX FIGURE 3A CAST IRON COUNTWEIGHT LOCATED .................................... 81
APPENDIX FIGURE 3B BARITE COUNTWEIGHT LOCATED .......................................... 82
10 ABOUT THE MANUFACTURER............................................................................................. 83
7
ZYJ 260B-Ⅱ Operator’s manual
1 SAFETY INFORMATION
1.1 SAFETY LABELS
Figure 1-1
8
ZYJ 260B-Ⅱ Operator’s manual
Figure 1-2
2. Caution during pile pressing.
Figure 1-3
3. Caution when machine is removing or rotating.
Figure 1-4
Figure 1-5
9
ZYJ 260B-Ⅱ Operator’s manual
Figure 1-6
12
ZYJ 260B-Ⅱ Operator’s manual
Attention of Maintenance:
Understand the maintenance rules before work
Keep the working area clean and dry.
Don’t carry out lubrication or maintenance to
moving machine.
Avoid body and clothing touching transmission
parts.
Check some parts at regular intervals, repair or
Figure 1-12
replace, if necessary. (refer to the
“Maintenance and Repair” chapter)
Make sure all parts in good condition and fitted
correctly. Replace wearing or damaged parts.
Clean any accumulative lubricant or scraps.
Execute daily and regular inspection,
maintenance, and repair according to this
manual book.
1.14 BEWARE OF HIGH PRESSURED LIQUIDS
14
ZYJ 260B-Ⅱ Operator’s manual
15
ZYJ 260B-Ⅱ Operator’s manual
16
ZYJ 260B-Ⅱ Operator’s manual
rotation and can reduce time for auxiliary work. Load balancing controller of longitudinal
motion mechanism can largely improve the reliability of vertical motion hydraulic cylinders.
3. The originally designed pile-clamping box is notable for accurate and reliable pile localization.
The pile stress resulting from clamping can be effectively decreased, and the problem of
clamping thin tube pile can also be solved.
4. Among pile drivers of the similar rank, SUNWARD series is the least in width which can
effectively decrease the distance of side pile when in normal pile pressing. The components
are easily disparted and transported.
5. The novel overall layout and special compact mechanism can deal with not only the side pile
near the building wall but also the troublesome corner pile. It improves the adaptability of
SUNWARD pile drivers evidently.
(It should be pointed out that the deed of many domestic factories’ currently copying the
above patents is illegal.)
Ⅱ WELL-CHOSEN OUTSOURCED PARTS TO IMPROVE RELIABILITY
Quality of the outsourced parts is very important to performance of the whole pile driver. In
order to improve the pile driver’ performance, SUNWARD would rather use the outsourced parts
of high price. For example, our oil cylinder is made in well-equipped professional factory
according to our design; hydraulic pump is high pressure auto variable piston pump; crane
windlass and hydraulic motor for rotary are made in Sino-foreign joint venture company with
introduced technique; the balance valve and other key valves are ordered from noted foreign
company.
Ⅲ IMPROVEMENT OF TECHNICS AND THE MANUFACTURE OF EQUIPMENT, ASSURING THE
QUALITY OF PARTS
Sunward pay special attention to the improvement of technics and the manufacture of
equipment .The key structures are made from high quality 16Mn steel plate which is cut with auto
cutter and welded by CO2 gas-proof welding technique. To improve performance of the large
components such as pile-clamping box and guidance beam, location surface and guidance surface
are mechanically machined without cost consideration; and assure the heat-treatment of key parts.
Ⅳ STRONG TECHNIC POWER, UPDATING PRODUCTS QUICKLY
The staff of Dept. of Research and Development is mainly from the Central South University
Mechanical and Electrical Institute. They are of creative talent and spirit. Our institute has a CAD
designing room of several hundreds of square meters and a laboratory of the similar size. We
provide optimum condition for research and development. ZYJ series static pile drivers are all
designed by advanced CAD technique.
In a word, Sunward has created a complete and innovative designing and manufacturing
system which is also capable of quick response to market changes. With the rapid developing pace,
Sunward is leading the world’s static pile driver market.
18
ZYJ 260B-Ⅱ Operator’s manual
20
ZYJ 260B-Ⅱ Operator’s manual
(highest position)
Clamp pile
Release pile
(lowest position)
It is mainly composed of four vertical motion cylinders and four cantilevers. The four
cylinder tubes are fixed by the four cantilevers to the machine body, and one end of their rods are
jointed with four wheel carriers in long ship slideway. When the piston extends, the main body
rises, otherwise it falls.
NOTE: Before the vertical motion cylinder telescopic, first make sure the cut-off valve
which on the cylinder balancing valve is in open state.
21
ZYJ 260B-Ⅱ Operator’s manual
22
ZYJ 260B-Ⅱ Operator’s manual
slideways leave ground;longitudinal cylinders stretch or draw together, and long ship slideways
move; vertical motion cylinders stretch out till long ship slideways touch ground and short ship
slideways leave ground; longitudinal cylinders stretch or draw together, then body and short ship
slideways move longitudinally.
short ship sideways down short ship sideways down short ship sideways up short ship sideways up
⑴ ⑵ ⑶ ⑷
Long ship sideways up Long ship sideways up Long ship sideways down Long ship sideways down
(Long ship sideways longitudinal motion) (main machine body walk)
Long ship sideways down Long ship sideways down Long ship sideways up Long ship sideways up
3.3.7 ROTATION
There are five steps to carry out rotation. In every rotation, rotary angle is between 8°-11°.
Rotating procedure (see figure 3-11 and 3-12)
Step 2: Long ship slideways touch the ground, short ship slideways are lifted, cylinders in
short ship slideways go to the end vis-a-vis.
Step 3: Short ship slideways touch the ground, long ship slideways are lifted, cylinders in
short ship slideways go to the end vis-a-vis( the direction is opposite to that in Step
1). Relative to the original position, the machine body rotates 8°-11°。
Step 4: Long ship slideways touch the ground, short ship slideways are lifted, short ship
24
ZYJ 260B-Ⅱ Operator’s manual
slideways and rotary platform rotate around central axis and get back to original
place when rubber spring in rotary platform flexes.
Step 5: Long ship slideways touch the ground, short ship slideways touch the ground, then
return to original position.
short ship sideways up short ship sideways up short ship sideways down short ship sideways down
(short ship move in opposite directions) (main machine body walk)
⑴ ⑵ ⑶ ⑷
Long ship sideways down Long ship sideways down Long ship sideways up Long ship sideways up
25
ZYJ 260B-Ⅱ Operator’s manual
MULTI-DIRECTIONAL VALVE
Operators use the four operation handles of multi-directional valves to operate the pile driver.
26
ZYJ 260B-Ⅱ Operator’s manual
Multi-directional valve A ---- It controls the extension and retraction of vertical motion cylinders
to adjust the altitude and level of platform, and to make the short
and long ship slideways touch or leave the ground.
Multi-directional valve B ---- It controls the job of pile pressing, pile clamping, pile releasing and
the rise and drop of clamping box.
Multi-directional valve C ---- It controls the stepping and rotary motion of pile driver.
27
ZYJ 260B-Ⅱ Operator’s manual
Operators use the multiunit valve B to control the job of clamping and releasing pile.
28
ZYJ 260B-Ⅱ Operator’s manual
29
ZYJ 260B-Ⅱ Operator’s manual
Safety rules: to ensure personal safety and equipment safety, the whole machine body
must connect ground firmly and the earth resistance must be kept below 4 ohm. Appendix
figure 2 shows the principle of electrical system.
32
ZYJ 260B-Ⅱ Operator’s manual
4. OPERATING REGULATIONS
4.1 CONTROL PANEL
Operators use the push buttons and joy sticks in the control board to operate the machine.
(The joysticks are numbered as S1~S4,Y1~Y4,Z1~Z4)
33
ZYJ 260B-Ⅱ Operator’s manual
34
ZYJ 260B-Ⅱ Operator’s manual
Overflow valve F4 (see Figure 4-3) is used to adjust rated pressure of the hydraulic system.
Set pressure of F4 as follows: After oil pump works normally, push handle Y3 to “(return)”
position, screw down adjustment nut of F4 slowly, watch pile clamping oil pressure meter, when
the oil pressure is increased to Pa, the rated pressure adjustment finishes. Then screw down the
stop screw of adjusting nut.
Overflow valve F6 (see Figure 4-3) is used to set secondary pile pressing pressure Pd, which
can be set according to different needs (see appendix table 8 oil pressure and pile pressing force).
Adjust pressure of valve F6 as follows: Start pumps till they run steadily; push the handle Y1 to
the position of “normal pressing “, handle Y2 to the position of “pressing”, and handle Y3 to “add
force”; after secondary press cylinders stretch to stroke end, gradually screw down adjusting nut
of F6; observe the oil gauge on control panel; when the gauge directs to the needed value Pd, the
adjustment is done.
Overflow valve F1 (see Figure 4-4) is used to set main pile pressing pressure. It is set as PF1
≤PF9. Adjust pressure of valve F1 as follows: Start pumps till they run steadily; push the handle
Y1 to the position of “normal pressing”, handle Y2 to the position of “pressing”, after main pile
pressing cylinders stretch to stroke end, gradually screw down adjusting nut of F1; observe the oil
gauge on control panel; when the gauge directs to the needed value, the adjustment is done.
Overflow valve F2 (see Figure 4-4) is used to set quick piling pressure. It is set as value PF2
≤10Mpa. Adjust pressure of valve F2 as follows: Start pumps till they run steadily; push the
handle Y1 to the position of “quick pressing” and handle Y2 to the position of “pile pressing”;
after the piston rod of chief pile pressing cylinders stretch to stroke end, gradually screw down
adjusting nut of F2; observe the oil gauge on control panel; when the gauge directs to 10Mpa, the
adjustment is done.
done. The needed oil pressure for clamping is relevant to material and surface condition of piles.
It should be decided according to practical condition.
If clamping is reliable, the set value should be kept low
36
ZYJ 260B-Ⅱ Operator’s manual
See the appendix table 8-7 for the specific value of Pb, Pa and x.
37
ZYJ 260B-Ⅱ Operator’s manual
Figure 4-6 YCY series hydraulic pump Figure 4-7 Curves of quasi-constant
variable adjustment mechanism power characteristics
Q- Flow P- Pressure
Note: According to different models or customer orders, hydraulic pump models are also different.
The A7V series hydraulic pump pressure-flow curves have been adjusted well in factory, don’t
need the adjustment.
4.3 OPERATION METHOD AND STEPS
4.3.1 START-UP
(1) Turn on the air switch. Turn on the power with key and be sure that all handles of
multidirectional valve are in the neutral (off load position).
(2) First start one pump. After about 7~8 seconds the green indicator light turns on.
(3) Start another pump when the green indicator light turns on. After 7~8 seconds the green
indicator light turns on.
(4) High temperatures in the summer time and machine can turn on the filter pump. If the
cooling performance is poor attention on the cooling fan pump.
(5) Start 3 pumps one by one. Have them work for 3 minutes in the condition of no load. If no
abnormalities happen, continue the following procedures.
(6) Push the handle Y4 to the position of “Releasing pile”. Then oil pressure rises. If the oil
gauge labeled “pile pressing pressure” and “pile clamping pressure” shows the normal
pressure, push Y4 to the neutral. Then the job of start-up is finished.
4.3.2 POSITIONING PILE
Operate four stepping handles Z1~Z4 and four vertical motion handles S1~S4 to ensure
correct pile placement by the pile driver’s rotation, longitudinal and cross motion.
Before pressing pile, operate vertical motion handles S1~S4 to have the piston rods of four
vertical motion cylinders extend and long ship slideways land on the ground, short ship slideways
leave the ground. Then positioning pile is finished.
4.3.3 LEVELING
In order to ensure the verticality of piles, the main body of the pile driver should be kept
38
ZYJ 260B-Ⅱ Operator’s manual
horizontal, which can be achieved by operating four vertical motion handles S1~S4 and at the
same time observe if the omnidirectional gradienter on the operating panel shows zero. If it shows
zero, adjustment is finished.
4.3.4 PRESSING PILE
4.3.4.1 OPERATING METHOD
Operate the handles Y1~Y4 to carry out pile pressing. ( see§3, 4.2)
Handle Y4 is used to clamp and release pile. When clamping pile, push handleY4 to position
of clamping pile. After clamping oil pressure reaches the set value, push the handle to middle
position. If clamping oil pressure drops down during pressing pile because of clamping too long,
it should be done to push the handle Y4 to clamping position again to get clamping force. To
release pile, push handleY4 to releasing position. After oil pressure reads zero, push the handle to
middle position.
The combination use of handles Y1, Y2 and Y3 can perform functions of “quick piling”,
“pressing pile”, “adding force” and “lifting pile”. The former four functions are three modes of
pressing pile. They are different in piling speed and piling force.
(1) “Quick piling” refers to that the two chief piling cylinders are switched to special circuit,
and press pile quickly at a speed higher than that limited by pump displacement. To perform
quick piling, push handle Y2 to pressing pile position and handle Y1 to quick piling
position.
(2) “Pressing pile” refers to that the two chief piling cylinders take part in piling work at the
speed corresponding to pump displacement. To perform piling, push handle Y2 to piling
position and handle Y1 to normally piling position.
(3) “Adding force” refers that two chief piling cylinders and two or four secondary piling
cylinders take part in piling work together. When pile pressing force is balanced by the drag
force on pile driver from the ground (oil pressure for pressing pile reaches Pa(24.5MPa)), the
two or four secondary pile pressing cylinders should be used to add force. Push handleY3
to position of adding force, the secondary cylinders stretch out. Handle Y1 must be in the
position of normal piling and handle Y2 in piling position. After finishing a piling stroke,
push handle Y3 to return position. After the rod draws back, then perform “lifting pile”.
ATTENTION:
When the piston rods of secondary pile pressing cylinders stretch out to add force on pile
clamping box, Y1 must be in the position of “normal pressing”, Y2 in “piling” position.
(4) “Lifting pile” refers to lifting clamping box.. First put Y1 in the middle position, then push
handle Y2 to lifting position. Clamping box is lifted to the highest position. Push Y4 to the
middle position from the position of releasing pile and clamping oil pressure reads zero.
(5) Rapid returning operation: When the chief pressing-in cylinder and a pair or two pairs of
secondary pressing-in cylinder work together, the return operation after pressing a stroke
only need push Y2 to lifting position when Y1 in the middle position. If clamping
stagnation, can accord to the “Lifting pile” operating, that is push the participation cylinder
handle to the lifting state
39
ZYJ 260B-Ⅱ Operator’s manual
a) The first 1-2 stroke uses “pile pressing” in order to assure the piling verticality and find
out the ground geology.
b) After 1-2 piling stroke, if the oil pressure is lower than 5MPa, use “quick piling” until oil
pressure reaches 10Mpa. Then use “pile pressing” again. Changing from “pile pressing”
to “quick piling”, the displayed pressure value on the gauge will rise. Changing from
“quick piling” to “pile pressing”, the displayed value on the gauge will drop.
c) After 1-2 piling stroke, if the oil pressure is higher than 5 MPa, do not use “quick piling”.
d) If oil pressure reaches Pa (24.5MPa) during piling, then use “adding force”.
e) If oil pressure reaches Pa (24.5MPa) during adding force, then the piling force has
reached rated force, and the job of piling a set of piles has completed.
WARNING:
Before pressing pile, there must be enough counterweight on the pile driver; pile
pressing force should not exceed 260 tf. If the counterweight is not enough or the pile
pressing force is too large, the accident of “lifting machine” will occur. If the electric bell
alarms, which warns that “lifting machine” occurs, immediately push handles Y1, Y2 and
Y3 to middle position. All personnel except operator should leave away from the pile driver
and keep a least distance of 2-3 meters; After the oil pressure gradually drops down to zero
and long ship slideways touch ground, push handle Y4 to position of releasing pile; When
“lifting machine” occurs, absolutely prohibit pushing handle Y4 to releasing pile position
first. If the clamping oil pressure drops during the process of slowly releasing the piling
pressure, it must be done to push handle Y4 to position of clamping pile for load. When
“lifting machine” occurs, it is also prohibited to operate the crane. If the crane has been
lifting objects, the objects should be unloaded. When the accident has been solved, the pile
driver should be paused to find out causes of “lifting machine”. Before continuing work,
measures must be taken to prevent the accident of “lifting machine”.
Sunward shall not be responsible for any legal or economic responsibility caused by
“lifting machine”.
“Lifting machine”------referring to that the main body and long ship slideways are lifted
off ground because of not enough counterweight or piling force exceeding the rated force.
“Machine falling down”---when pressing pile, pile pressing cylinders release piles
abruptly, so that pile driver loses support and falls down suddenly. It can cause serious
injury to personnel and the machine itself.
ATTENTION
1. In normal condition, it is not allowed to pull pile with pile driver. Pulling pile refers to
pulling out the pile that has been pressed into ground. If there is special condition and it
is necessary to pull pile with pile driver, you must make sure that the pulling force is less
than P2tf, the system oil pressure is less than Pa, and weight of pile driver with
counterweight is less than P3tf. Otherwise partial counterweight should be removed.
When pulling pile, short and long ship slideways should be layed down on ground and
nobody is permitted to stand under clamping box. After finishing pulling work, check the
joint seat between chief cylinders and clamping box whether it is normal or not. If pile
driver inclines during pulling pile, the pulling work should immediately be stopped.
2. If piling pressure exceeds 10Mpa, push handle Y2 to middle position to release pressure,
40
ZYJ 260B-Ⅱ Operator’s manual
then push handle Y4 to the position of releasing pile. If four cylinders work together, the
handle Y3 should also be pushed to middle position to release pressure. After piling oil
pressure gradually drops down, push handle Y4 to position of releasing pile. Otherwise,
great impact would occur! Sunward is free from any responsibility for such incorrect
operation.
3. If pushing handles has to be done or has been done, please remember, at any moment, do
put all handles of multidirectional valve to the middle position to unload, which will help
to save energy, reduce the generation of heat, protect pile driver and assure safety
operation.
4. When working at reconstruction site, especially at the bricks or blocks largely imbedded
stratum, form holes with steel pile first to avoid possible pile break.
4.3.5 ATTENTION
Pay attention to the verticality of piles and the leveling of machine body during pressing pile.
Operate handles and buttons gently avoiding rough operation.
Check at any time whether oil pressure and oil temperature are normal. (The max. oil pressure
should be Pa, oil temperature between 35°~85°). If any abnormalities occurs, stop machine
immediately to dispose abnormalities.
A set of pile to be inserted into the same location must be completed continuously. If there is a
long break during the process, the pile inserted in ground might solidify with the ground earth.
When piling process resumes, the oil pressure would increase sharply.
When pile driver moves, rotates, or rises and falls in large range, it must be guided, cooperated
with ground personnel. The operator must keep close watch on the pile driver motion and
communicate with the ground personnel in time. If there is any abnormality, immediately push
the valve to middle position.
When pile driver moves, rotates, rises or falls, if oil pressure increases, it indicates the related
cylinder has gone to stroke end. Immediately push the valve to middle position.
While pile driver moves or rotates, the electrical cable should not be pressed by long or short
ship slideway, or blocked by obstacles for which the electrical cable can not move with the pile
driver.
Electrical cable can neither be grinded by trucks nor covered by objects.
While pile driver runs, pay attention to the hoses linked to long and short ship slideway, assure
they are not stumbled or blocked by other parts, in case the hose might be pulled broken.
If a sunk accident occurs while pile driver runs, operator must lay down the long and short ship
slideway to touch the ground, remove the counterweight from pile driver, and then dispose the
accident. The counterweight of inclined side should be removed first.
When pile pressing cylinders are working, it is prohibited to release pile.
Sinking accident--- It means that pile driver sinks into the ground because the soft ground cannot
support. At that time the pile driver cannot move by itself.
42
ZYJ 260B-Ⅱ Operator’s manual
The installation of clamping jaw for round & square pile (see Figure 4-10): fix the inner jaw to
cylinder directly by inner hexagonal bolts. When outer jaw is needed, fix it to jaw seat together
with inner jaw by appropriate inner hexagonal bolts.
43
ZYJ 260B-Ⅱ Operator’s manual
Figure 4-10 Clamping jaw installation for square & round pile
① Pile clamping cylinder base ② Pile clamping cylinder ③ Inner clamping jaw ④ Outer
clamping jaw ⑤ Block plate ⑥ Location pin ⑦ Inner hexagonal screw a--- handling hole
44
ZYJ 260B-Ⅱ Operator’s manual
1. Prohibit commanding and observation personnel from standing under the clamping box.
45
ZYJ 260B-Ⅱ Operator’s manual
3. Space for lifter over 25 tons going in and out to lift components.
Fig 5-1
46
ZYJ 260B-Ⅱ Operator’s manual
Fig 5-2
2. Running carrier vehicle within largest part to longitudinal motion mechanism center, see fig 5-2
(no carrier vehicle showed in fig).
3. Lift vertical motion mechanism by crane, mounting related hydraulic pipelines, start pile driver.
Adjusting the position between lifting cylinder bulb and wheel carrier bulb seat in long ship
slideway,connecting them; Run carrier vehicle away. Fig 5-3.
Note:Before assembling,clean impurity in all bulbs and bulb seats.
Fig 5-3
47
ZYJ 260B-Ⅱ Operator’s manual
4. Lift cross motion and rotation mechanism by crane:Lift short ship slideway and turntable to
suitable position, start pile driver, adjusting the position of machine main body, short ship
slideway and turntable by moving longitudinal motion mechanism and vertical motion mechanism,
connecting them; connecting related hydraulic pipelines, fitting ladder. See Fig 5-4.
图 5-6 图 5-7
48
ZYJ 260B-Ⅱ Operator’s manual
49
ZYJ 260B-Ⅱ Operator’s manual
5.2 DISASSEMBLY
The disassembling process is inverse of the assembling process.
ATTENTION:
① After disassembling counterweight, unscrew the drain plug on main body, long & short
ship slideway, and drain the water at first. See Fig 5-13.
② During disassembling,all cylinder piston bars must be retracted to prevent damage in
hoisting and shipping period.
③ Before disassembling cross motion and rotation mechanism. Tighten the return spring
bolt to separate the reset spring seat and reset seat;after assembling in construction site, unscrew
the bolts and make spring seat and reset seat touch.
④ All oil tubes should be plugged in time reliably during disassembling.
⑤ In disassembling, outer touching surface should be oil sealed.
⑥ After disassembling, turntable in cross motion and rotation mechanism and short ship
slideway should be fixed.
⑦ Before transportation, draw back the movement parts of crane jib completely, and fix the
retractable jib with 2 bolts on fixed jib. If there is low bridge, tunnel etc:
a) Disassemble the small part in crane higher the cabin top;
b) Disassemble crane slewing support upper part for shipping separately.
50
ZYJ 260B-Ⅱ Operator’s manual
5.3 TRANSPORTATION
Because of the great weight, use the decomposition transport. The biggest pieces of
transport alone, the rest components flexible locomotive transportation. See Table 5-1
and Figure 5-13.
Choose sufficient tonnage trailer.
We provided the main detachable parts weight table (See Table 5-1 Parts weight table) for the
user to reference. Convenient for installation, disassembly, lifting, transportation, allocation
of vehicles, and to ensure the safety of transport by road, bridge etc.
Note:
51
ZYJ 260B-Ⅱ Operator’s manual
1. The above weight data of all parts is theoretically calculated. The weight data of
outsourced parts is also theoretic. There might be a little difference between practical
weight valve and theoretic weight value. Normally, the percentage error is within ±6%.
2. The cast iron counterweight is calculated as per 6800 Kg/m3.The barite counterweight is
calculated as per 3800 Kg/m3.Customers shall determine the number of square
counterweight to buy according to practical conditions and their need.
3. For ZYJ260B-Ⅱ,the long ship slideway can be filled with 8.1 tons.
5.4 DEBUGGING
1. Examine fixing screw bolts for any looseness. Specially pay attention to those fixing screw
bolts on the pressing cylinders, vertical motion cylinders, crossing motion cylinders and
clamping jaws, as well as the joint screw shaft and screw nuts between cantilever and its seat.
Be sure to keep torque moment symmetrical if there are several fixing screw bolts.
2. Take care to keep the hydraulic system clean. The adding oil of hydraulic system requires
special oil adding equipment and the transmissivity of its oil filter should not exceed 20 μ.
3. Lubricate the machine termly.
4. Clean dust and dirty things after work.
52
ZYJ 260B-Ⅱ Operator’s manual
5. If it works for the first time, you should change all oil after a month and clear the oil tank.
After that, change oil every half a year. (Be sure to clean used oil in tank, tubes and any units)
6. Keep oil return filter clean. If the return oil manometer shows a pressure over 0.4 MPa, clean
or change the core of the oil-filter. Clean it every month.
7. Screw down every fixing screw bolt on all pipe connections and units every month.
8. If the color of the oil becomes white and muddy, replace the oil. Otherwise the hydraulic
elements will break down earlier than expected.
9. In order to assure the accuracy of the oil gauge, it should be checked periodically. Normally,
interval of check is half of a year. When in another work site or the manometer doesn’t
point at zero, unscrew the oil-filling plug loose (see figure 7-2 ), when the pressure inside
and outside the manometer are the same (it needs about 1 minute), screw the oil-filling
plug tight, then the manometer can work normally.
10.When replacing new pump, you should fill up oil in leakage pipe, connect the pipe with
leakage coupler (not screw down), start pump, and screw down coupler nuts when oil leaks
from coupler.
Special Attention:
New machine should be replaces oil sucking filter core after 50working hours; then
replace in every 300working hours or 3 months.
Note:
☆ If environment temperature is higher than 20℃, hydraulic oil N68 should be used.
If environment temperature is lower than 20℃, hydraulic oil N46 should be used.
If environment temperature is lower than -20℃, hydraulic oil N32 should be used.
5.7 TORQUE FOR STANDARD TIGHTENING PARTS
Thread size M6 M8 M10 M12 M16 M18 M20 M24 M27 M30
Level 8.8 10 24 44 78 190 260 370 640 950 1300
Torque(N·m)
Level 10.9 12 30 62 110 265 365 520 900 1350 1800
54
ZYJ 260B-Ⅱ Operator’s manual
6 CRANE
QY crane is installed in ZYJ hydraulic static pile driver as a pile lifting device, which is an
auxiliary device. The crane’s structure is similar to the superstructure of general hydraulic truck
crane and it is mainly composed of jib system, windlass system, slewing, and hydraulic control
systems.
The superstructure of crane is installed in the machine frame, which is connected with the
inner part of slewing support, while the outer circle of slewing support is connected with the base
of crane. The crane base is welded on the main machine of ZYJ hydraulic static pile driver.
6.1ATTENTION
The main machine operator and crane operator should keep good communication and
observation for each other. Prohibit operating crane or hoisting objects while the machine
moves or rotates. And also, prohibit the machine moving or rotating while crane is in
operation or hoisting objects.
Ensure firm binding while hoisting pile.
Crane’s winch wire should wrap around the drum for at least 4 circles.
When lifting pile, it is prohibited to stand in the working range of crane.
Check winch wire and pile lifting wire often and replace them if any damage occurs.
Check and screw down the connection bolts at the crane slewing support every 2 months,
the screwing down torque is 900NM. Replace them with original SUNWARD bolts if any
abnormality occurs.
Lift rated weight within the limitation of jib lifting angle to avoid crane jib overloading.
Before pressing piles, make sure the hook has been separated from the tools for lifting
pile. If not, there will be serious accident of the lifter and pile driver. In some special
condition, if the crane winch has to be used as pile follower, the speed of giving pile must
be higher than the speed of piling.
55
ZYJ 260B-Ⅱ Operator’s manual
56
ZYJ 260B-Ⅱ Operator’s manual
Note: When extending or retracting jib, the angle between jib and horizon should be less
than 10°. There are two adjustable jib lengths. After the jib length is adjusted, fix the
extendable jib on fixed jib with shaft pin and lock bolt.
57
ZYJ 260B-Ⅱ Operator’s manual
58
ZYJ 260B-Ⅱ Operator’s manual
See figure 6-6 for hydraulic system. (Hydraulic principle diagram see §6.6 crane hydraulic
principle diagram) A hydraulic pump supplies pressure oil; The system pressure is determined by
overflow valve of multidirectional valve, the pressure is set as 18Mpa.
Manual multidirectional valve includes 4 manual control valves, achieving derricking, winch,
slewing, jib extending & retracting, and speed control. Pull multidirectional valve handle and
treadle the pedal to achieve smooth derricking, slewing, and windlassing.
⑦ Screw down the limitation screw rod of pump gradually till the variable head pointer
points at 7.7 position, then lock with locknut and screw in plug.
⑧ Place the control handle of amplitude cylinder on neutral position.
The adjustment of hydraulic pump is finished now. Then the pump’s flow and pressure vary
automatically according to the curves of quasi-constant power characteristics.
In order to meet the requirements of the northeast cold climate, the tank can be selected
northeast configuration, heat the oil. (Fig6-9)
Fig 6-9 The heating control principle diagram of hydraulic oil tank
6.2. 6 SAFETY DEVICE
1. Jib overload protection
Adjust the adjustment screw on derricking hydraulic cylinder equalizer valve (if screw clockwise,
the pressure lower; screw anti-clockwise, the pressure higher). The oil pressure which limits the
jib lifting should not exceed 18Mpa to prevent the jib overload. If the jib falls when windlass
60
ZYJ 260B-Ⅱ Operator’s manual
loads, which means the jib lifting angle is too small, it should be done to lift the jib and then begin
to windlass.
61
ZYJ 260B-Ⅱ Operator’s manual
1- Oil pressure gauge for return oil 2-Oil pump on/off 3-Cancel limit button
4- Oil pressure gauge for system oil pressure 5-switch for inside lamps 6-switch for outside
lamps
7-Fan switch 8-Horn 9-Low power 10-Oil temperature gauge (For northern users)
11-Buzzle 12-Oil heating indicating (For northern users)
When windlass lifting hook reaches the upper limit, stop the windlass, and operate windlass
handle of multiunit valve to unhitch the hook until lifting hook leaves the upper limit heavy
hammer.
6.4 MAINTENANCE
6.5 PARAMETER
Table 6-1 MAIN TECHNICAL DATA
Table 6-2A LIFTING ANGLE AND ALLOWABLE LIFTING WEIGHT FOR 12 TONS
Table 6-2B LIFTING ANGLE AND ALLOWABLE LIFTING WEIGHT FOR 16 TONS
(ORDINARY)
64
ZYJ 260B-Ⅱ Operator’s manual
Table 6-2C LIFTING ANGLE AND ALLOWABLE LIFTING WEIGHT FOR 16 TONS
(LONG JIB)
Lifting angle Long jib Short jib
Lifting Slewing Lifting Slewing
(°)
weight (t) radius (m) weight (t) radius (m)
0 1.59 18.17 2.93 13.32
20 3.45 17.1 5.46 12.52
30 4.35 15.74 6.7 11.54
40 5.4 13.92 8.13 10.2
50 6.8 11.68 10.03 8.56
60 8.97 9.09 13 6.66
65 10.67 7.68 15.31 5.63
70 13.18 6.21 16.00 4.56
75 16.00 4.7 16.00 3.45
76 16.00 4.4 16.00 3.22
77 16.00 4.09 16.00 3
78 16.00 3.78 16.00 2.78
65
ZYJ 260B-Ⅱ Operator’s manual
66
ZYJ 260B-Ⅱ Operator’s manual
67
ZYJ 260B-Ⅱ Operator’s manual
7 TROUBLE SHOOTING
7.1 COMMON MALFUNCTIONS AND CORRESPONDING SOLUTIONS
68
ZYJ 260B-Ⅱ Operator’s manual
7.2 REPAIR
1. Before examination and repair, long ship and short ship slideway must be laid down on
ground.
2. Only professional personnel are allowed to repair hydraulic system.
3. Any repair is forbidden if hydraulic system pressure still exists.
4. Before electric motor stops, do not pack oil hose or repair leaking joint, do not feel by hand to
look for leakage, or the high pressure oil might cut into skin to cause injury.
5. The joints, hose and seals must be the right type as designed.
6. Choose place without dust to dispart and assemble hydraulic elements.
7. When fixing the oil gauge, the oil-filling plug (safety plug) should be screwed loose so that
the vent of oil-filling plug can link the atmosphere. During un-using period, screw oil-filling
plug tight to prevent filling liquid from leaking. During work time, if it happens that filling
liquid level rises or becomes full of gauge, replace the old gauge with a new one.
8. It should be carried out or supervised by qualified electrical worker to examine or repair the
electrical system. Also the local manual books of electrical repair and electrical safety should
be obeyed.
9. If it is necessary to use welding method, things must be done before welding are preparing
70
ZYJ 260B-Ⅱ Operator’s manual
welding material and filling material, deciding welding method, switching off all electrical
power to the pile driver, as well as fire fighting equipment.
10. While welding, electric current is not permitted to get through the vertical cylinder from long
ship slideway to platform, nor from platform to long ship slideway. No current is permitted to
be conducted by any cylinder nor to get through between rod and cylinder tube. It is not right
to conduct electric current by iron joint either. The correct method is to connect the cable
directly to the part to be welded. If machine body need weld, first make sure the 24V DC
power supply without 220V AC (the indicator lamp should not light)
11. If welding task is carried out near cylinders, the rod part stretching out of cylinder tube must
be enclosed up with asbestos cloth in case that welding dregs splash to the rod to damage the
cylinder.
71
ZYJ 260B-Ⅱ Operator’s manual
Item Parameter
Max. pile pressing force(25.5Mpa) 62.6 t
The chief pressing-in Max. pile pressing speed(Pressure 7 m/min
hydraulic cylinder works <16Mpa)
separately Min. pile pressing speed(Pressure 4.66m/min
=25.5Mpa)
Max. pile pressing force(25.5Mpa) 260 t
The chief and
Max. pile pressing speed(Pressure 1.69 m/min
secondary pressing-in
<16Mpa)
hydraulic cylinders work
Min. pile pressing speed(Pressure 1.12 m/min
together
=25.5Mpa)
Pressing-in stroke(once) 0.9 m
Side piling Max. pile pressing force(the chief 60 t
pressing-in cylinder
works,24.5Mpa)
72
ZYJ 260B-Ⅱ Operator’s manual
Longitudinal stroke(once) ≤3 m
Capability of motion Transverse stroke(once) ≤0.6m
Every rotative angle(once) ≤8◦
Forward ≤5.59 m/min
Backward ≤11.42 m/min
Traveling speed
Left ≤5.59 m/min
Right ≤9.54 m/min
Vertical motion stroke 0.9 m
Length of pile >3 m,≤14 m
Ground pressure ( At Long ship slideway 9.9 tf/m2
260t) Short ship slideway 12.1 tf/ m2
Normal pressing position Side pile distance 3100 mm
Side pile distance 940 mm
Side pile position
Corner pile distance 1440 mm
Pile clamping box JZX5022
Pile pressing rated pressure(260tf) 25.5 Mpa
Rated pressure for lifting See the operating manual of
crane
Pile pressing flow rate(at full flow) 172 L/min
Lifting flow rate(at full flow) See the operating manual of
Hydraulic system
crane
For main 63YCY14-1B(1 台)
Hydraulic pump machine 63YCY14-1B F(1 台)
model See the operating manual of
For crane
crane
For main Y2-200L-4-V1 30KW(2 台)
Electric system
Electric motor machine
model See the operating manual of
For crane
crane
Pile pressing power 30KWX2=60 KW
Lifting power See the operating manual of
crane
Voltage 380 V
Current (the whole machine) 145A
Frequency 50 HZ
73
ZYJ 260B-Ⅱ Operator’s manual
74
ZYJ 260B-Ⅱ Operator’s manual
75
ZYJ 260B-Ⅱ Operator’s manual
For wheel
SF-2-120115 27
carrier
Crane
SF-1-3240 33
roller
For crane
SF-1-3250 42
jib
Composite
For crane
bearing SF-1-5045 45
jib
For crane
SF-1-50100 48
jib
Wire rope
SF-1-9080F(with For crane For 12T
6X37-13-2000
flange) jib crane
GB/T8918
Wire rope
Wire rope
For wheel For 16T
Friction ring 305070001319 4VX39S+5FC-
carrier crane
15 GB/T 8918
76
ZYJ 260B-Ⅱ Operator’s manual
Directly
450×450 installed in M16×60
F45 8 16
square clamping jaw
seat
Directly
500×500 F50 8 installed in M16×35
square clamping jaw 16
seat
Used together M16×150
Φ250 round Y25 8 16
with Y40
Used together M16×130
8 16
with Y40
Φ300 round Y30
Used together M16×120
8 16
with Y50
Used together M16×80
8 16
with Y50
Φ350 round Y35 Directly
installed in M16×85
8 16
clamping jaw
seat
Used together M16×80
8 16
with Y50
Φ400 round Y40 Directly
installed in M16×85
8 16
clamping jaw
seat
Directly
installed in M16×30
Φ450 round Y45 8 16
clamping jaw
seat
Directly
installed in M16×35 16
Φ500 round Y50 8
clamping jaw
seat
77
ZYJ 260B-Ⅱ Operator’s manual
Code Code
Parts name Parts name
number number
Circuit breaker QF
Module plug seat
NMILE-400/3N300
AC30-10A/3
250A
Circuit breaker QF
Fuse seat RT18-32X FU CM1(ZM1)-80L/3300
80A
Circuit breaker DZ67-60 QF
Fuse φ10X38 2A F 40A
Push button SA Circuit breaker DZ47-60 QF
LAY5(39)-11X/2 3P/D20A
Thermal relay NR2-93 FR
Delay relaySK4-222
48-65A
AC contactor KM Auxiliary contactor KM
LC1-0910 AC220V LA1-DN11-C
Contactor CJX4-6511 KM Fuse FU
220V φ10X38 R015 RT14 6A
Lamp for warning HL Lamp 220V-40W HL
against humidity 40W
AC36V
Power cable Fuse inserts ATS 5A FU
YCW3X50+2X16
Fuse φ10X38 R014 FU Fuse inserts ATS 3A FU
RT14 10A
78
ZYJ 260B-Ⅱ Operator’s manual
9 APPENDIX FIGURES
1- Cross motion cylinder 2- Longitudinal motion cylinder 3- Chief pile pressing cylinder
4- Secondary pile pressing cylinder 5- Pile clamping cylinder 6- Vertical motion cylinder
7- Right move 8- Left move 9- Forward 10- Backward 11- Normal pressure 12-
Quick pressure 13- Press pile 14- Lift pile 15- Add force 16- Return 17- Release
pile 18- Pile clamping 19- Back left up 20- Back left down 21- Front left up 22- Front
left down 23- Front right up 24- Front right down 25- Back right up 26- Back right down
79
ZYJ 260B-Ⅱ Operator’s manual
80
ZYJ 260B-Ⅱ Operator’s manual
81
ZYJ 260B-Ⅱ Operator’s manual
82
ZYJ 260B-Ⅱ Operator’s manual
Trade mark:
Address:
16 LiXiang Road, Xingsha economic and technologic development district, Changsha, Hunan.
Tel: 0086-0731-3572642
Distributor name:
Address:
Tel:
Fax:
Email:
Service personnel:
Remark:
83