1. To develop work sheet for RCCA's and VPR's month wise reporting of local
parts vendors.
2. Catagorize the cables according to wire type and guage and develop work
sheet for RCCA's and VPR's month wise reporting of cable vendors.
3. Follow up of OTS inspection of vendorized and re-sourced part; working and
update the worksheet.
4. To Develop the Process Flow for Process Capability of cutting and
crimping machine.
5. To Develop the Work Instruction Sheet for Process Capability using Minitab.
6. Analysis of using Minitab for process capability.
OTS crimping tooling required and spec cards verification on pull test bases.
Monitor the OTS preparation of Suzuki Euro 2.
Product Development
Find out the consumption, per assembly, vehicle and annual usage of Suzuki Euro-II
parts for localization and send RFQs to different vendors.
Find out the consumption, per assembly, vehicle and annual usage of corolla parts
for localization and send RFQs to different vendors.
Visit A-1 techniques and Global engineering for audit.
Update plan of localization.
Update plan of vendor visits.
Visit local market for cost of materials and vendor price revision