Professional Documents
Culture Documents
30
29
28
27
26
25
24
23
Datum: 22.2
30.870
31.209
30.926
30.644
30.361
30.042
29.687
29.673
29.735
29.797
29.834
27.532
22.584
OGL
31.054
28.525
27.425
28.925
28.925
29.000
28.925
28.925
27.425
28.525
29.811
PQC
-10.500
10.500
-8.750
-7.794
-7.000
-5.250
-4.000
-3.500
-3.000
-1.750
0.000
1.750
3.000
3.500
4.000
5.250
5.930
7.000
8.750
Offset
Ch.0 m
31
30
29
28
27
Datum: 26.2 0 03-10-2022 ISSUED FOR APPROVAL
PROC. ENG.
REV. DATE DESCRIPTION DRAWN DESIGN CHKD PM
APPD
31.316
31.489
31.136
30.946
29.311
29.214
29.762
30.294
30.765
30.770
30.578
30.677
30.752
PROJECT :
MSDP STAGE II PRIORITY WORKS
OGL 180 MLD VERSOVA WwTF (WwTF)
CLIENT :
BRIHANMUMBAI MUNICIPAL CORPORATION
31.386
27.525
26.425
27.925
27.925
28.000
27.925
27.925
26.425
27.525
30.676
PQC PMC: TATA CONSULTING ENGINEERS LIMITED
MUMBAI
DESIGN &
BUILD CONTRACTOR: DRN Infrastructure Pvt.Ltd.
-10.500
10.500
-9.792
-8.750
-7.000
-5.250
-4.000
-3.500
-3.000
-1.750
0.000
1.750
3.000
3.500
4.000
5.250
7.000
8.725
8.750
Offset TECHNOLOGY PARTNER
Xylem Water Solutions India Pvt. Ltd
TO CONTRACTOR :
ISSUED FOR
TITLE: