You are on page 1of 16
— Came & Access _ A= Tafas's 7. Meter Checking Result Accuracy With in Permissible limits of error 8. Newly pasted MS-Stps/ Postal order: WONo. 28-1 36-0° 19 o/ Meter_ewE 6324 42.992 ro_WE 632°% ATB Inside Glass__6399 459 96 outside Glass__G32P 2 Top. 632049 Bottom, 6328 Se, ST Right Side. E222 5>- Left Side, C320 £2 9. MS.S (REMOVED), 10. MSS (RETAINED), 11. TIE Capacity In depended ! Make / Sr No_ Se Led ind Sei fours 2-22 797 12. LT Bushing M.S.S Nos. 43. Weed by. Name_a? ‘727 ___ ta Teste by, Nome_ 204m oh mee signature, (eH 15, Date of execution ofwok: _-_—'4-72.= 202-2. N 416. Detail of Work done / Observation / Recommendations, The _technical_committee_visited the Committee, job resto load and found with in permissible limits o1 site_on_dated 14-12-2022 to_install_new connection. installed new AMR meter with CTS 100/5 Amp in new ATB on. poll, Complete the res the supply from 50 KVA ‘I/F, Check the accuracy of new meter on 3/phase heater f error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical commitice as mentioned above, / | 18, Name Designation Signature Date 1. Athen Fear Ha. Litbomedl _ xen Operation SEPCO Division_ YO?” 220A (Aas Circle Manager (M87) Circle GEPCO City. 3 Basse _ s00 Operation GEPCO ‘SIDivision_ ‘ Consumer / Consumers Representative enasto__Le 73-26 pate __2e _}_/2- 022 Copy Forwarded For Information 4, The SE (Operation) GEPCO CITY: ‘CIRCLE. 2. The Manager (M&T) GEPCO, Lis. Guranwala 3. The XEN (Operation) Division_AVd Zz" _GEPCO. \ 4. The SDO (Operation) CG sirvision strc . CIRCLE MANAGER (M&T) CITY, LIRCLE G/WALA ______—_nnnn Scanned with CamScanner JRANWALA ELECTRIC POWER COMPANY LIMITED TESTCHECK PROFORMA IN ECT. OF CONNECTION HAVING LOAD UPTO 499 KW < - - 00 4 Nameofpivsion sim Nel AA nyc QLBIPE= °° 219) 2 Names address _Bfahs mpomad Tafare > 39 Ky 3. Kind of industry /Tarif/ Stoad__________ Bay BP Ry 4. App No&pae 3/2 BGM 04-22. sco:.Nosvae_ [LYS A _WSHea2 5. Scope of Work I-TOU REMOVE! KVARH 1. TouMeterNo. oA SPU? 2. Sim No ° 3-276 992 3. Make Creative / 4. Capacity S40 & 5. Constant 4000 IMP [ 6. Volt/ Phase 230/400 3/, 4 Wire 7. Reading Total op 2-22, [ 8. MOI oa? [ 9. KWsum, L2Z2 L [ 10. Reset No 2 U mu ON IND RB Ry 5 BBe EXISTING REMOVED 1. KWH x 22, 1 2. KVARH %2o L 3. MDI Rt 20 Z- 4. KW Sum Lez CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) ‘ool nf = = COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED Datefy-/2~ 202.2 Date, Tine___ #9. ger Time, KWH Total__/14 2 Kwsum_“22 KWH Total KW suM. TH aoe 1. 2:00 1 11 ) 12 L'97- 12 2m 72, 72, 13 = 13, 13. 73 KVARH Total_o 92 ResetNo__a/ KVARH Total Reset No. 1 oe Instant KW_o"3 & 11 Instant KW, 2 a9 2. Instant i, r Instant KV. 13 = Instant P.F___7 13, [ Instant P, MDI Total__a» aa. AVPE. MOI Total, APE TH TH, 12, 7, 73. ; cor) SDQ,(0P) : siivn Dien NO. fy CUNICAL, eCORW PCOGRW CITY CIRCLE Scanned with CamScanner J.Name & Address 79S /a om acno_ZP- £4 36— 1°? Faro 7. Meter Checking Result: Accuracy With in Permissible limits of error 8. Newly pasted MYS-Stips / Postal order: mere WE 600496, PC ro 8 99S. ATB: Inside Glass, outside Glass, = Top, x fe Botom__fpo 999» UP Right Side__ 62249 J Let Side___ Gar Sore 9. M.S.S (REMOVED) wefhed rut 10. M.S.S (RETAINED), SFIBGGOS > F 2 11. TF Capacity / In depended / Make /SNo__ ev Iv __Line — _ 12, LT Bushing M.S.S Nos. = 13.Wired by. Name_@77- LyJ0ra-m Signature, 14. Tested by. Name, cabling y Pome dl Signature. 18, Date of execution of work 24-/2.— 202 2 16. Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter_and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which 1s dully signed by the technical committee as mentioned above, // 18. Name Designation Signature Date Wign Prot fier. (Boma ¥en Operation GEPCO Division AsozZ 227", Ebsen (fam, F__ circle Manager (M&T) Circle GEPCO City. 3._AZ A, as based fe, atoo Operation GEPCO. siDivision_ CLA, Consumer / Consumers Representative Endst No 17 40}—04 pate 29) _/2 row Copy Forwarded For Information. 1, The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Ltd. Gujranwala. 3. The XEN (Operation) Division__e4p _ GEPCO. 4 |. The SDO (Operation) Re = SiDivision GEPCO. Scanned with CamScanner i a = j ‘TEST CHECK PROFORMA IN RES CLA — sco BALL BE-IS Poot _ 1. Nameot Division /s.0in AZO ZZ 2. Name & Address 10 bilan ea ead 3. Kind of Industry / Tariff / S.Load_ 4. App: No & Date = SCO: No & Date 5. scopecrvank _RePlace 7a0 wih Ame enefe> - ER PXISTING / INSTAL LT-TOU REMOVED ow KVARU 1. ToumeterNo. e2/F SPR 27777 2 smno o W= 27-4593 = 3. Make —Lreative —K Bk 4. capacity sno 510 [ 5. Constant 4000 IMP f- __ fever? 6. Volt/Prase 230/400 3/P, 4 Wite 2301400 4/2, 4 Wire 7. Reading Total REY) ae OB. 8 MDI acd o 8. KWSum o-fe 3BE6R 10. Reset No. 2, LD. Pl INDICATED FoR BL NEW EXISTING REMOVED 1. KWH AS Rxge 2. KVARH 3. MDI Peo 2 4. KW Sum Lege 2 CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) yal, QO v6 ad COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED Date 24-72 ~2022- Date_24-/2.°2.2. ‘Time, LB. oe Time_ KWHToala=gZe — KWwsim_o-Po KwiTel GREP Kwsun_ 88-53 "1 FECES 11. Fo 12 TL P-e F 12 22S 72, GF 2. U2 T2__2P fo 3 = 13. 13, 13 KVARH Total_a*US Reset No. Z KVARH Total 5p C Reset No. /7 "1 2°32 Instant KW__pope 1LOL Instant KW_p-/o 2 ol? Instant KV_ 72, TRY Instant KV. 13 = Instant 13 = Instant PF, MDI Total__grao_ AVP, MDI Total_p+ Ro AVP, 1 2 73. spo,gr) XEUOP) siivn Dien NO. ZZ Gere GEPCO GRW Name & Address, on: Lblam acno_27'GY %-“59I 2-00 7. Meter Checking Result: Accuracy, in Permissible limits of error 8, Newly pasted MYS-Stips / Postal order: meter WE GOTO? , Og To. aS 22. ATB: Inside Glass, 7 outside Glass, Top. Bottom__WWE 6, ie Right side__ 6 %2PTP Let side_ GC 2P TP 9. M.S.S (REMOVED), wafhed cut 40. M.S.S (RETAINED), WE Sol A> 32. 11. T/F Capacity /In depended / Make / SrNo,_S2. aa 1nd. aa Si 12. LT Bushing M.S.S Nos, 13, Wired by, Name_@7Q~ | Joxaen Signature. 14, Tested by. Name. Lobfina Lewd. Signature, 15.Date of execution of work: _2-4Y’— (2. — Ze 2-2 16. Detail of Work done / Observation / Recommendations. The technical committee ited the site for replacement of TOU meter with AMR meter, Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter _and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. f fo ee 18. Name Designation Signature Date 1Man Lo XEN Operation GEPCO Division ip 2 -her om Circle Manager (M&T) Circle GEPCO City : sfohaa La bun / fa. 14400 Operation GEPCO s/Division, “8 4. Consumer / Consumers Representative Endst No 1F405-08 vate 29 ) 72 raoza Copy Forwarded For Information. 4. The SE (Operation) GEPCO CI"Y CIRCLE. 2. The Manager (M&T) GEPCO, Ltd, Gujranwala 3. The XEN (Operation) Division, Zy_— SEPCO. 4, |. The SDO (Operation) _¢ 78: ‘SiDivision GEPCO, Scanned with CamScanner Gi ELECTRICEO WER COMPANY. AMITED All Se nCT OF CONNECTION HAVING LOAD UPTO 499 KW TEST CHECK PROFORMA RES? ono 2EVH 36-1599 700 _ Name of Division sien ADLY ...-—© CXA AIENS Name & Address Lien P. her Kind of Industry / Tariff / ce App: No & Date SCO: No & Date pia sopearon ROP lace 7a0 wh Am nexer- LT-TOU METER RS SHNG / INSTALL -TOU REMOVED RU ope? 1, Tou Meter No. SY 96 2 smNo 0 sn 2aeiy 7 3. Make Creative 4. Capacity 5/10 5/0 5. Constant 4000 IMP. Ye90) mp 6. Volt/ Phase 230/400 SIP, 4 "fina 230/400 3/P, 4 Wire 7. Reading Total ap 2D 3k 8. MOI ood 0: 9. KWSum 0-99 7 sit 40. Reset No. od 3? NEw REMOVED sown BB 22 1S eee 2, KVARH 3 mo xD ; 4. KWSum 2x20 aa CT Ratio alan js Ratio va CT Ratio (Removed) a w'LETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED: date 24-12 -2-2- Date 24-12 202 2 time__1F21y Time, Yo KWH Total_pp 92 kw sum_o* KWH Total wwsun 317 a 22. " ate 129 1 p20 12 oA? 12, 7] w_jop T2__3-0Y 3 T3, S T3, =_ 73, — KVARH Total_g 9? Reset No._0) KVARH Total_ > Reset No_@ 2. 1 eo Instant KW_a+ 24) T__#2 Instant KW_O~ 12 2:33 Instant KV. 12, Instant KV. 3 es instant P___7 73, pes Instant PF, MDI Total__°* 22 AVP. P MDI Total__q sor? AVPE T1. 71, ‘73. 73, sector CITY CHRCLE GEPCO ~ Scanned with CamScanner .. Name & Address_K ans Mall ac NO_ 2S Y- 19 32. of 7. Meter Checking Result, ‘Accuracy, With in Permissible limits of error 8. Newly pasted M/S-Stips / Postal order: Meter_O E Go44 29,30 Te, Go 473) ATB: Inside Glass_ outside Glass_ = Top, Bottom__Gn4 32. 2 33 Right Side_ £0 9439 Left Side 604435 9. MS.S (REMOVED). Pix 540662 te 65 10. M.S.S (RETAINED). 1 YOGB FR bo P 11. TIF Capacity / In depended / Make / St No._< Zo Keg. tad 12. LT Bushing M.S. Nos. 13. Wired by. Name__7 747 9 200 Signature, 44. Tested by. Name. ol fig + Bemeod Signature. 15. Date of execution of work: 24— 72 - 2022 16. Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the _A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. f a 7 18. Name Designation Signature Date 1 Z Zs XEN Operation GEPCO Division Oy 2._ an: Agen. Aaa f Circle Manager (M&T) , Circle GEPCO City, 3 Arhaa basal Boreury s00 Operation GEPCO siivision CHAD 4. Consumer / Consumers Representative Endst No. 1#299-9 2 pate 20 12022 Copy Forwarded For Information 4, The SE (Operation) GEPCO CITY CIRCLE. The Manager (M&T) GEPCO, Ltd. Gujranwala. 2. 3, The XEN (Operation) Division__A/O4/ _GEPCO. 4, The S00 (Operation) _CHe. SiDivision GEPCO. CIRCLE MA! (&T) CITY CIR WALA Scanned with CamScanner k és ‘iD fe gs t 0.499 ve 8. IN HAVING LOAD 8 3 TEST CHECK! é ge weno’ 28-121 36-1932 Bol aa Same of Division / Sen Mo ful eR OL- Name & Address AG? Yo ew) Kind of Industry / Tariff / S.Load. SCO: No & Date App: No & Date . Scope of Work H LT-TOU REMOVED aly VARH Tou Meter No. 7 7 sim No Roney — 7 Make Creative adie f Capacity 5110 si10 Constant 4000 IMP__ forolm Volt / Phase 230/400 3/P, 4 Wire 230/400 3/P, 4 Wire Reading Total 0:22 LOY BICE Mot atoo 7 Fy KW Sum ath f WefZ Sf 10. Reset No 23 F3 MULTIPLICATION FACTOR AS INDICATED FOR BILLING EXISTING REMOVED 1. KWH Raiee” RX fen 2. KVARH. a 7 3. MDI Rx ibe kk, 4. KWSum L x{bo 2x lho CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) =~ —faofhAyy COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED Date 29-72-2022 Date, Zz Time__p4 6 J Time, g Lely _ KWH Total_, gy KW sum 29-22 KWH Total_/6 Zo Y KW SUM{/G-/ 2 a 220 Myo3-32 1. 51 4o Teh 42 T2 af, 2, [32 LB T2_w3-a? 73 = 73. 73. = KVARH Total_g-99 Reset No._o 3 wan Total_ 39 FC ZR Tr tay Instant KW_o 29g 11 Instant KW_g-069 2 __a py Instant KV, 72, Reset No, Instant KV. 3 Instant PF. 13. = Instant P.F. MDI Toltal_a-ey AVP MOI Total__J-Z. AVP. TM MES Z 12, Heseopag 13. 3} sp9 (OP) XEN{OP) fector s/Divn —_ Divn NO._/yy TE SERVICES (M&T) Gera GEPCO GRW cr ‘LE GEPCO ~ Scanned with CamScanner name & Address" fagoo wc No BAG 36 - (Ge22e? 7. Meter Checking Result: Accuracy, With in Permissible limits of error 8, Newly pasted M/S-Stips / Postal order: mete _ WE 60452/.22. TE, C023 ATB: Inside Glass, outside Glass, = Top. ZL nw Bottom__Go 442-6) 24 Right Side__ GoW. Left Side G42 2 9, M.S.S (REMOVED). eareS he of ae 10. M.S.S (RETAINED). WUFFR ZS 11, TIF Capacity / In depended / Make / Sr No.__ ewer 4. fed. ee, 12. LT Bushing M.S.S Nos. q 43. Wired by. Name__gg7* Luce 909 Signature, 44, Tested by. Name. 2Hisgr Abned Signature 416. Date of execution of work: Ab— Mad 2d 16. Detail of Work done / Observation 7 Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before ~ opening the A.T.B checked the meter and found ith in permissible limits of error. Then open the A.T.B removed the old meter and_ installed new AMR meter. Complete the job check the accuracy of new meter on heater Joad and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as 18. Name Designation Signature Date 1, Mian Lot fiae. Ae med XEN Operation SERCO Division£Y 4 “yy 3 . 9 0 Circle Manager (M&T) 7 Circle GEPCO City. 3. Alar Lsoo/ be: @WI9_SDO Operation GEPCO mentioned abo SiDivision. 4 Consumer / Consumers Representative Endst No. 17393 -9b pae _ 27 j__/2— 02 Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Ltd, Gujranwala. 3. The XEN (Operation) Division, Alnfge— GEPCO. 4 . The SDO (Operation) _@_ 7 & —SIDivision GEPCO. Scanned with CamScanner Name 4 fe he, my, Po OMPANY LIMITED GUJRANWALA ELECTRIC POWER Ci ‘TEST CHECK PROFOR.:12 iN -RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW 4 Nameot pissin /soon WOU __C/@___nicno.B8 . 2 Names address A Yag poub 3. Windorindutry /Ttatt/stod___— Bo few 2 At le ur, Ms SCO: No Date 4. App-No Date 5 sopeotwork =_ReQlare hu whAve? omehes - LE-TOU METER EXISTING / INSTALL, LU-TOU REMOVED xa Wa KVARH 1, Tou Meter No. e2FRy 2 simio — @BNRYEQ AD. = / 2. Make tive entire 4. Capacty sii0 110 5. Constant 4000 IMP (oar F97) f- 6 votrPrase — souoospewne __/. 230400 90, 4 We 7. Reading Total oFs 44 24 G6 W22p 8. MoI abo 8. KW Sum Soe [ “dug de 10. Reset No ef I os SMEATON ACTORS NDCATED ORL 1. KWH oo hee pecan 2. KVARH 3. MOI i ae 4. KW Sum x fe cr ee (installed) CT Ratlo (Existing) CT Ratio (Removed) = Gel TA mfp) COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED vate2$-/2 +25 Date24-/2~ 2-2. 1 Time_752 KWH Total_q“3 Kw Sum_¢“F# KWHTolal_gUDZ vw sum_ 49 9 "1 a4e TA, o'G? acy 10g RB 928 29 -Fo RAY T2__4q.2> 13 = 13. ze KVARH Total_o-49 ResetNo_of igen RE L239 Reset No_ 9 tt Instant KW_erZo m 384 Instant KWo = 294° 4 rR Instant KV. BIG Instant KV. 3 Instant PF. a = Instant PF. MOI Total_e7 ee AVP. MOI Total__o-4> AVPE. 5 1oSy a ee age Td Bi ee Z XEN(0P) SPECTOR cmeue ma SDO,OP) siivn Divn NO, TEC! SERVICES (M&T) CITY CIRC) 44- GEPCO ITP SRCLE GEPCO Scanned with CamScanner ‘name & Address VE Sfar ont» Lar, le weno. 2P—42/26—Mho 2 a 7. Meter Checking Result: Accuracy. in Permissible limits of error 8, Newly pasted MS-Stips / Postal order: meter_WE Ger 560, 6/ Te, 62 ED ATB: Inside Glass, outside Glass. Top. a Bottom__ G40 KK 3. n KY Right Side. bon LES Left Side WE Sr 4b Qo 9. MSS (REMOVED), wef, 10. M.S.S (RETAINED). BS 294/31 36 11. T/F Capacity In depended / Make /StNo__ Gen ltywee 226 12. LT Bushing M.S.S Nos. a 43, Wired by. Name_272* 7 Ucveaore Signature, f 44, Tested by. Name, Babe's + Dood Signature. 15. Date of execution of work: 24-2. - 2022 46. Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and_ found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee mentioned above. of we ye 18. Name Designation Signature Date 1 plac Zot 192. Mlazaeed KEN Operation GEPCO Division AZO Ze 2 a (od. y Circle Manager (M&T) Circle GEPCO City. 3 Brhax La stl Bajrua, s00 operaiongePCo ‘SIDivision_ oY ‘6 4 Consumer / Consumers Representative Endst No. LESIF 4 en Date 28 1 _(2— rw Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Ltd. Gujranwala. 3, The XEN (Operation) Division _aJ0/7'_ GEPCO. 4 |. The SDO (Operation) Sa =~ SiDivision GEPCO. Scanned with CamScanner CCTRIC POWER COMPANY LMI cD se CONNECTION HAVING LOAD UPTO 499 KW 1. Name of Division /.Divn apco LIA 36-22-22 — fa 2 thmeaadiess Ave Star ante Paix Cfos7-%ayyeb—— 3. Kind of Industry / Tariff / toad Bp f spmaew 4. AppeNo& Date SCO: No & Date 5. scopeotwox RePlac©e Zou wit Ame meer. LT-TOU METER BXHS#HNG /INSTALI LY-TOU REMOVED TWH KVARU KYARI 1. ToumeterNo. @/323% _ — ante} — 2, simNo oO SUED FUAGER ‘TEST. CHECK PROFORS 3. Make Creative L'By 4. Capacity 5/10 5110 5. Constant 4000 IMP. Lovee nf? 6. Volt/ Phase 230/400 3/P, 4 Wire 230/400 3/P, 4 Wire 7. Reading Total 08 0-Po F233 Cour 8. MDI oreo 04D 9. KW Sum L274 Z Ga Rly S 40, Reset No 23 bE. ‘MULTIPLICATION FACTOR AS INDICATED FOR BILLING ues = _ 2 1. KWH —_ 2. KVARH Rx/bz. Xb 3. MOI a Bilge 4, KWSum Lx Lx Mbn CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) —_8e/sQne COMPLETE READING CYCLE OF DIGITAL METER (NEWLY INSTALLED / BXISTING REMOVED Date2Qo-/2- 22 Date. 24/2. +22 Time__ 46 32 Time___ 6 "ae KWH Total_ fe af KW Sum, f2f KWH Total $25 3 KW SUM. a2rZy "1 11, oe LED. TLL 2 [6d 72, 2 72, Say 72, yo-2y 13 =. T3. — 73, ‘3. KVARH Total_g- 9a ResetNo__@ 2 KVARH Tolal_ eu Reset No, Ga. m1 - aoe Instant KW_eag? ™ Instant KW, 12 i290 Instant KV. 62.92 Instant KV. 3 =. Instent PF___7 2 Instant PF. MDITotal__eeae AVP 7 ‘MOI Total__e* 7 St AVP. 1 1 ae} 12, 72, 245 13, 13, = A s0 (oP) XEN (OP) ‘SPECTOR CIRCLE M R (MST) simon Diva NOY TECIARO\L SERVICES (M&T) CITY CIR BE GEPCO ar (CLEGERCO 2 = Scanned with CamScanner 6.Names Address 27, /Veulab. weno _27-12KH- D3F5/0/. 7. Meter Checking Result: Accuracy. With in Permissible limits of error 8. Newly pasted-M/S-Slips / Postal order: Meter WE b63G5955_ SO Te, CRLESZ. ATB: Inside Glass_ outside Glass_ Top. potom__ ASY559_, SP Right Side__@3ASGO_, 67 Left Side. CHYS OD 6M (REMOVED)_qZ@ZA 10. MSS (RETANED)_ BE G2LA,0 » BS” 411. TIF Capatity / In depended / Make /SrNo__504@¢2 Aol 7 12, LT Bushing M.S.S Nos. 13, Wired by. Name_ Bobvet Aue Signature. 7 S AV, 14, Tested by. Name, Zul Done Signature KW 416. Date of execution of work 28-12-22. 16. Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that is dully signed by the technical committee as close the A.T.B welded & pasted postal order whic mentioned above. 18 Name Designation Signature Date 1 Mel Lrhee aed sex Operation GEPCO . : Division ABZ 2_ fl. A [fe 7 §.chcte Manager (aT) Circle GEPCO City 3800 peration SERED siDivision, 4 Consumer / Consumers Representative Endst No. 1FSH- Date ! 12022 Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. ‘The Manager (M&T) GEPCO, Ltd. Gujranwala. 2. 3. The XEN (Operation) Division__/¥. GEPCO. 4, The SDO (Operation) x SiDivision GEPCO. Scanned with CamScanner 1. Nameotbiviton spin VA 2, Name & Address \Wi ELECT! WER. W CHE ¢ ION HAVING Chcle AICNo.OZALZB- OSPF 5/01 L2_ Alawar. B2. G0 lu. 3. Kind of industry / Tariff / .Load, 4. Name of Feeder 5. Scope of Work VY 1. TouMeterN, — _Q43/@2- LT-TOU METER EXISTING /INSTALL, KVARH Kw ‘App: No & Date. Lelucemint of Cf zee with Aue pele. LT-TOV REMOVED KVARH 2. SimNo QUT HY T- GOL. / 3. Make Creative BE f 4. Capacity 5/10 5/10. 5. Constant 4000 IMP (Q0¢0 6. Volt/ Phase 230/400 3/P, 4 Wire 30/400 3/, 4 Wire £ 7. Reading Total OO o:84 B30, (596 8. MDI OM oF3 / 9. KW sum 0:92 # OFS 10. Reset No. C02. 2) Z py. EXISTING VE 1. KWH 20 2. KVARH X 20 T x20 3. MB DD ‘420 4. KWSum RxX2O L KA 20 CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED se Ge bp Date_2B-/2-22. fee Time, 15239 KWH Total es 2d] Kwsum__0° KWH Total pees Kw sum_20-7S5 Tt TA. OOD TH. 1 2D 2Y 12 S el 12. 0-99 72 Le 12 29-62 3 13, = 73, T3, — KVARH Total_O TPL Reset No 203 _ KVARH Total BIE Reset No .3O Ties, 2:00 Instant KW_O- 3F TA. Instant KW_0:-39 ull 2 OL6 Instant KV__— T2, Instant KV__— te. —_— Instant P,F__O« 73, —— Instant P.F_OD-9P MDI Total__@ AVP. 2, MDI Total_O°- 3S AVPF__— 11, oO MH 2y 2 0 12 0:82 13, 13. — DBYOR) XEN{OP) ECTOR CIRCLE MANAGER (M&T) siivn Diva NO. TECI SERVICES (M&T) CITY CIRCLE GEPCO GePco GEPCO GRW CITNBIRCLE GEPCO Scanned with CamScanner 6. Name & Address_/27 + Vana! NONo_2P-1212.6- 0375/02 « 7. Meter Checking Result: Accuracy. With in Permissible limits of error 8, Newly pasted-MiS-Stips / Postal order: weer WE 684523, bY +6 OSV SOS. ATB: Inside Glass outside Glass, £ Top, Bottom, 634566 _, bF Right Side. CSYSEI Lett side___ 4 9&SB9 9.Ms.s(REMOvED)___ #2756576 70 GO 10. M.S.S (RETAINED). WbG2I55,, 66 . 11. TIF Capacity / In depended / Make / St No.__@50 4447 VA 12. LT Bushing M.S.S Nos,, |. Wired by. Name. keoltat Bie Signature, Tested by. Name. Zhe Bived Signature, 15. Date of execution of work: = LIP A - & 1 z Za WD

You might also like