New Jursy

9.05 01/Jul/22 Crash 216450 RHS 12 24.0


Barrier M
-30

RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi A 15 3.118

12.01(a)i 01/Jul/22 RE Panel 215800 Camp- B 5 1.738


Casting Nandi

12.01(a)i 01/Jul/22 RE Panel


Casting 215800 Camp-
Nandi LTD 1 4.572

RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi LTC 1 4.206

RE Panel Camp-
12.01(a)i 01/Jul/22 215800 A 90 3.118
Casting Nandi
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi B 11 1.738

RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi STC 4 2.683

12.01(a)i 01/Jul/22 RE Panel 215800 Camp- LTD 18 4.572


Casting Nandi

12.01(a)i 01/Jul/22 RE Panel


Casting 215800 Camp-
Nandi LTC 1 4.206

RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi NHAI 1 3.118

12.01(a)i 01/Jul/22 RE Panel 215800 Camp- A 5 3.118


Casting Nandi
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi LTC 1 4.206

RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi A 19 3.118

12.01(a)i 01/Jul/22 RE Panel 215800 Camp- B 10 1.738


Casting Nandi

12.01(a)i 01/Jul/22 RE Panel


Casting 215800 Camp-
Nandi LTC 1 4.206

Drain Raft
8.04(b) 01/Jul/22 (M-30) 212530 212550 SR LHS 1 20.0

Retaining
12.02(b)(i) 01/Jul/22 wall PCC 206480 206500 MCW RHS 1 20.0
(M-10)
Excavatio
n for Toe
12.02(a)i 01/Jul/22 190090 190110 LHS 1 20.0
Retaining
wall
Toe
12.02(b)(i) 01/Jul/22 Retaining 190090 190110 LHS 1 20.0
wall PCC
(M-10)

Retaining
wall 1st
12.02(b)(ii) 01/Jul/22 Lift RCC 216648 216670 SR RHS 1 22.00
(M-30)

Retainig
Wall 1st
Lift RCC
NB 01/Jul/22 (M-30) 216218 216238 SR RHS 1
boom
pressure

Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall 1st 206870 206893 RHS 1 23.00
lift RCC
(M-30)

Toe
Retainig
Wall Raft
NB 01/Jul/22 RCC (M- 206870 206893 RHS 1
30) boom
pressure

Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall raft 206953 206965 SR RHS 1 12.00
RCC (M-
30)

Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall raft 206953 206965 SR RHS 1 12.00
RCC (M-
30)

Retaining
wall 1st
12.02(b)(ii) 01/Jul/22 Lift RCC 208340 208350 MCW RHS 1 10.00
(M-30)
Clearing
1.01 01/Jul/22 and 190400 190760 MCW+SR LHS 1 0.0001 360.0
grubbing
Excavator
/ jcb Used
DeDi1 01/Jul/22 in Hourly 190400 190760 MCW+SR LHS
Basis
Clearing
1.01 01/Jul/22 and 190420 190620 MCW+SR RHS 1 0.0001 200.0
grubbing
Excavator
/ jcb Used
DeDi1 01/Jul/22 in Hourly 190400 190760 MCW+SR LHS
Basis
Recording
NB 01/Jul/22 of OGL 190670 190780 LHS 110.0

Layout of
Toe
NB 01/Jul/22 Retaining 206250 206270 MCW RHS 20.0
Wall for
PCC

Layout of
Toe
NB 01/Jul/22 Retaining 206480 206500 MCW RHS 20.0
Wall for
PCC
Chainage
NB 01/Jul/22 209200 209600 MCW BHS 400.0
Marking

NB 01/Jul/22 Chainage 213500 213800 MCW BHS 300.0


Marking
Layout of
Toe
NB 01/Jul/22 Retaining 190090 190140 LHS 50.0
Wall
Cordinate
NB 01/Jul/22 Of Test 201700 ROW RHS
Pile

Checking
Of
NB 01/Jul/22 Cordinate 190090 190140 RHS 50.0
on Test
Piles

New Jursy
Crash
9.05 02/Jul/22 Barrier M 216450 RHS 13 26.0

12.01(a)i 02/Jul/22 RE-30


Panel 215800 Camp- A 16 3.118
Casting Nandi
RE Panel Camp-
12.01(a)i 02/Jul/22 Casting 215800 Nandi B 5 1.738

12.01(a)i 02/Jul/22 RE Panel 215800 Camp- LTB 1 3.84


Casting Nandi
RE Panel Camp-
12.01(a)i 02/Jul/22 Casting 215800 Nandi A 68 3.118

12.01(a)i 02/Jul/22 RE Panel 215800 Camp- B 2 1.738


Casting Nandi
12.01(a)i 02/Jul/22 RE Panel 215800 Camp- BH 7 1.738
Casting Nandi
RE Panel Camp-
12.01(a)i 02/Jul/22 Casting 215800 Nandi STC 4 2.683

12.01(a)i 02/Jul/22 RE Panel 215800 Camp- LTD 6 4.572


Casting Nandi
RE Panel Camp-
12.01(a)i 02/Jul/22 Casting 215800 Nandi LTC 2 4.206

12.01(a)i 02/Jul/22 RE Panel 215800 Camp- LTB 4 3.840


Casting Nandi
12.01(a)i 02/Jul/22 RE Panel 215800 Camp- LTA 4 3.474
Casting Nandi
12.01(a)i 02/Jul/22 RE Panel 215800 Camp- NHAI 1 3.118
Casting Nandi
12.01(a)i 02/Jul/22 RE Panel 215800 Camp- A 6 3.118
Casting Nandi
12.01(a)i 02/Jul/22 RE Panel 215800 Camp- B 6 1.738
Casting Nandi
RE Panel Camp-
12.01(a)i 02/Jul/22 Casting 215800 Nandi LTB 2 3.840

12.01(a)i 02/Jul/22 RE Panel 215800 Camp- STD 20 3.107


Casting
M-30 RCC Nandi
Slab FOR
5.05a 02/Jul/22 BOX 206297 SR RHS 1 8.8
M-30 RCC
CULVERT
Hunch
5.05a 02/Jul/22 206297 SR RHS 2 8.0
FOR BOX
M-30 RCC
CULVERT
Wall FOR
5.05a 02/Jul/22 206297 SR RHS 2 8.8
M-30BOXRCC
CULVERT
Slab FOR
5.05a 02/Jul/22 BOX 206297 MCW RHS 1 9.0
M-30 RCC
CULVERT
Hunch
5.05a 02/Jul/22 206297 MCW RHS 2 9.0
FOR BOX
M-30 RCC
CULVERT
Wall FOR
5.05a 02/Jul/22 BOX 206297 MCW RHS 2 9.0
Drain
CULVERTSlab
8.04(b) 02/Jul/22 Casting 198176 198186 SR LHS 1 10.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 198187 198197 SR LHS 1 10.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 198198 198208 SR LHS 1 10.0
(M-30)
8.04(b) 02/Jul/22 Drain Wall 195403 195410 SR LHS 2 7.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 195330 195340 SR LHS 1 10.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 195341 195351 SR LHS 1 10.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 195352 195362 SR LHS 1 10.0
(M-30)
Drain Slab
8.04(b) 02/Jul/22 Casting 195363 195370 SR LHS 1 7.0
(M-30)
Clearing
1.01 02/Jul/22 and 190760 190800 MCW+SR LHS 1 0.0001 40.0
grubbing
Clearing
1.01 02/Jul/22 and 190200 190400 MCW+SR LHS 1 0.0001 200.0
Excavator
grubbing
DeDi1 02/Jul/22 /injcb Used
Hourly 190200 190400 MCW+SR LHS
Layout of
Basis
Drain
NB 02/Jul/22 212767 212792 SR LHS 25.0
Excavatio
Layout of
n
Drain
NB 02/Jul/22 Excavatio 212798 212816 SR LHS 18.0
Layout of
n
NB 02/Jul/22 Retaining 206480 206500 MCW RHS 20.0
Layoutfor
Wall of
Raft
Retaining
NB 02/Jul/22 Layout of 190090 190110 SR LHS 20.0
Wall for
Retaining
Raft
NB 02/Jul/22 Layout
Wall forof 189880 189920 SR LHS 40.0
Excavatio
Retaining
NB 02/Jul/22 Walln for 190060 190090 SR LHS 30.0
Excavatio
Row
n
NB 02/Jul/22 Marking 198300 198360 LHS 60.0
Raft of
6.09(b) 02/Jul/22 vup (M- 226237 VUP MCW LHS 1
35)
Retaining
12.02(b)(i) 04/Jul/22 wall PCC 195010 195030 MCW LHS 1 20.0
(M-10)
8.03(a) 04/Jul/22 Drain Toe
PCC 208604 208650 SR RHS 1 46.0
(M-15)
Retaining
12.02(b)(ii) 04/Jul/22 wall Toe
Final 206870 206893 SR RHS 1 23.00
Retaining
lift RCC
NB 04/Jul/22 Wall Final
(M-30) 206870 206893 SR RHS 1
LiftToe
boom
Retaining
placer
12.02(b)(ii) 04/Jul/22 RCC
wallM-30
1st 206953 206965 SR RHS 1 12.0
New Jursy
lift RCC
Crash
9.05 04/Jul/22 (M-30) 216400 216400 MCW RHS 25 50
Barrier
Layout of M
-30
Toe
NB 04/Jul/22 206040 206060 MCW RHS 20.0
Retaining
Layout of
Wall
Retaining
NB 04/Jul/22 Row 206823 206840 SR RHS 17.0
Wall for
inspection
Raft
NB 04/Jul/22 by adani
Row & 190200 190800
Govt
inspection
NB 04/Jul/22 byofficer
adani & 198300 198450
Govt
Test pile
NB officer
04/Jul/22 coordinat 201704
e taken
12.01(a)i 04/Jul/22 RE Panel 215800 Camp- A 10 3.118
Casting Nandi
RE Panel Camp-
12.01(a)i 04/Jul/22 215800 B 1 1.738
Casting Nandi
RE
12.01(a)i 04/Jul/22 Casting Panel 215800 Camp- LTB 1 3.84
Nandi
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi A(T) 86 3.118
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi B(T) 12 1.738

12.01(a)i 04/Jul/22 RE Panel 215800 Camp- STC(T) 4 2.683


Casting Nandi
RE Panel Camp-
12.01(a)i 04/Jul/22 215800 LTD(T) 5 4.572
Casting Nandi
RE
12.01(a)i 04/Jul/22 Casting Panel 215800 Camp- LTC(T) 3 4.206
Nandi
12.01(a)i 04/Jul/22 RE Panel 215800 Camp- LTB(T) 5 3.840
Casting Nandi
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi LTA(T) 6 3.474
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi NHAI 1 3.118

12.01(a)i 04/Jul/22 RE Panel


Casting 215800 Camp-
Nandi A 34 3.118
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi B 10 1.738
RE Panel Camp-
12.01(a)i 04/Jul/22 Casting 215800 Nandi LTB 4 3.840
Retaining
12.02(b)(ii) 05/Jul/22 wallToe
raft 206250 206270 MCW LHS 1 20.00
RCC (M-
Retaining
30)
12.02(b)(ii) 05/Jul/22 wall 1st 206240 206260 MCW RHS 1 20.0
lift RCC
12.01(a)i 05/Jul/22 RE Panel
(M-30)
Casting 215800 Camp-
Nandi A 46 3.118

12.01(a)i 05/Jul/22 RE Panel 215800 Camp- B 2 1.738


Casting Nandi
RE Panel Camp-
12.01(a)i 05/Jul/22 Casting 215800 Nandi LTD 2 4.572

12.01(a)i 05/Jul/22 RE Panel 215800 Camp- LTB 1 3.840


Casting Nandi
12.01(a)i 05/Jul/22 RE Panel 215800 Camp- LTA 2 3.474
Casting Nandi
12.01(a)i 05/Jul/22 RE Panel
Casting 215800 Camp-
Nandi LTC 1 4.206

12.01(a)i 05/Jul/22 RE Panel 215800 Camp- NHAI 1 3.118


Casting
New Jursy Nandi
9.05 05/Jul/22 Crash 216400 216400 MCW RHS 25 50
Barrier M
Pot-30
Holes/
10.01 05/Jul/22 Repair of 216000 221200 BHS 1 5200.0
Patch
7.000 Cum 9 TotalTiket
Steel Recivied (12mm-26.52MT)

46.770 Sqm 105Cum 42 Tiket Strata Panels

8.690 Sqm Tiket Strata Panels

4.572 Sqm Tiket Strata Panels

4.206 Sqm Tiket Strata Panels

280.620 Sqm Tiket Terrain Panels

19.118 Sqm Tiket Terrain Panels

10.732 Sqm Tiket Terrain Panels

82.296 Sqm Tiket Terrain Panels

4.206 Sqm Tiket Terrain Panels

3.118 Sqm Tiket Strata Panels

15.590 Sqm 2 Sunil Kumar


Strata Panels

4.206 Sqm Sunil Kumar


Strata Panels

59.242 Sqm 8 Shankar Infotech


Strata Panels

17.380 Sqm Shankar Infotech


Strata Panels

4.206 Sqm Shankar Infotech


Strata Panels

1.500 0.125 3.750 Cum 6Bharat Vishavkarma

2.300 0.100 4.600 Cum 7 Aparna KK

2.550 1.200 61.200 Cum Self


2.600 0.100 5.200 Cum 6 Sultan Ali

1.450 0.640 20.416 Cum 12 JMD

0.500 Cum JMD

1.100 0.340 8.602 Cum 8 Jai Mangala

0.500 Cum Jai Mangala

0.700 0.400 3.360 Cum Jai Mangala

2.125 0.250 6.375 Cum Jai Mangala

1.350 0.275 3.713 Cum 6 Jai Mangala

12.500 0.450 hac. Self

6.000 hrs Self Ex no. -17

15.500 0.310 hac. Self

6.700 hrs Self Ex no. -25


4 Deepak

2 OM Praksh

OM Praksh

OM Praksh

OM Praksh

2 Deepak

Deepak

Deepak

7.000 Cum 9 TotalTiket


Steel Recivied (12mm-26.52MT)

49.888 Sqm 88Cum. 42 Tiket Strata Panels

8.690 Sqm Tiket Strata Panels

3.840 Sqm Tiket Strata Panels

212.024 Sqm Tiket Terrain Panels

3.476 Sqm Tiket Terrain Panels

12.166 Sqm Tiket Terrain Panels

10.732 Sqm Tiket Terrain Panels

27.432 Sqm Tiket Terrain Panels

8.412 Sqm Tiket Terrain Panels

15.360 Sqm Tiket Terrain Panels

13.896 Sqm Tiket Terrain Panels


3.118 Sqm Tiket Terrain Panels

18.708 Sqm 18 Sunil Kumar


Strata Panels

10.428 Sqm Sunil Kumar


Strata Panels

7.680 Sqm Sunil Kumar


Strata Panels

62.140 Sqm Sunil Kumar


Strata Panels

3.20 0.250 7.000 Cum 8 JMD

0.15 0.150 0.360 Cum JMD

0.25 1.250 5.469 Cum JMD

3.20 0.250 7.200 Cum JMD

0.150 0.150 0.405 Cum JMD

0.25 1.250 5.625 Cum JMD

1.50 0.150 2.250 Cum 6 Akhtar Ali

1.50 0.150 2.250 Cum Akhtar Ali

1.50 0.150 2.250 Cum Akhtar Ali

0.10 0.600 0.840 Cum 14


Mohammad Shakeer

1.50 0.150 2.250 Cum Mohammad Shakeer

1.50 0.150 2.250 Cum Mohammad Shakeer

1.50 0.150 2.250 Cum Mohammad Shakeer

1.50 0.150 1.575 Cum Mohammad Shakeer

12.50 0.050 hac. Self

12.50 0.250 hac. Self

5.400 hrs Self Ex no. -21

2 OM Praksh

OM Praksh

OM Praksh

OM Praksh

OM Praksh

OM Praksh

OM Praksh

85.00 Cum 11 JMD


0.15 2.500 7.500 Cum 8Mohammad Shakeer

1.65 0.075 5.693 Cum 8 Rakesh kumar

0.90 0.230 4.761 Cum 5 Jai Mangala

0.500 Cum Jai Mangala

0.270 1.350 4.374 Cum Jai Mangala

14.250 Cum 9 TotalTiket


Steel Recivied (12mm-26.52MT)

2 OM Praksh

OM Praksh

OM Praksh

OM Praksh

OM Praksh

31.180 Sqm 103.75Cum. 42 Tiket Strata Panels

1.738 Sqm Tiket Strata Panels

3.840 Sqm Tiket Strata Panels

268.148 Sqm Tiket Terrain Panels

20.856 Sqm Tiket Terrain Panels

10.732 Sqm Tiket Terrain Panels

22.860 Sqm Tiket Terrain Panels

12.618 Sqm Tiket Terrain Panels

19.200 Sqm Tiket Terrain Panels

20.844 Sqm Tiket Terrain Panels

3.118 Sqm Tiket Terrain Panels

106.012 Sqm 18 Sunil Kumar


Strata Panels

17.380 Sqm Sunil Kumar


Strata Panels

15.360 Sqm Sunil Kumar


Strata Panels
3.10 0.325 20.150 Cum 9 JMD

1.1 0.275 6.050 Cum 5 Habib

143.428 Sqm 32Cum. Tiket Terrain Panels

3.476 Sqm Tiket Terrain Panels

9.144 Sqm Tiket Terrain Panels

3.840 Sqm Tiket Terrain Panels

6.948 Sqm Tiket Terrain Panels

4.206 Sqm Tiket Terrain Panels

3.118 Sqm Tiket Terrain Panels

14.000 Cum 9 TotalTiket


Steel Recivied (12mm-26.52MT)
DLC-
- Sqm Self 2Cum.
mm-26.52MT)
mm-26.52MT)
mm-26.52MT)
mm-26.52MT)