Although the process is not thoroughly planned and monitored the required output work products
will be achieved.
Customer requirement System requirement Software requirements Derived requirement.
a. We need to ensure the software requirements are impacting the operating environment.
b. This can be analyzed by considering the things like RAM,ROM,CPU usage of controller, range of
analog signals like current,voltage,pressure and temperature.
a. Verification criteria is written by the requirement engineer , the verification criteria will act as
the input for writing the test cases for testing the requirement.
b. In Verification criteria we should mention the conditions and scenarios to test the particular
requirements.
We need to ensure the software requirements written is consistent with the system requirements.
Communicate the agreed software requirements and updates to software requirements to all relevant
Stakeholder(SW Architect, Developer,Application tester).
Level 2 - Managed:
The level 1 performed process is now implemented in a managed fashion (planned, monitored and
adjusted) and its work products are well established, controlled and maintained.
Here we need to ensure how the Goals (Quality Goals) are tracked and documented for the particular
process area.
EG: In our organization the metrics will be performed for each customer release in Software
requirements process area we will ensure the following
And the Effort estimation is planned for performing the task related to each process area.
Eg: If we take software requirements process area the task estimation should be available for writing the
requirements, for doing the impact analysis and for performing the review.
Also the CRs should be planned for performing the particular task and it should be assigned for
responsible requirement engineer.
GP2 .1.3 Monitor the performance of the process against the plans