Professional Documents
Culture Documents
EJE 1-1, 2'-2', 4-4, 5-5; ENTRE m3 4 0.40 1.00 3.80 6.08
LOS TRAMOS B-C
EJE B'-B' ENTRE LOS m3 1 0.40 1.00 1.25 0.5
TRAMOS 2'-2''
EJE 2''-2'' ENTRE LOS m3 1 0.40 1.00 2.60 1.04 24.76
TRAMOS B'-C
4.02 SOBRECIMIENTOS
4.02.01 CONCRETO DE SOBRECIMIENTOS
EJE 2'-2'; ENTRE LOS TRAMOS m2 2x1 ------- 0.30 3.00 1.8
B'-C
EJE B'-B' ENTRE LOS m2 2x1 ------- 0.30 1.30 0.78
TRAMOS 2'-2''
EJE 2''-2'' ENTRE LOS m2 2x1 ------- 0.30 2.30 1.38
TRAMOS B'-C
EJE 1-1 ENTRE LOS m2 2x1 ------- 0.30 3.90 2.34
TRAMOS B-C
EJE 5-5; ENTRE LOS m2 2x1 ------- 0.30 4.10 2.46
TRAMOS B-C
EJE B-B, ENTRE LOS m2 2x1 ------- 0.30 3.20 1.92 38.04
TRAMOS 1-4
5.00 PISOS Y PAVIMENTOS
5.01 PISOS:
5.01.01 .- CONCRETO EN FALSO PISO
Area
EJE DESCRIPCIÓN Largo. (m) Ancho (m) (m2)
5-5 Tramo B-C 1 0.15 0.15
B-B Tramo 3-4 0.9 0.15 0.135
B-B Tramo 2-3 0.9 0.15 0.135
2-2 Tramo A-B 0.9 0.15 0.135
2'-2' Tramo B'-B' 0.9 0.15 0.135
2''-2'' Tramo B''-C 0.7 0.15 0.105
TOTAL = 0.80
B.- SALA
C.- COMEDOR
Area
Largo. (m) Ancho (m)
(m2)
3.6 2.5 9
D.- BIBLIOTECA
Area
Largo. (m) Ancho (m)
(m2)
3.6 2 7.2
E.- BAÑO
Area
Largo. (m) Ancho (m) (m2)
3 1.1 3.3
E.- COCINA
Area
Largo. (m) Ancho (m) (m2)
3.6 2.2 7.92
E.- PATIO
Area
Largo. (m) Ancho (m) (m2)
3.6 1.5 5.4
F.- DORMITORIO
Area
Largo. (m) Ancho (m)
(m2)
4.1 2.4 9.84
ÁREA A 64.57 m2
RELLENAR
ESPESOR DE 0.05 m
PISO
VOLUMEN DE
CONCRETO 3.2285 m3
Area
DESCRIPCIÓN Nª VECES Ancho (m) Long. (m) (m2)
4.00 0.15 0.90 0.54
Puertas 1.00 0.15 0.70 0.11
1.00 0.15 1.00 0.15
1.00 1.00 1.25 1.25
Sala
1.00 4.10 4.90 20.09
Comedor 1.00 2.50 3.60 9.00
Biblioteca 1.00 2.00 3.60 7.20
Baño 1.00 1.10 3.00 3.30
Cocina 1.00 2.20 3.60 7.92
Patio 1.00 1.50 3.60 5.40
Dormitorio 1.00 2.40 4.10 9.84
Area
DESCRIPCIÓN Nª VECES Ancho (m) Long. (m) (m2)
4.00 0.15 0.90 0.54
Puertas 1.00 0.15 0.70 0.11
1.00 0.15 1.00 0.15
1.00 1.00 1.25 1.25
Sala
1.00 4.10 4.90 20.09
Comedor 1.00 2.50 3.60 9.00
Biblioteca 1.00 2.00 3.60 7.20
Baño 1.00 1.10 3.00 3.30
Cocina 1.00 2.20 3.60 7.92
Patio 1.00 1.50 3.60 5.40
Dormitorio 1.00 2.40 4.10 9.84
1.00 0.25 0.90 0.23
Área a descontar
Total = 64.57
ESPESOR DE 0.04 m
CONTRAPISO
VOLUMEN DE
CONCRETO 2.5828 m3
7.02. VIGAS
h 20 cm
V DE CONCRETO 0.05 m3
V DE CONCRETO 0.0375 m3
POR LO TANTO EL VOLUMEN DE CONCRETO POR m2 SERÁ: 0.05+0.0378 = 0.0875 m3 por m2 de losa aligerada
VOLUMEN DE CONCTRETO
∀=59.125 𝑚^2∗(0.0875𝑚^3)/
〖 1𝑚 〗 ^2 = 5.17 m3