GENERAL NOTES:

SCHEDULE OF WOODEN DOORS


LEGEND:

Unit-1 Unit-2 Unit-3 Unit-4


Type Type Type Type
B C C B

Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6


Type Type Type Type Type Type
D01 D01 B C C C C B

REFERENCE DRAWINGS / DOCUMENTS:


IFC DRAWINGS:
REV. DWG./DOC. NO. DESCRIPTION

C-A-001 SITE SETTING OUT PLAN(041)

C-A-101 GROUND & FIRST FLOOR PLAN

A- 701 SCHEDULE OF FINISHES

SHOP DRAWINGS:
REV. DWG./DOC. NO. DESCRIPTION

SCD-PIV-C-ARC-001 GROUND FLOOR PLAN

DOOR TYPE - D04 (NFR) DOOR TYPE - D05 (NFR) DOOR TYPE - D06 (NFR)
DOOR TYPE - D01 (PANEL) DOOR TYPE - D02 (NFR) MAIDS ROOM
MAIN ENTRANCE LAUNDRY, POWDER RM & BATH RM TEL./ELEC. BED ROOM-2, 3 & MASTER BED RM
PLAN, ELEVATION . PLAN, ELEVATION . PLAN, ELEVATION .
PLAN, ELEVATION . PLAN, ELEVATION .

RFI REFERENCES:

SCHEDULE OF WOODEN DOORS SCHEDULE OF LOUVERED DOORS RFI NO.

AS BUILT
DOOR REFERENCE
SPECIFICATIONS
0 22/12/19 ISSUED FOR APPROVAL HATEM LOAY
D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 REV. DATE DESCRIPTION DRAWN CHKD.

REVISIONS:
SOLID MERANTI WITH SPRAY PAINT

OWNER / CLIENT

SOLID BEECH WOOD 00 26/11/17


FRAME

SOLID MERANTI WITH DARK OAK VENEERED

CONSULTANT

SPRAY PAINT COATING MERANTI MOULDING


ARCHITRAVE

SOLID MERANTI WITH DARK OAK VENEERED

SOLID BEECH WOOD

CONTRACTOR
SOLID-NON-COMBUSTIBLE CONSTRUCTION
DOOR CORE

TUBULAR CHIPBOARD
SOLID CONSTRUCTION
PROJECT NAME AND LOCATION
70% SEMI SOLID WHITE WOOD

4 mm PLY WITH DARK OAK VENEERED Serena Casa Dora


FACING

Phase-2
4mm. PLY WOOD PLOT NO.: 6653099
AT WADI AL SAFA 7 - DUBAI
OUTSIDE

PRESSED LAMINATED LAYER ON PLYWOOD UNITED ARAB EMIRATES

DISCIPLINE :-
DARK OAK WOOD VENEERED FINISH ARCHITECTURAL AS BUILT DRAWING
FINISH

SPRAY PAINT COATING


LV02 LV06
DRWG. TITLE :-

DARK OAK VENEER FINISH


SCHEDULE OF DOORS
TYPE - C
(MIRROR)

Date Drawn Scale Chkd. Appd.

21/12/2019 HATEM AS SHOWN LOAY TAREK


Discipline: Dwg. no: Rev. no.

A SP2-AR-ABD-C-009 00