You are on page 1of 1

O

R B TEXTILE ROAD
TO DHAKA PEDDY FIELD
D C B A A1 S/O
N/O

N
CULVERT S/E
26 N/E

25

TO CTG
EP 24 LEGEND:
MKC PLOT

1 AC-ELECTRIC ARC FURNACE


23 1.1 TRANSFORMER-, HYDRAULIC-, HV-, LV-ROOM
2 LADLE FURNACE
SHOP 2.1 TRANSFORMER-, HYDRAULIC-, HV-, LV-ROOM
3 DEDUSTING PLANT
3.1 DEDUSTING PLANT ELECTRIC ROOM
22 4 FLUX BUNKER SYSTEM
4.1 CDRI DEDUSTING SYSTEM
5 FERRO ALLOY BUNKER SYSTEM
6 SCRAP YARD
21 6.1 SCRAP LOADING POSITION
7 FERRO ALLOY STORAGE
8 ALLOY DUMP HOPPER
9 STEELMAKING PLANT MAIN SUBSTATION
10 SLIDE GATE MAINTENANCE & H-LADLE HEATER
PEDDY FIELD 20 10.1 SLIDE GATE INSPECTION STAND
11 EAF CONTROL-, PLC- ROOM
12 LF CONTROL-, PLC-ROOM & LABORATORY
13 LADLE MAINTENANCE AREA
pond
19 13.1 VERTICAL LADLE HEATER
13.2 LADLE & TUNDISH TRANSFER CAR
14 LADLE WRECKING STAND
15 FULL STEEL LADLE DEPOSIT STAND
16 STEEL LADLE TRANSFER CAR
18 17 SCRAP BUCKET
17.1 SCRAP BUCKET TRANSFER
18. EAF SHELL
18.1 EAF TRANSFER CAR
17 19 EAF DEPOSIT STAND
20 EAF RELINING AREA
21 CCM SLAG DUMP PIT

DAS PAR
Bldg. 22 EAF SLAG INTERMEDIATE STORAGE
30 BILLET CASTER
16 31 TUNDISH MAINTENANCE AREA

A ROAD
Bldg. 31.1 TUNDISH DRYING
31.2 TUNDISH TILTING / WRECKING
15 32 CCM CONTROL-, PLC-ROOM
33 SCALE PIT
35 HOT CHARGING ROLLER TABLE
40 ROLLING MILL
50 SWITCH YARD GIS + STEP DOWN TRAFO + MV SWITCHGEAR
51 WATER TREATMENT PLANT

SULTANA MO
14

TIN SHED
PEDDY FIELD

NDIR ROAD
13
12

pond
11

CULVERT 10
2 std
bldg
pond

DTW
9

8 WATER TREATMENT PLANT - POSITION TO BE DEFINIDED

pond
5

20 Palace Ct, Flat 309 - Notting Hill,


London W2 4HU, United Kingdom
4

Phone: +44 771 775 9425


SEMI LEGEND
PUCCA
FOUNDATIONS INCLUDED
MOSQUE

3 FLOOR SLAB thk. 250 mm - concrete

FLOOR SLAB thk. 300 mm - concrete

EXISTING ROAD
2 FLOOR SLAB thk. 400 mm - gravel

GATE FUTURE SHED

TENDER
DOCUMENT

P.D. A0 1:500

O.U. - 18.01.16
20 Palace Ct, Flat 309 - Notting Hill,
LOCATION OF EXISTING 11KV SW. BD. London W2 4HU, United Kingdom GPH Ispat Ltd.
Phone: +44 771 775 9425
YD. Kumira - Sitakunda - Chittagong - BANGLADESH
ION
INAT MINIMILL PROJECT 800.000 TPY
TERM
33KV TURN-KEY PROPOSAL
POWER PLANT 33 KV ELECTRIC
SUB STATION Store BATTERY LIMITS
BEND
AR
BEND RE-B
K
RE-B
AR STAC
BEND

cooling tower
K 8
AR STAC
RE-B
STAC
6
K 7
TRUC
K3 15-293-OFF-102 0