You are on page 1of 1

BAR BENDING SCHEDULE

PROJECT : PEMBINAAN PENSTORAN PUNCA RADIOAKTIF TERKEDAP (DSRS) BAR SCHEDULE REF:
DI AGENSI NUKLEAR MALAYSIA, BANGI, SELANGOR DATE PREPARED:
CONTRACTOR : PARALLEL TRADING PREPARED BY:

DRAWING REF: COMPONENT: Beam / Column / Wall / Slab / Misc (stated):

LEVEL: ZONE: MEMBER MARK: GRIDLINE:


LAPPING (mm): CONCRETE COVER (mm):
Nos bars in
Description Bar Mark Nos Mbrs each Type Size (mm) Total Nos Bar Length Space c/c Shape Total (Kg)

Total :

*all dimensions are in milimeters unless stated