You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

NORTH N

N
E
W KA
AM

D
N

MA
W

I
S

KK
A
S

A SITE
A
A=26,455 SQM
PIN=67100131

KEY PLAN
NOTE:

.1THIS DRAWING IS THE PROPERTY OF DOHA GROUP TRADING & CONTRACTING


COMPANY.IT IS NOT ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
B . 2ALL DIMENSIONS SHOWN ARE IN MM, UNLESS NOTED OTHERWISE. B
. 3THESE DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
RELEVANT SECTIONS OF THE SPECIFICATIONS.

. 4ALL LEVELS ARE REFERENCED WITH QND.95

. 5ALL BUILDINGS COORDINATES ARE IN RELATION WITH QND.95

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION


In addition to the hazards/risks normally associated with the types of work detailed
on this drawing, note the following specific residual risks (Reference shall also be
made to the design hazard log)

Construction

Maintenance / Cleaning

D Use
D

Decommisioning / Demolition

SN DOCUMENT REFERENCE
N
E

INTERLOCK
FFL. +0.00
INTERLOCK
FFL. +0.00
KA

INTERLOCK
FFL. +0.00
A
M ND
WI

SUBSTATION
SCHOOL
INTERLOCK
FFL. -0.90
S

EXIT
STORE (G)
OFFICE 1 /
+ 8.11 + 8.71
T.O.PR. T.O.PR.

ROOF FLOOR
FFL. +7.76
+ 8.71 + 8.71
T.O.PR. T.O.PR.

INTERLOCK
FFL. -0.90
+ 8.11 + 8.11

INTERLOCK
FFL. +0.00
T.O.PR.
SKY LIGHT T.O.PR.

42

ROAD LEVEL
FFL. -1.05
15 41

STUDENT'S

INTERLOCK
FFL. -0.90
BLOCKWORK

FABRIC SHADE
STEEL COLUMN
+7.76
EXIT
F.F.L.

14 40

13 39

EXTERNAL STAIR
+ 7.80
F.F.L.

FFL. +0.06
12 16 38
FFL. +0.00
SECONDARY INTERLOCK

EXIT
11 17 37
+ 8.71 + 8.11
+ 8.26
T.O.PR.
EXTERNAL STAIR FFL. +0.00
+ 8.71 + 8.71
INTERLOCK FFL. +0.00
T.O.PR. T.O.PR. T.O.PR. T.O.PR.
INTERLOCK

WOODEN COLUMN
B
10 18 36
SECTION

+ 8.11 + 8.11
09 19 35
T.O.PR. T.O.PR.

FABRIC SHADE
STEEL COLUMN
+ 8.26 + 8.26
T.O.PR. T.O.PR.
+ 8.71 08 20 34
T.O.PR.
+ 8.26 + 8.26

ROAD LEVEL
T.O.PR. T.O.PR.

FFL. -1.05
+ 8.71
T.O.PR.
07 21 33

SKY LIGHT ROOF SHADE


+ 7.80
+ 7.80
F.F.L.
F.F.L.
SKY LIGHT
06 01 32

INTERLOCK
FFL. +0.00
05 22 31

ROOF FLOOR
T.O.PR. T.O.PR.

FFL. +7.76
+ 8.26 + 8.26

04 23 30

ROOF FLOOR
FFL. +7.76
03 24 29

FABRIC SHADE
STEEL COLUMN
02 25 28

INTERLOCK
FFL. -0.90
Ø25 CDP DD
FFL. +0.00
INTERLOCK

ENTRANCE 1
T.O.PR. T.O.PR. T.O.PR. T.O.PR. T.O.PR.
+ 8.71 + 8.71 + 8.26 + 8.71 + 8.11 INTERLOCK

INTERLOCK
FFL. +0.00
01 26 27

EXTERNAL STAIR

MAIN BUILDING

INTERLOCK
INTERLOCK
FFL. -0.90

FFL. -0.90
FFL. +0.00
INTERLOCK

(G+1)
T.O.PR.
+ 8.11

OFFICE 3 (G)

ROAD LEVEL
CONCRETE TILE

FFL. -1.05

ENTRANCE
RAMP

CONCRETE TILE
FFL. -0.060

SCHOOL
INTERLOCK
FFL. +0.00

FFL. -0.060
INTERLOCK
FFL. +0.00

PARKING
2
FFL. +7.76
1
ROOF FLOOR

CAR
ENTRANCE 2

INTERLOCK
FFL. -0.90
T.O.PR.
+ 8.71
1

1 2

2 3

INTERLOCK
FFL. +0.00

INTERLOCK
FFL. -0.90

INTERLOCK
FFL. -0.90

GUARD
ADMINISTRATION
6 5 4 3 2 1

ROOM
FREE DISCHARGE

ENTRANCE

INTERLOCK
FFL. +0.00

OFFICE 4 (G)
1

ENTRANCE
2

FFL. +0.30
FLOOR LEVEL

BUS
RAMP
FFL. +0.00
INTERLOCK

INTERLOCK
FFL. +0.00
ROOF FLOOR
FFL. +5.79
CONCRETE TILE
ROOF FLOOR
FFL. +10.66

FFL. -0.060

CONCRETE TILE
CAFETERIA

FFL. -0.060
SPORTS
HALL (G)

SLOPE

PLAY GROUND
ROOF ROOF
SLOPE SLOPE

(G)
SHADE
SLOPE
ROOF
LOWER
RF-01

SCHOOL BUS
PARKING
ROOF FLOOR
FFL. +3.56

OFFICE 5

INTERLOCK
FFL. +0.00
(G)

TANK
ROOF FLOOR

FIRE
FFL. +3.98

PUMPS
ARTIFICIAL GRASS
STEEL COLUMN
FABRIC SHADE
FLOORING
OFFICE-4
2

FFL. -0.060
CONCRETE TILE

ROOM
PUMP
INTERLOCK
FFL. +0.00

INTERLOCK
FFL. +0.00

PUMP ROOM
PROPOSED

LOCATION
ROAD LEVEL
FFL. -0.15
G-01
FFL. +0.15 TOR. +0.15 SWIMMING
POOL

AREA OUT OF SCOPE LIMIT


FLOOR LEVEL

E E
00 2/8/2023 DETAIL DESIGN PACKAGE

Rev Date Revision Details Drawn Chkd. Appd.

00 LOCATION PLAN
SCALE 1:100

01 GROUND FLOOR PLAN 02 ROOF PLAN


SCALE 1:100 SCALE 1:100

Supervision Consultant:

F F
Main Contractor:
Doha Group Trading & Contracting
PO BOX: 22564 | Doha | Qatar
Tel   : + 974 4488 8041
Fax  : + 974 4488 8043
Website: www.dgc-qatar.com

Lead Designer : Sub Contractor:

G Project Code:
BP 2021 C 026 S G
Status:
DD
Discipline:

Project Name:
DESIGN AND BUILD OF REHABILITATION
AND RENOVATION OF JAWAAN SCHOOL

Drawing Title:

OFFICE- 4 PLANS
DRAINAGE SYSTEM

H H
Drawn: M.ISSA Checked: R.ALFUQHAA

Designed: M.ISSA Approved: R.ALFUQHAA

Date: 2/8/2023 Scale : 1:150

Drawing Number: Revision:


BP2021-C026S-JWN04-A01-DRAINAGE SYSTEM-FP-1001
00
1 2 3 4 5 6 7 8 9 10 11 12