ZAWTIKA DEVELOPMENT PROJECT PHASE 1D

ZWPxx PLATFORM
READY FOR COMMISSIONING (RFC) CERTIFICATE

SUBSYSTEM No:

SUBSYSTEM DESCRIPTION:

The CONTRACTOR hereby confirm that the above Subsystem as defined, has been constructed, installed, maintained, tested,
and pre-commissioned in full accordance with design drawings and PTTEP Specifications.

DISCIPLINE REPRESENTATIVE ACKNOWLEDGEMENT

No. Punch List Items CONTRACTOR COMPANY


Date
A B C Name Signature Name Signature

STRUCTURAL

ELECTRICAL

INSTRUMENT

MECHANICAL

PIPING & VESSEL

TELECOM

SAFETY

MISCELLANEOUS

TOTAL

TYPE DEFINITION as per PUNCH LIST PROCEDURE:

A Item considered as a block point for commissioning activity of the subsystem.


B Item considered as a block point for start-up activity of the subsystem.
C Item not considered as a block point for start-up activity, but linked to a contractual performance from the equipment and
milestone (for example partial acceptance, hand-over).

The Punch List print-out bearing signatures of same parties must be attached to this Ready For Commissioning (RFC) Certificate.

CONTRACTOR COMPANY
PRE-COMMISSIONING AND COMPANY SITE
CONSTRUCTION MANAGER COMMISSIONING SITE LEADER
COMMISSIONING MANAGER REPRESENTATIVE

Name : Name : Name : Name :

Date : Date : Date : Date :

Signature : Signature : Signature : Signature :