You are on page 1of 3

1 2 3 4 5 6 7 8

A A

U/S
B B
D/S

C C
SECTIONAL ELEVATION

NOTES:-
TO MYSORE

D D

HALF TOP
E U/S D/S E

HALF BOTTOM
TO MADIKERI

F F

LEGEND:

PLAN

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V
Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500, TYPICAL GENERAL ARRANGEMENT
Member (Tech) Fax: +91-80-41320989 Approved By: SK TITLE: DRAWING OF BOX CULVERT FOR NEW
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. CONSTRUCTION
NHAI HQ (Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-TYP-GA-003
R2 1 OF 3
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A A

B B

C C

'2'

D D
DETAIL OF CONSTRUCTION JOINT

E SECTION A-A E

F F

G
DETAIL OF CURTAIN WALL TYPE-I DETAIL OF CURTAIN WALL TYPE-II DETAIL-'2' G

(UP STREAM SIDE)


DETAIL-'1'
(DOWN STREAM SIDE)

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V
Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500, TYPICAL GENERAL ARRANGEMENT
Fax: +91-80-41320989 Approved By: SK TITLE: DRAWING OF BOX CULVERT FOR NEW
Member (Tech)
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. CONSTRUCTION
NHAI HQ (Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-TYP-GA-003
R2 2 OF 3
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

F F

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V
Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500, TYPICAL GENERAL ARRANGEMENT
Fax: +91-80-41320989 Approved By: SK TITLE: DRAWING OF BOX CULVERT FOR NEW
Member (Tech)
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. CONSTRUCTION
NHAI HQ (Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-TYP-GA-003
R2 3 OF 3
1 2 3 4 5 6 7 8
Size: A2

You might also like