Drawing study and standards of harness assembling.

Understand the procedure of assy and test board making


OTS making. Develop process flow for ots preparation.
Verify Lot Size of Bunch as mentioned on Job Cards.
Special Project for Army APQP meetings and plans
INSTALLATION OF 24 VOLT AUXILARY SYSTEM
IN IMV ARMY
Visit to IMC for fitment of new harness in IMV ARMY
SWOT Analysis of ED
VA/ VE IDEA FOR THE DESIGN OF 368-A 3rd VA VE Request

Localization of Electrical Circuit


Testing Machine OMI-2

1. To develop work sheet for RCCA's and VPR's month wise reporting of local
parts vendors.
2. Catagorize the cables according to wire type and guage and develop work
sheet for RCCA's and VPR's month wise reporting of cable vendors.
3. Follow up of OTS inspection of vendorized and re-sourced part; working and
update the worksheet.
4. To Develop the Process Flow for Process Capability of cutting and
crimping machine.
5. To Develop the Work Instruction Sheet for Process Capability using Minitab.
6. Analysis of using Minitab for process capability.

1. Draw the Layout of Store-2.


2. List of Items in Store-2.
3. Maintenane and Management of Old Office Area.
4. Lead the 4 different teams for 3 days in Stock Count Activity.

5. Monitoring the activity of daily Supply Issuance.


6. Time Study for Issuance of Items.
7. Arrange the List of Gli Items according to Shopping Lists and
Locations.

Preparation of Audit and covering internal audit NCs

Revised SOP of ED and PD


Update files of local vendors.
Visit to IMC for meeting on development plan of 368A.
Crimping Specs control and revert to specs of corolla to FAS standard.
OH&S training and define objectives of OH&S of ED depart and hazard log and risk
assessments

OTS crimping tooling required and spec cards verification on pull test bases.
Monitor the OTS preparation of Suzuki Euro 2.

Product Development
Find out the consumption, per assembly, vehicle and annual usage of Suzuki Euro-II
parts for localization and send RFQs to different vendors.
Find out the consumption, per assembly, vehicle and annual usage of corolla parts
for localization and send RFQs to different vendors.
Visit A-1 techniques and Global engineering for audit.
Update plan of localization.
Update plan of vendor visits.
Visit local market for cost of materials and vendor price revision