Weeks

Feb 19- Feb 26- Mar 5- Mar 12- Mar 19- Mar 26-
Sl.No. Stages Feb 25 Mar 4 Mar 11 Mar 18 Mar 25 Apr 1
1 Products listing and Market survey
2 Possible Customer listing

3 Current Market Cost Study (Average cost)


Machine, equipments, lab instruments etc.
4 List & Specification

5 Product costing - 3 products (Tentative)

Technical Project detail report wih


machine list, tentative cost, required
manpower, power enhancement etc. for
6 CA
Machine Manufacturer identification and
7 Machine Enquiry floating
Machine Technicality discussions with
8 vendors
9 Machine Quotations for bank
Machine Rates Negotiations and Quotation
10 finalisation
Machine Final Purchase order making with
11 Terms & conditions
12 Making of Process Flow Diagram

Machine layout demarking in details with


product handling, storing, power supply
13 points, and other shop floor requirements
Machine foundation/ accessaries listing
14 and procurement
15 Laboratory detail layout and setup
16 Prototype sample Making for display
Advertising/ Brouchure design and display
17 and distribution.
18 Machine installation
19 Manpower recruitment

20 Mould designing and getting prepared


Assesing requirement for ISO , Approvals,
21 Licence etc.
22 Receiving Market Enquiry
23 Market Order Booking
Production startup, machine
24 commissioning, product trials etc
Formats making for Operations, material
25 movements, stores, etc.
Weeks
Apr 2- Apr 9- Apr 16- Apr 23- Apr 30- May 7- May 14- May 21- May 28-
Apr 8 Apr 15 Apr 22 Apr 29 May 6 May 13 May 20 May 27 June 3