You are on page 1of 2

1 2 3 4 5 6 7 8

TO MADIKERI TO MYSORE

127+400

127+500

127+600
A A

PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW

PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

PROW
PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

PROPOSED BOX
CULVERT AT DESIGN
B
CH: 127+560 B
KEY PLAN
LEGEND:

U/S D/S

'2'
C C
SECTIONAL ELEVATION

NOTES:-
D D
TO MYSORE

HALF TOP
E
D/S E
D/S
TO MADIKERI

HALF BOTTOM
U/S
A

F F

PLAN

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500, GENERAL ARRANGEMENT DRAWING OF
Fax: +91-80-41320989 Approved By: SK TITLE:
Member (Tech) BOX CULVERT NEW CONSTRUCTION AT
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. DESIGN CH: 127+560
NHAI HQ (Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-CH-127+560-GA-001 R2 01 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A A

B B

DETAIL OF CURTAIN WALL TYPE-I DETAIL OF CURTAIN WALL TYPE-II


(DOWN STREAM SIDE) (UP STREAM SIDE)

C C

'2'

D D

DETAIL-'2'
DETAIL-'1'

E E

SECTION A-A

DETAIL OF CONSTRUCTION JOINT

F F

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V
Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500, GENERAL ARRANGEMENT DRAWING OF
Fax: +91-80-41320989 Approved By: SK TITLE: BOX CULVERT NEW CONSTRUCTION AT
Member (Tech)
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd. DESIGN CH: 127+560
NHAI HQ (Ministry of Road Transport & Highways) and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-CH-127+560-GA-001
R2 02 OF 02
1 2 3 4 5 6 7 8
Size: A2

You might also like