SEE BASE PLATE DETAILS SEE BASE PLATE DETAILS


A A

B B

C101 COLUMN DETAIL


SCALE:1/25
C102 COLUMN DETAIL
SCALE:1/25

C C

D D

+0.000 = +4.500 (S.L.) GROUND WATER LEVEL (APPROX.) = +3.000 (S.L.)

E MATERIALS: E
CONCRETE STRENGTH CLASS : C40
LEAN CONCRETE STRENGTH CLASS : C16
REBAR STRENGTH CLASS : S420
SECTION A-A SECTION B-B NONSHRINK GROUT : Sika Grout R 216 or Equivalent
SCALE:1/25 SCALE:1/25 CONCRETE COVERS:
FOUNDATION ( UNDER G.W.L. ) : 75 mm.
FOUNDATION & WALL : 50 mm.
FOUNDATION FORMWORK PLAN COLUMN & BEAM : 35 mm.
F F
SCALE:1/50 SLAB : 25 mm.
GROUND SLAB : 75 mm.
NOTES:
1-) ALL DIMENSIONS,ELEVATIONS & COORDINATES SHALL BE CHECKED
BEFORE THE APPLICATIONS AND ERECTION.
SEE STEEL STRUCTURES DETAILS 2-) SEE "10-C-F-GN.001" NAMED "GENERAL NOTES" BEFORE BEGINNING THE APPLICATIONS AND ERECTION.
FOR ANCHOR BOLTS
3-) CONTRACTOR TAKE PRECAUTIONS AGAINST SOIL SUBSIDENCE DURING EARTHWORK.
4-) ALL DIMENSIONS ARE IN MILIMETERS.
G G
5-) ALL COORDINATES AND ELEVATIONS ARE IN METERS.
SECTION X-X
SCALE:1/50 7-) ALL BARS ARE MEASURED ON EXTERIOR LENGTHS.
2*Q188/188
C30 CONCRETE

+0.000

H
SECTION 2-2 H
SCALE:1/50
(EXPANSION FILLING)

XPS FOAM BOARD

SECTION A-A
COLUMN & FOUNDATION

SCALE:1/50
CONCRETE WALL &

J J

KEY PLAN

PROJECT STATE COMPANY FOR


NAME:
BASRAH STEEL PLANT PROJECT
TYPICAL SECTION FOR FLOOR SLAB SEE BASE PLATE DETAILS IRON AND STEEL (SCIS)
K SCALE:1/10 K
PURCHASE
ORDER NO:
UB-2018 / 13 UB HOLDING
SECTION 1-1 Support Baseplate
SCALE:1/50
Second Grouting Civil Engineer
DESIGN
COMPANY:
Structural Eng. (M.Sc.)

L
L=300 (Fillet Welding for Top and Bottom Plate ) DRAWING: L
SECTION B-B AIR SEPERATION PLANT
SCALE:1/50
COLDBOX SYSTEM - FORMWORK PLAN, SECTIONS & EMBEDDED STEEL DETAILS
Reinforced Concrete
3D VIEW 6 27.09.2019 FOR CONSTRUCTION E.E. S.G.
BASE PLATE DETAIL 5 20.09.2019 FOR CONSTRUCTION E.E. S.G. TYP NAME SCALE: 1/50 DATE 06.05.2019 SHEET SIZE: A1
SCALE:1/25 4 05.07.2019 FOR CONSTRUCTION E.E. S.G. DESIGN ECMEL ERKAN DWG NO: REV:
3 04.07.2019 FOR CONSTRUCTION E.E. S.G. DRAWN

NOTE : ALL ANCHOR BOLTS AND PLATES DETAILS WILL BE GIVEN SASPG COMPANY'S 2 21.05.2019 FOR CONSTRUCTION E.E. S.G. CHECKED 01-C-F-28.MS.CF.101 6
1 20.05.2019 FOR CONSTRUCTION E.E. S.G. APPROVAL
M M
EQUIPMENT DRAWINGS. 0 06.05.2019 FOR CONSTRUCTION E.E. S.G. THIS DRAWING IS THE PROPERTY OF TEKNIK YAPI PROJE AND MUST NOT BE REPRODUCED OR MADE AVAILABLE TO ANY THIRD PARTIES WITHOUT
REV. DATE DESCRIPTION BY CHKD. TEKNIK YAPI PROJE'S WRITTEN CONSENT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16