PRODUCTIVITY

Per-Hour 8 Hr/Day 10 Hr/Day


Activity
(1) (1) (1)

CONCERETE (Including all associated works) (Cum)


Foundation / PCC 0.50 4.00 5.00
Pilecap 0.38 3.00 3.75
Retaining wall, Water Tank,Core Wall 0.36 2.88 3.60
Columns 0.29 2.32 2.90
Slabs 0.44 3.52 4.40
Beam 0.33 2.64 3.30
Staircase 0.25 2.00 2.50

FORMWORK (Shuttering & All associated works) (Sqm) - Up to 3.5 Meter


Foundation 0.50 4.00 5.00
Pilecap 0.38 3.00 3.75
Retaining wall, Water Tank,Core Wall 0.44 3.52 4.40
Columns 0.44 3.52 4.40
Slabs 0.45 3.60 4.50
Beam 0.35 2.80 3.50
Staircase 0.25 2.00 2.50

FORMWORK (De Shuttering & All associated works) (Sqm) - Up to 3.5 Meter
Foundation 1.50 12.00 15.00
Pilecap 1.13 9.00 11.25
Retaining wall, Water Tank,Core Wall 1.32 10.56 13.20
Columns 1.32 10.56 13.20
Slabs 1.72 13.76 17.20
Beam 1.16 9.28 11.60
Staircase 1.00 8.00 10.00

STEEL REINFORCEMENT (Including all associated works) (Kgs)


Foundation 23.75 190.00 237.50
Pilecap 23.75 190.00 237.50
Retaining wall, Water Tank,Core Wall 15.63 125.00 156.25
Columns 15.63 125.00 156.25
Slabs 10.94 87.50 109.38
Beam 6.25 50.00 62.50
Staircase 6.25 50.00 62.50

MASONRY (Including all associated works) (Sqm)


200mm thick Solid Block 0.41 3.25 4.06

PLASTERING (Including all associated works) (Sqm)


15mm thick internal Plaster 0.44 3.50 4.38
20mm thick internal Plaster 0.38 3.00 3.75
PRODUCTIVITY
Activity Per-Hour 8 Hr/Day 11 Hr/Day
CONCERETE (Including all associated works)
Foundation / PCC 1.00 8.00 11.00
Pilecap 0.75 6.00 8.25
Retaining wall, Water Tank,Core Wall 0.72 5.76 7.92
Columns 0.58 4.64 6.38
Slabs 0.88 7.04 9.68
Beam 0.66 5.28 7.26
Staircase 0.50 4.00 5.50

FORMWORK (Shuttering & Deshuttering)


Foundation 0.75 6.00 8.25
Pilecap 0.56 4.50 6.19
Retaining wall, Water Tank,Core Wall 0.66 5.28 7.26
Columns 0.66 5.28 7.26
Slabs 0.86 6.88 9.46
Beam 0.58 4.64 6.38
Staircase 0.50 4.00 5.50

STEEL REINFORCEMENT (Including all associated works)


Foundation 60.00 480.00 660.00
Pilecap 60.00 480.00 660.00
Retaining wall, Water Tank,Core Wall 43.75 350.00 481.25
Columns 43.75 350.00 481.25
Slabs 28.13 225.00 309.38
Beam 15.63 125.00 171.88
Staircase 12.50 100.00 137.50
Team Composition
Team Code Ass.Project Manager Project / Site Engineer Foreman
CH M C
T01 Boopathi Gopal Venkat Shafi
T02 Sundar Poolchand
T03 Vinod Arfan
T04 veerpal
T05 idris
T06 abbas
T07 Ravi
T08 Suresh
T09 Muthu
T10 Rasamay Biswas
T11 Avtar
Total 0 0 0
Team Composition
Team Size Remarks
SF SC H Others
0
0
0
0
0
0
0
Night Shift
0
0
0

0 0 0 0 0
Per Hr / Per
Activity
Labor
CONCERETE (Including all associated works) In Cum
Foundation / PCC 0.50
Pilecap 0.38
Retaining wall, Water Tank,Core Wall 0.36
Columns 0.29
Slabs 0.44
Beam 0.33
Staircase 0.25

FORMWORK (Shuttering, Deshuttering & all associated works ) In Sqm


Foundation 0.38
Pilecap 0.28
Retaining wall, Water Tank,Core Wall 0.33
Columns 0.33
Slabs 0.43
Beam 0.29
Staircase 0.25

STEEL REINFORCEMENT (Including all associated works) In Kgs


Foundation 30.00
Pilecap 30.00
Retaining wall, Water Tank,Core Wall 21.88
Columns 21.88
Slabs 14.06
Beam 7.81
Staircase 6.25

MASONRY (Including all associated works) In Sqm.


200mm thick Solid Block 0.41

PLASTERING (Including all associated works) In Sqm


15mm thick internal Plaster 0.44
20mm thick internal Plaster 0.38
FORMWORK (Shuttering & All associated works) (Sqm)

Shutering with associated


Foundation 0.38 0.50
Pilecap 0.28 0.38
Retaining wall, Water Tank,Core Wall 0.33 0.44
Columns 0.33 0.44
Slabs 0.43 0.57
Beam 0.29 0.39
Staircase 0.25 0.33

100 0.43 174.418604651163


232.5581 0.573333333333333
39032
De shuttering with associated
1.50
1.13
1.32
1.32
1.72
1.16
1.00

348.8372
58.1395348837209 279.0698
1.72