Professional Documents
Culture Documents
NORTH N
W
E
KA
A
M
D
W IN
MA
S
KK
A
S
A SITE
A
A=26,455 SQM
PIN=67100131
KEY PLAN
NOTE:
TOR. +5.15 In addition to the hazards/risks normally associated with the types of work detailed
on this drawing, note the following specific residual risks (Reference shall also be
made to the design hazard log)
Construction
OFFICE-2
Maintenance / Cleaning
G-02
Ø25 CDP H/L OFFICE -1
G-01
TOILET
G-05 Ø80 WP U/G TOR. +5.15
Ø110 SP U/G
Ø50 VP U/G
Ø25 CDP H/L
Ø50 VP T/A
Ø25 CDP U/G
Ø25 CDP DD
Ø25 CDP H/L
E E
Ø25 CDP H/L OFFICE-3 00 2/8/2023 DETAIL DESIGN PACKAGE
01 ROOF PLAN
G-04
SCALE
Rev Date Revision Details Drawn Chkd. Appd.
1:100
INTERLOCK
FFL. +0.00
INTERLOCK
FFL. +0.00
KA
INTERLOCK
FFL. +0.00
M
D
A
SUBSTATION
IN
W
SCHOOL
INTERLOCK
FFL. -0.90
S
EXIT
STORE (G)
OFFICE 1 /
+ 8.11 + 8.71
T.O.PR. T.O.PR.
ROOF FLOOR
FFL. +7.76
+ 8.71 + 8.71
T.O.PR. T.O.PR.
INTERLOCK
FFL. -0.90
INTERLOCK
+ 8.11 + 8.11
FFL. +0.00
T.O.PR. SKY LIGHT T.O.PR.
42
ROAD LEVEL
FFL. -1.05
15 41
STUDENT'S
INTERLOCK
STEEL COLUMN
FABRIC SHADE
FFL. -0.90
+7.76
EXIT
F.F.L.
14 40
13 39
EXTERNAL STAIR
+ 7.80
F.F.L.
FFL. +0.06 12 16 38
FFL. +0.00
SECONDARY INTERLOCK
EXIT
+ 8.26 11 17 37
+ 8.71 + 8.11
T.O.PR.
EXTERNAL STAIR FFL. +0.00
+ 8.71
INTERLOCK
+ 8.71
FFL. +0.00
T.O.PR. T.O.PR. T.O.PR. T.O.PR.
INTERLOCK
10 18 36
B
SECTION
Supervision Consultant:
+ 8.11 + 8.11
09 19 35
T.O.PR. T.O.PR.
FABRIC SHADE
STEEL COLUMN
+ 8.26 + 8.26
T.O.PR. T.O.PR.
+ 8.71 08 20 34
T.O.PR.
+ 8.26 + 8.26
ROAD LEVEL
T.O.PR. T.O.PR.
FFL. -1.05
+ 8.71
T.O.PR.
07 21 33
INTERLOCK
FFL. +0.00
05 22 31
ROOF FLOOR
T.O.PR. T.O.PR.
FFL. +7.76
+ 8.26 + 8.26
04 23 30
ROOF FLOOR
FFL. +7.76
03 24 29
FABRIC SHADE
STEEL COLUMN
02 25 28
INTERLOCK
FFL. -0.90
FFL. +0.00
INTERLOCK
ENTRANCE 1
T.O.PR. T.O.PR. T.O.PR. T.O.PR. T.O.PR.
+ 8.71 + 8.71 + 8.26 + 8.71 + 8.11 INTERLOCK
INTERLOCK
FFL. +0.00
01 26 27
MAIN BUILDING
EXTERNAL STAIR
INTERLOCK
INTERLOCK
FFL. -0.90
FFL. -0.90
FFL. +0.00
TO BE DEMOLISHED
INTERLOCK
(G+1)
T.O.PR.
+ 8.11
OFFICE 2 (G)
OFFICE 3 (G)
CONCRETE TILE
ROAD LEVEL
FFL. -1.05
ENTRANCE
CONCRETE TILE
RAMP
FFL. -0.060
SCHOOL
INTERLOCK
FFL. +0.00
INTERLOCK
FFL. -0.060
FFL. +0.00
PARKING
2
1
FFL. +7.76
ROOF FLOOR
CAR
ENTRANCE 2
INTERLOCK
FFL. -0.90
T.O.PR.
+ 8.71
1
1 2
INTERLOCK
2 3
FFL. +0.00
INTERLOCK
FFL. -0.90
INTERLOCK
FFL. -0.90
GUARD
ADMINISTRATION
6 5 4 3 2 1
ROOM
ENTRANCE
INTERLOCK
FFL. +0.00
OFFICE 4 (G)
ENTRANCE
1
2
FFL. +0.30
FLOOR LEVEL
BUS
RAMP
FFL. +0.00
INTERLOCK
INTERLOCK
FFL. +0.00
ROOF FLOOR
FFL. +5.79
CONCRETE TILE
ROOF FLOOR
FFL. +10.66
CONCRETE TILE
FFL. -0.060
FFL. -0.060
CAFETERIA
SPORTS
HALL (G)
SLOPE
PLAY GROUND
ROOF ROOF
SLOPE SLOPE
(G)
SHADE
SLOPE
ROOF
LOWER
RF-01
SCHOOL BUS
PARKING
ROOF FLOOR
FFL. +3.56
OFFICE 5
INTERLOCK
FFL. +0.00
(G)
TANK
FIRE
ROOF FLOOR
FFL. +3.98
PUMPS
ARTIFICIAL GRASS
STEEL COLUMN
FABRIC SHADE
FLOORING
2
FFL. -0.060
CONCRETE TILE
ROOM
PUMP
INTERLOCK
FFL. +0.00
INTERLOCK
FFL. +0.00
F
PUMP ROOM
PROPOSED
LOCATION
ROAD LEVEL
FFL. -0.15
F
Main Contractor:
SWIMMING
POOL
G Project Code:
BP 2021 C 026 S G
Status:
DD
Discipline:
PLUMBING
Project Name:
DESIGN AND BUILD OF REHABILITATION
AND RENOVATION OF JAWAAN SCHOOL
Drawing Title:
OFFICE - 1 PLANS
DRAINAGE SYSTEM
H H
Drawn: K.ASAIREH Checked: R.ALFUQHAA