You are on page 1of 2

AIR BALANCE ZONING & CALCULATIONS

The Building devidede into 5 air balanced zones, where the building compartments that have open to below courtyards are considered as single zone. Refer to zone Key
plan.

Zones from 01 to 04 are pressurized at 15%, where zone 05 is pressurized at 10% to ensure all spaces are positive with relevant to the main courtyard and the whole
building is positive with relevant to the outside.

MAIN SCHOOL BUILDING AIR BALANCE

BALANCE No. of FA / TOTAL FA L/s TOTAL FA L/s TOTAL EX


ZONE SPACE NAME AREA FA/M2 PERSONS PERSON ASHRAE ACTUAL L/s OCCUPANCY TYPE

HEAD MASTER (G-33) 26 0.3 8 2.5 27.80 30.00 0.00 Office space
TOILET (G-34) 3.4 ** ** ** ** ** 25.00 **
DEPUTY HEAD MASTER (G-32) 18 0.3 5 2.5 17.90 20.00 0.00 Office space
SECRETARY (G-31) 12.5 0.3 3 2.5 11.25 13.00 0.00 Office space
WAITING ROOM (G-28) 23.2 0.3 9 3.8 41.16 45.00 0.00 Wating Room
ZONE-01
ENTERANCE LOBBY (G-30) 46 0.3 5 2.5 26.30 40.00 0.00 Lobbies
TYP. & PRINT. (G-27) 2.7 ** ** ** ** ** 25.00 **
STAFF TOILET-1 (G-26) 6.3 ** ** ** ** ** 50.00 **
MAIN SERVER ROOM (G-29) 10.95 0.6 1 5 11.57 15.00 0.00 Computer Room
PANTRY-1 (G-25) 7.5 0.6 1 3.8 8.30 10.00 50.00 Kitchen
TOTAL AIR FLOWS (L/s) TOTAL FLOWS 144.28 173.00 150.00
POSITIVITY PRECENTAGE TOTAL FLOWS 288.56 1.15
CLASS ROOM-2 (G-08) 48.2 0.6 9 5 73.92 75.00 0.00 Classrooms
CLASS ROOM-3 (G-07) 48.3 0.6 9 5 73.98 75.00 0.00 Classrooms
CLASS ROOM-09 (G-01) 48.3 0.6 9 5 73.98 75.00 0.00 Classrooms
CLASS ROOM-10 (G-42) 54.5 0.6 9 5 77.70 80.00 0.00 Classrooms
SUPERVISOR-2 (G-44) 15.6 0.3 2 2.5 9.68 10.00 0.00 Office space
SPEACH THERAPY RM-1 (G-39) 14.9 0.3 3 5 19.47 20.00 0.00 Physical Therapy
SPEACH THERAPY RM-2 (G-38) 14.9 0.3 3 5 19.47 20.00 0.00 Physical Therapy
PHSYCHOLOGY RM-2 (G-37) 14 0.3 3 5 19.20 20.00 0.00 Physical Therapy
SENSORY ROOM-1 (G-36) 20 0.3 4 5 26.00 30.00 0.00 Physical Therapy
CORRIDOR LEFT+OPEN LEFT (G-45) 177.7 0.3 0 0 53.31 55.00 0.00 Corridor
ZONE-02 STAFF TOILET-2 (G-40) 8.3 ** ** ** ** ** 75.00 **
STUDENTS TOILET-2 (G-41) 17.4 ** ** ** ** ** 140.00 **
LIFE SKILLS ROOM (F-03) 72 0.3 9 2.5 44.10 45.00 0.00 Office space
COMPUTER ROOM-02 (F-01) 48 0.6 9 5 73.80 70.00 0.00 Computer Room
OCCUPATIONAL THERAPY-2 (F-37) 41 0.3 10 5 62.30 65.00 0.00 Physical Therapy
ASSISTIVE TECHNOLOGY (F-36) 42 0.6 9 5 70.20 70.00 0.00 Classrooms
TEACHERS OFFICES ROOM (F-33) 59 0.3 16 2.5 57.70 60.00 0.00 Office space
CORRIDOR LEFT (F-38) 114.6 0.3 0 0 34.38 35.00 0.00 Corridor
STAFF TOILET-4 (F-35) 5.1 ** ** ** ** ** 50.00 **
STUDENTS TOILET-5 (F-34) 23.7 ** ** ** ** ** 210.00 **
STORE ROOM-2 (F-02) 20.2 0.3 1 2.5 8.56 10.00 80.00 STORAGE ROOMS
General Exhaust for Air Balance ** ** 150.00
TOTAL AIR FLOWS (L/s) FLOOR TOTAL FRESH AIR 723.83 815.00 705.00
POSITIVITY PRECENTAGE TOTAL FLOWS 1154.18 1.16
CLASS ROOM-1 (G-10) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
CLASS ROOM-04 (G-06) 48.2 0.6 9 5 73.92 75.00 0.00 Classrooms
CLASS ROOM-05 (G-05) 49.1 0.6 9 5 74.46 75.00 0.00 Classrooms
CLASS ROOM-06 (G-04) 48.4 0.6 9 5 74.04 75.00 0.00 Classrooms
CLASS ROOM-07 (G-03) 48.4 0.6 9 5 74.04 75.00 0.00 Classrooms
CLASS ROOM-08 (G-02) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
SECURITY ROOM-3 G-12 15.7 0.3 1 2.5 7.21 10.00 0.00 Office space
CORRIDOR UP+OPEN UP (G-45) 237.7 0.3 0 0 71.31 75.00 0.00 Corridor
STUDENTS TOILET-1 (G-09) 21.6 ** ** ** ** ** 175.00 **
ZONE-03 CLASS ROOM-13 (F-04) 41 0.6 9 5 69.60 70.00 0.00 Classrooms
CLASS ROOM-14 (F-05) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
CLASS ROOM-15 (F-06) 48 0.6 9 5 73.80 75.00 0.00 Classrooms
CLASS ROOM-16 (F-07) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
CLASS ROOM-17 (F-08) 48.2 0.6 9 5 73.92 75.00 0.00 Classrooms
CLASS ROOM-18 (F-10) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
CALMING RM-2 (F-11) 11.4 0.6 2 5 16.84 18.00 0.00 Classrooms
SUPERVISOR-3 (F-12) 16 0.3 2 2.5 9.80 10.00 0.00 Office space
CORRIDOR UP (F-38) 117.7 0.3 0 0 35.31 35.00 0.00 Corridor
STUDENTS TOILET-4 (F-09) 21.3 ** ** ** ** ** 175.00 **
General Exhaust for Air Balance ** ** 550.00
TOTAL AIR FLOWS (L/s) FLOOR TOTAL FRESH AIR 951.85 1043.00 900.00
POSITIVITY PRECENTAGE TOTAL FLOWS 1454.32 1.16
CLASS ROOM-11 (G-13) 48.4 0.6 9 5 74.04 75.00 0.00 Classrooms
CLASS ROOM-12 (G-14) 49 0.6 9 5 74.40 75.00 0.00 Classrooms
CALMING ROOM 1 (G-16) 10.5 0.3 2 2.5 8.15 10.00 0.00 Office space
SOCIAL SUPERVISOR (G-23) 20 0.3 8 2.5 26.00 26.00 0.00 Office space
TEACHERS MEETING ROOM (F) (G-22) 22 0.3 12 2.5 36.60 40.00 0.00 Office space
MEDICAL ROOM CLINIC (G-20) 21.5 0.6 5 3.8 31.90 35.00 0.00 General examination room
PHYSIOTHERAPY (G-15) 85 0.3 12 5 85.50 85.00 0.00 Physical Therapy
CORRIDOR RIGHT+OPEN RIGHT (G-45) 186.6 0.3 0 0 55.98 60.00 0.00 Corridor
STUDENTS TOILET-3 (G-17) 21.4 ** ** ** ** ** 175.00 **
JANITOR-1 (G-19) 4 ** ** ** ** ** 25.00 **
FIRE COMMAND CENTER (G-16A) 10.7 0.3 1 2.5 5.71 10.00 0.00 Office space
ZONE-04
LIBRARY (F-23) 68 0.6 35 2.5 128.30 60.00 0.00 Libraries
FUNCTIONAL THERAPY (F-22) 32.5 0.3 8 5 49.75 50.00 0.00 Physical Therapy
ARTS &CRAFTS ACTIVITY ROOM-1 (F-16) 33.1 0.9 9 5 74.79 65.00 0.00 Art classroom
ARTS &CRAFTS ACTIVITY ROOM-2 (F-17) 33.5 0.9 9 5 75.15 65.00 0.00 Art classroom
MUSIC & DRAMA LANGUAGE LAB (F-15) 49 0.3 9 5 59.70 60.00 0.00 Music/theater/dance
SENSUAL S. & EDUCATIONAL M. C. A. ROOM (F-13) 40 0.3 9 2.5 34.50 30.00 0.00 Office space
CORRIDOR RIGHT (F-38) 120.2 0.3 0 0 36.06 35.00 0.00 Corridor
JANITOR (F-19) 2.8 ** ** ** ** ** 25.00 **
STAFF TOILET-3 (F-18) 9.7 ** ** ** ** ** 75.00 **
STUDENTS TOILET-6 (F-20) 20 ** ** ** ** ** 175.00 **
STORE ROOM-1 (F-21) 15.5 0.3 1 2.5 7.15 10.00 80.00 STORAGE ROOMS
General Exhaust for Air Balance ** ** 130.00
TOTAL AIR FLOWS (L/s) FLOOR TOTAL FRESH AIR 789.64 791.00 685.00
POSITIVITY PRECENTAGE TOTAL FLOWS 1260.75 1.15
ENTRANCE (G-49) 13.2 0.3 0 0 3.96 10.00 0.00 Corridor
SECURITY ROOM 1 (G-24) 11.7 0.3 1 2.5 6.01 10.00 0.00 Office space
SEC. ROOM 2 (G-35) 5.6 0.3 1 2.5 4.18 10.00 0.00 Office space
CORRIDOR (G-45) 2732.7 0.3 0 0 819.81 85.00 0.00 Corridor
OPEN SPACE 566.6 0.3 162 2.5 574.98 575.00 0.00 Multipurpose assembly
CORRIDOR (F-38) 240 0.3 0 0 72.00 75.00 0.00 Corridor
TEACHERS ROOM (F-31) 107 0.3 24 2.5 92.10 95.00 0.00 Office space
ZONE-05
OFFICE LARGE (F-28) 32 0.3 3 2.5 17.10 27.00 0.00 Office space
TOILET (F-29) 2.8 ** ** ** ** ** 25.00 **
OFFICE MEDIUM (F-25) 13.6 0.3 3 2.5 11.58 27.00 0.00 Office space
TOILET (F-26) 2.6 ** ** ** ** ** 25.00 **
OFFICE SMALL (F-27) 12.7 0.3 3 2.5 11.31 13.00 0.00 Office space
PANTRY-2 (F-32) 12.2 0.6 1 3.8 11.12 15.00 50.00 Kitchen
SERVER ROOM (F-24) 12.2 0.6 1 5 12.32 15.00 0.00 Computer Room
General Exhaust for Air Balance ** ** 765.00
TOTAL AIR FLOWS (L/s) FLOOR TOTAL FRESH AIR 1636.47 957.00 865.00
POSITIVITY PRECENTAGE TOTAL FLOWS 1792.00 1.11

You might also like