Professional Documents
Culture Documents
WI-MB-02 (Autoclave)
WI-MB-02 (Autoclave)
Page 1 of 7
Working Instruction
Autoclave
(ALP CO) (model: CL-32L series)
Analytical Chemist
Page 2 of 7
Working Instruction
Page
Contents
Number
2.0 Definition…………………………………………………………………….. 3
3.0 Precaution…………………………………………………………………… 3
4.0 Procedure…………………………………………………………………… 3
5.0 Maintenance……………………………………………………………….… 3
6.0 Reference…………………………………………………………………….. 4
8.0 Appendices…………………………………………………………………… 4
Page 3 of 7
Working Instruction
4. Procedure
4.1 operation
Check if power cable is connected and press power button.
Close drain valve by moving lever to anticlockwise.
Open the lid and Pour water ( about 1.5 l or more of water)
Load object in stainless wire basket then set in chamber slowly.
close lid and slide the lid lock
set operation mode , value of temperature and time
Press starts key to begin operation.
Press stop key after operation complete an release the lid lock lever.
Unload object safely from chamber (below 800c in chamber).
Turn off power switch by press power button.
4.2 Calibration
Sterilizing efficiency measurement can be tested via two methods:
4.2.1 Biochemical method:
By getting some bits of paper or cotton saturated of thermophilic microbes as "Bacillus
stearothermophilus in a paper envelopes and putting them in the autoclave.
After sterilizing we put these bits of paper on surface of suitable media and incubate it at 55 oC. If a
growth took place ………………….sterilizing failure.
Note, it is well known that theses microbes dead at 121oC for 12 minutes.
4.2.2 Chemical method:
By putting a sublimated substance as sulfur which sublimate at 120 oC in capillary tubes and hanged
inside the autoclave within sterilizing, if the sulfur get sublimated …..This indicates the Sterilizing
efficiency.
5. Maintenance
5.1 Daily:
Page 4 of 7
Working Instruction
6. References
Biological Safety Principles and Practices edited by Diane Fleming & Debra Hunt.
Laboratory Safety Manual
Page 5 of 7
Working Instruction
9. Document History
Section Amendment
No. Date Authorization
Para. Page Issue No Elimination / Correction / Addition
Page 6 of 7
Working Instruction
Appendix (1)
Autoclave Preventive Maintenance Check
Date Initials Action & Usage Comment
Daily
Page 7 of 7
Working Instruction
Routine Maintenance: