Professional Documents
Culture Documents
STAGE-02
0.2
1.8
5m
4.8 m
8m
2.3
2.7
8m
m
P8
m
2.3
1m
CP 814
16
EXIT
13 PP 1m
6.4
P8
C8
815
7m
C5
P
C12
G
.P
C.P
1.8
.-1
SH
OP
STA
C.P
C2
-1
P
IR-1
.-3
DN
UP
.
.
5m
C9 TH BE LLA
D2
FCD
LE 0
TO STA
+45
VEL
E FR CA TIO
0.2
IN
ON STED N O
FCD
81
T R AFT F LIFT 375XVEL
SH
.C
OP
.C
-3
W TEH E DU 00
LIFT
C.P
ER
ALL 37
EN
SH
.-2
PA
OP
A
CU 20
T
C.P
FI
RK
RY
-2
TO 0
6A
R
5X
.-4
IN
LE 0 UCT
11
UT
C1
G
LE 0
SH
+45V D 00
12
EL 5X12
12
+15
VEL
C3
CT
OP
C10
EL 5X65
37
37
EC
-4
.D
UC
P8
0
EN
8
T
TR
Y
C13
STA
PP
IR-2
C4
G
.P
UP
C6
LE 0
.
FIR P R
PU
+45
VEL
E & OO
M
LE 0
+15
O .
VEL
PH M
CO FLO 4 M
SE
RV LEV 0
IC EL
ER
ING
FCD
+30
ILD R
OO
.P
HID IRST =7.28
C7
M
Y
FIR CITY- 1200
C14
CAPAWD-
TR
EW
EN
D1
LE 0
ATE 66,0 ) Y
±0
VEL
R TA 00 TR
EN
W1
NK- LT.
(D
W2
F EL
AY
A
PH 0x87
C15 EW
30
U
W2
ED 5
RIV
ED
UC
V
B
WID
T
00
40
LE
PP
DO
MES CITY- 00(D
CA WD-
PA 12
TIC 10 )
WAT ,000
ER LT.
TANK
)
ON
81
G
CTI
.P
7
CON (UND NG
PIPE EMBEDDED IN 'U' TYPE RCC L I
D
BUI IDCO
(DIA: Ø1800MM)
CONCRETE DUCT BELOW THE FOOTPATH H
CP
81
8
21TTM
RAIL VIKAS NIGAM LIMITED
20SC2
AFCONS INFRASTRUCTURE LIMITED RVNL KOLKATA - PROJECT IMPLEMENTATION UNIT 23VPR
22RBT
(A Government of India Enterprise)
1ST FLOOR, AUGUST KRANTI BHAWAN, PLOT NO. 25, BHIKAJI CAMA PLACE, R.K. PURAM, NEW DELHI - 110066
19CVC
14BDN
18NTN
13TNP
17CB2 METRO CORRIDOR - NEW GARIA TO BIMAN BANDAR, KOLKATA
12SLV 16CB1
15SC1
11NCO
Name Designation Signature Name Designation Signature 10GKG
CONTRACT: ANVS :CONSTRUCTION OF VIADUCT,RAMP & UNDER GROUND RCC BOX
09BLG INCLUDING RELATED WORKS FOR 3.520 KM LENGTH FROM CH.25891.527 TO CH.29410.989
Mr. Jai Kumar Yadav Project Manager 08BSG BETWEEN EXISTING PIER CP 760 WITH ALL ALLIED WORKS IN NEW GORIA - BIMAN BANDAR
07RWG
06VBZ METRO CORRIDOR OF KOLKATA METRO RAILWAY LINE,WEST BENGAL.
05HMJ