nr.crt. material
UNITATE MASURA
PARTER etaj 1 terasa total
1 TENCUIALAmp 99.16 77.58 0.00 176.74
2 LAVABILA mp 121.60 145.60 0.00 267.20
3 PERETE SI mp 5.46 12.45 17.91
4 PERETE SIMmp 5.97 10.56 16.53
5 PERETE DUmp 1.53 20.98 22.51
6 VATA MINEmp 7.50 35.04 42.54
7 SAPA mp 50.85 39.44 42.65 132.94
8 TAVAN RIGmp 1.77 5.20 6.97
9 TAVAN RIGmp 11.44 10.70 22.14
10 POLISTIRE mp 39.85 39.85
11 POLISTIRE mp 42.65 42.65
12 GRESIE BAImp 8.90 9.62 18.52
13 FAIANTA BAmp 16.80 21.46 38.26
14 PARCHET mp 27.20 25.30 52.50
15 CERAMICAmp 13.88 3.80 6.37 24.05
16 BALUSTRADml 4.91 4.91
17 BALUSTRA ml 7.30 7.30
18 COLTAR ALml 0.00 3.00 3.00
19 VAS WC 1.00 1.00 2.00
20 CHIUVETA BAIE 1.00 1.00 2.00
21 CADA 1.70 m 1.00 1.00
calcul pe o vila
calcul pe o vila