You are on page 1of 1

1.

pipe should be added and installed on the top of riser of the highest fixture level to absorb air
pressure.
a. 0.3 – 0.9m b. 0.4 – 1m c. 1-1.5m d. 0.6 – 1.2m

2. What is the minimum horizontal distance required between vent terminal and window opening
of a building?
a. 1.5m b. 3m c. 1m d. 0.5m

3. What should be the minimum clearance that should be made with respect to the floor line to
allow convenient opening or closing of a clean out?
a. 100 mm b. 200 mm c. 50 mm d. 300 mm

You might also like