You are on page 1of 8
GUJRANWALA ELECTRIC POWER COMPANY LIMITED TEST. CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW 1. NamecfDivision/SDin (LOL fA_ ACNo.. 29721726 - Soo Feeds. 2 Names aduress __ AUS Fre Gar 3. kind of industry nant ee bo A Phew 4. Name of Feeder App: No & Date 5. Scope of Work < ou (ie T-TOW METER EXIST/INSTAI KWH 1. TouMeterNo, of CFFY D KVARI 2. SIM/No 0 Be G2 YE 3. Make Crane 4 Capacity cre 5. Constant Yarra, Yoou'my 6 Volt/ Phase DRoye3hgoy 27e prog 7. Reading Total a dy o 6h 246 GA2 8. MOI ae, oO: 32P 9. KWwSum a PE fo3? ra 10. Reset No. od fe ‘MULTIPLICATION FACTOR AS INDICATED FOR BILLING wm _ nl am een 1 2. KVARH eee se gy EY 3. MDI xX4o XG o 4. KWSum 2xue __ #xgo CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) "Beeston _ deri = COMPLETE READING CYCLE OF DIGITAL METER {WLY INSTALLED / E; REMOVED IMPORT EXPORT Date {-U- 2 Date_?S74 2-2 Time__! 2e Time__/2-9 2 KWH Total PS KWH Total_os ot KWH Total 2622 kw sum_/2°3. 1 ore ™ at 1 at Tt Se T2 ads 72. 22 4S 72, Le 3 Zz KVARH Total_e- 62 wna Total_a+ ae KVARH Total 9 22. Reset No,_/e 1 ee oe NWLEE. Instant KW_e +7 f 2 ab poe T__#6 € Instant KV__— MOI Total__arow MDI Total__2" ov MOI Total_e *2P 71. m1 71, 2 stig 72. Z T2 Z 2 o'Zp KW Sum, DS KW Sum __g + aw TA. oto Ti 2g 12 7. Reset. oo SQ0,(QP) XEN (OP) T PECTOR ae ‘Al (M&T) oS SiDivn Divn NO._Z TECH ERVICES (M&T) LE GEPCO Gert GEPCO GRW CITY CIRCLE GEPCO Scanned with CamScanner dre rcsiess ye Five S: er Eveeds NCNO, LILY 26-902 Poe Meter Checking Result ‘Accuracy. With in Permissible limits of error 8, Newly pasted M’S-Sttps / Postal order. Meter WE SEY P GT To SP he 5 ATB: Inside Glass. Outside Glass. == Top, if 7 Bottom. SELLE, Right Side. SOCLE 2 Lett Side. SOLIS 2 ‘9. MSS (REMOVED) BL _/S2-33) te 3G 140. MSS (RETAINED). wo/o (6) PP 11. TIF Capacity / In depended / Make / Sr No._2990 few rind —_—=- 12. LT Bushing MSS Nos. e 13 Wired by. Name_@72 ‘43 277 Signature, 5 2 44,Tested by. Name. 24, tak Ahmed Signature, 415, Date of execution of work: Sif ae ae” 16. Detail of Work done / Observation / Recommendations. The_technical_committee_visited the _site_on dated _15-11-2022_for_replacement_of TOU with bidirectional AMR meter, Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter and installed new bidirectional AMR meter, complete the job check the accuracy of new meter on heater load and found with in permissible limits of error, After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. Pal gl 18. Name Designation Signature Date 1, Men Fora Ph rrael_ XEN Operation GEPCO Division AZ _ 2 ALG Pe __ civcle Manager (MET) : Gircle GEPCO City 3. Arle? base Bawa ‘$D0 Operation GEPCO. SiDivision, 4 Consumer f Consumers _ Representative Endst No. lé obf-69 Date ! 12022 Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. 2, The Manager (M&T) GEPCO, Ltd. Gujranwala, 3. The XEN (Operation) Division__AV4¢/" _ GEPCO. 4, The SDO (Operation) ‘SiDivision GEPCO. CIRCLE MANA CITY CIRC] Scanned with CamScanner GUJRANWALA ELEC] ‘TEST. CHECK PROFORMA IN RES! TRC “OWER COMPANY LIMITED OF CONNECTION HAVING LOAD UPTO 499 KW 6 Nancorowiion soon NOP LR spon. ABE = LE F390. cpt Sha 7. Name & Address 8. Kind of industry / Tariff /SLoad, 9. Name of Feeder App: No & Date Age to ew Leblue. Matlice_tiylag aim Fu wth Pane woe ter 10. Scope of Work: terou meter (fhe ms KWH KI “RT KVARH 11 TouMeterNo L222 7 2m Zot 12.SimNo 332-0 G29 7 13. Make denree Sheec 44 capacty 10 [ 0 f- 15. Constant Yecopmp ion? 16. Volt /Phase VP, A Wir L 230/400. 907, 4 Wire L 17, Reading Total LY, 2:%e YI 55O 22926 18 MOI nies, Pe 18 KWsum Ly Po Ge L 20. Reset No 03 _ q ! 5 KWH bkbe Lu phim 6 KVARH ee 7. MDI 7 8 KWSum CT Ratio: ———— ens saps CT Ratio ee vo COMPLETE READING. = tetcow OF pomaierey MEIER CT Ratio =. Date OP—K-2-2 Date time_/P ite Time. KH Total_2 0 kw sum_ 227, KWHToal 42 STD = KWSUM_lly $2 a vr 11, Ooo W399 2. TH_PGroe 12 6 72, 2/ T2, ZC. 2. Po*p2 13 z= 13, e 73. 73. = KVARH Tolal_g=22 ResetNo__O.2 igs Total 22920 Reset No. 1 +02. Instant KW_g+4 $e 1190 G2. Instant KW__ 2 “ fa Instant KV. te aD Instant KV. 13 Instant PF. 13 Instant PF, MOI Total_@+ Ze AVP. MOI Total_o* C2. AVP. m1 Tl_#S52. 72. 7 a Fe 13 73. = Siva Diva NO, ES (M&T) Scanned with CamScanner f ee gy Allee NONO_2ILLY 5 - LEFLG oe gE Result With in Permissible limits of error fret = a 3s / Postal order SE230 2 G2. Te. SE AIIP J x: Fe iane oe outside Glass Top. Bottom. Kreseaa gn Sie, 62409 Spon 2407 MSS (REMOVED) 40 MSS (RETAINED). aa 11, TWF Capacity /in depended ! Make /StNo__ feo kere. _ tne ———— 12. LT Bushing M.S Nos. ta.wiedty. Name c/mnes Baths Signature, ve tesecty, nore 2 tab Abn! Binsin 15 Date of execution of work 63° fM—2¢ 22 16. Detail of Work done / Observation / Recommendations. The technical committee visited the site on dated 03-10-2022 for replacement of display dim meter with AMR meter. Before opening the A.T.B checked the accuracy of meter and found with in BSS display dim. Then open the A.1.B removed the old TOU meter and installed new AMR meter, Complete the job check the accuracy of new meter_on heater load_and_found with in permissible limits of error. Afier that close the A.T.B welded & pasted postal order which is dully sioned by the technical committee as mentioned above, NOTE? down load data. Down load data attached. fe Ps Designation Signature pate Removed meter reading taken by 18 Name, 1 taden [rtd Lee sen opztoion SERCO —_—= DwisiongVeey 2: LOZ ote Circle Manage’ (M&T) = Cree GEPCO City , » Arhar Prsod Lhd onS_ 00 Operavon SEPCO srowsien ‘ So vas Resresentatve -S6 pate ! row Endst No Copy Forwarded For Information ‘The SE (Operation) GEPCO CITY CIRCLE. ‘The Manager (M&T) GEPCO, Ltd. Gujranwala, 2 3. The XEN (Operation) Division, wily GEPCO. 4, The $D0 (Operation) nna S/Division GEPCO. CIRCLE MARA CITY CIRG) Scanned with CamScanner GUJRANWALA ELECTRIC POWER COMPANY LIMITED ‘TEST. CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW 1 NameotDivision spin AD / C-Bela sicwo.GG-)2186-03886303 . 2 Names address See Nadleem Adbak 3. Kind of Industry / Tantt/Stoad_Zzcets na/ds & to liy 70 G80 tw. 4. Namootiveter Cone: Meo £932 fo f-it-22. App: No & Date L2AK 100/44 [83 [Lan [25-10-22 8 scopeotwox Laaheteen Of Laact Ledebiig LA-TOU METER ENISTING/INSTAEL KVARH Tou Meter No. ut Co Sim No ft. Make Create 2 3 4 Capacity Sonny 5. Constant Yee if? 6 Vot/Prase 2Be-yar SPY, 7 7 Resting Toa! __ SS 58 / & MOI (xe7) / i 8 KWSum Sf 10. Reset No oo. £ NEW REMOVED 1. KWH it bO 2. KVARH 4 (66 3. MDI LA 160 4 KWSum L Eile CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) = Se/s Pp = t COMPLETE READING CYCLE OF DIGITAL METEI NBWLY INSTALLED / EXISTING REMOVED Date_G2-//-22 Date, Time_ L7H Time. KWH Total_ 23: kwsum_7 5 KWH Total KW SUM, Tt SF 11. b.89 Th. 11, 12 2y 12, 5) T2 72, B any 13 — 3 I 73 i KVARH Total_ 5S” ResetNo__@ KVARH Total__/ ResetNo__] 1 2 Instant KW_Q-O95 TH if Instant KW. 12 cb Instant KV__— 72. Instant KV, 13 = Instant PF, a 13, Instant PF MOI Total_0-0% AVPE, MODI Total AVP. TM 0-00 1 Ta 6g 12, 13 = 13, Lf Manace Sp040P, XEW{OP) T ECTOR CIRCLE (Mist) CULE. sion dvnNO cup TECHNIRE SERVICES (MST) CITY. GEPCO GEPCO GRW CITY CIRCLE GEPCO. Scanned with CamScanner sadtress Sel NVacleerm Pbbabsic no 2812/96 - O38 68 23 tor Checking Result oy wt fremntsbe Aww of Evvrer JATB Position / Welding Status, OUsrrole Bfol . 4 Newly pasted M/S. Slips / Postal order. Meter, Te, ATB: Inside Glass, outside Glass, Top, Bottom, Right Side___// Z Let side__ 7 10. MSS (REMOVED). Le Ze {MSS(RETANED) 228 er econ 42. TIF Capacity /In depended ! Make 1 Sr No__ 4.3060 13, LY Byshyhg M.S S Nos f, ‘oe 14 CaeSty. Name_Leoevenn ke Aadea! Signature, No 45 Testedby Name__SP/E wl/a4 ZF Signature. 16. Date of execution of work: O2--“Y- 2022 » 17. Detail of Work done / Observation / Recommendations. Comnrite tttdlul We. Atle 02 ofadad 2 2022 Kor “Cachittin of [ae al Yeoln to B20 fae 4, Checks Ch echset phe_qeewraw of pmisiing Rohe nuts pm BLpAsic Feat rest _£ imdt popbh Ler wd sehle ly, of eaver ko _matint “Neauned « 18 Name . Designation Signature Date ior 1, Man Lotta2 fbwetf yer Operation GEPCO . Division_ AVA” « 2 at: Ase Hares Circie Manager (M&T) Circle GEPCO City. » Drkar fodwed bazee s00 optaran GEPCO srovision CfAeLn » 4. Consumer / Consumers Representative enastivo_ GOCE PL. pate Oot __// _rao2z Copy Forwarded For Information 4. The SE (Operation) GEPCO CITY CIRCLE, 2, The Manager (M&T) GEPCO, Ltd. Gujranwala. 3, The XEN (Operation) Division, Vail’. GEPCO. 4, The SDO (Operation) SiDivision GEPCO, CIRCLE MANBGRFC(ET) CITY CIBeETE GWWALA Scanned with CamScanner GUIRANWALA ELECTRIC POWER COMPANY LIMITED ‘TEST.CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW 4 KaneotDinsen/Sbim AZ GQ ero BrB bie Ber Ger 2. Name & Address Langan gnkem ~ 3 Kindof industry /Tarif/Stood Bo 4. Name of Feeder App: No & Date 5. Scopeof Work Lk lace Le wit pug meted: J-TOU METER EXISTING / INSTA LT-TOU REMOVED KWH Kw 1. Tou Meter No. oklFi/7 IG SID 2. SimNo e3lo-42 6Yorg 3. Make Creative IFC 4 Capacity S/10 SHO 7 5. Constant 4000 IMP (0mm fon 4 6 Volt/Phase 230/400 2/P, 4 Wire 230/400 3/P, 4 Wire 7. Reading Total a? oS 420% F324) 8. MOI oe LUZ 3. KWSum oF 7 GA2~ if 2 10. Reset No if: G2 ‘MULTIPLICATION FACTOR AS INDICATED FOR BILLING NeW EXISTING REMOVED i wn _ExU'o Ryuwa 2. KVARH Lx4o 2Yyuo 3. MDI z ¥4 o Z x 4 2 4. KWSum C40 L LYS, CT Ratio (installed) CT Ratio (Existing) CT Ratio (Removed) — A0ol ponf = COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / PXTSTING REMOVED Date_24-Yu2 2 Date__» @-/-/2 Time__ p68 £7 Time__ F225 KWH Total__o: 27 KW Sum oh KWH Total p22

You might also like