Question 1
Incorrect
The correct answer is: Set up possible courses of action for testing.
Question 2
Correct
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 1/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 3
Correct
The correct answer is: Summing all the previous probabilities up to the current value of the variable.
Question 4
Correct
Question 5
Correct
All of the following are various ways of generating random numbers except
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 2/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 6
Correct
Question 7
Correct
As simulation is not an analytical model, therefore, the result of simulation must be viewed as
a. unrealistic
b. exact
c. approximation
d. simplified
Question 8
Correct
a. not necessary to assign the exact range of random number interval as the probability
b. necessary to develop a cumulative probability distribution
c. necessary to assign the particular appropriate random numbers
d. all the given options
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 3/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 9
Correct
Question 10
Correct
Simulation is defined as
Question 11
Correct
The correct answer is: when two activities share the same starting and ending node
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 4/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 12
Correct
……….. is the duration by which an activity can be delayed without delaying the project.
a. Slack
b. Total float
c. Free float
d. Independent float
Question 13
Correct
The shortest possible time in which an activity can be achieved under ideal circumstances is known as:
Question 14
Correct
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete
an activityis known as:
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 5/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 15
Correct
The correct answer is: cannot be delayed; else the entire project will be delayed
Question 16
Incorrect
If an activity can be completed in 12 days in favorable conditions whereas it may take up to 20 days if situation does
not turn out to be favorable but there are chances that it may be completed in 19 days. What is the expected
completion time of the activity?
a. 16 days
b. 17 days
c. 18 days
d. 19 days
Question 17
Correct
A dummy activity
a. is artificially introduced
b. is represented by a dotted line
c. does not consume time
d. All of the given options
https://cdoe.bharatividyapeeth.integratededucation.pwc.in/lms/mod/quiz/review.php?attempt=182918&cmid=38617 6/7
1/23/23, 1:41 PM Internal Assessment - 3: Attempt review
Question 18
Correct
The difference between the time available to do a job and the time required to do the job, is known as
a. event
b. float
c. duration
d. constraint
Question 19
Correct
a. normal distribution
b. Poisson distribution
c. binomial distribution
d. None of the given options
Question 20
Correct
…….. is that sequence of activities which determines the total project time.
a. Network
b. Critical path
c. Critical activities
d. None of the given options