Professional Documents
Culture Documents
POTENTIAL PROBLEMS
ACTIVITIES OR
AND HAZARD CONTROL MEASURES
OPERATION SEQUENCE
IDENTIFIED
2. Set up ladder 2. Falling off from the 2. Make sure that the ladder is set
ladder up on a balanced and stable floor.
Mandate a helper to keep the
ladder balanced at all times.
Make sure that the installer does
not step on the highest rung for
safety.
3. Installation of hanger for 3. Cuts and bruises, 3. The company requires all
fabricated secondary drain electrocution manpower to use PPE during work
pan Use of Power tools and hours.
extension cord Bundle up extension cords and
avoid use of damaged power tools.