Professional Documents
Culture Documents
The release bolt included within the blocks of the PODx • Emergency towing, release.
Mooring system failure is not uncommon and
safeguards should be in place to mitigate the will separate on demand; allowing the link to reliably • FPSO reel integrated PODx.
consequences of such failures. release in under 10 ms at tensile loads above the yield
• FPSO heading control.
point of the shackles.
Emergency scenarios where mooring hawsers must • FPSO station keeping.
be released from the FPSO or CT should be taken
into account. PODx can quickly and safely release, via
hydraulic signal, the mooring hawsers under full load.
PODx quick and safe mooring release on FPSO and conventional tanker
• Load monitoring.
F(P)SO • Remote and local release.
CONVENTIONAL • Maintenance free for long period.
TANKER
Fairlead with sufficient • Smooth and quick commissioning process
internal clearance for the
hawser thimble and shackle Chafing chain with no welding of special adaptor plate.
export vessel end
Chafing chain
F(P)SO
Hawser Chain stopper
winch Thimble E-Type
both ends
lP
rotects FPSO and CT
lP
rotects personnel
Non-sparking fairlead Mooring winch
lining as requested Tandem mooring lS
aves the expense of mooring
hawser Mooring hawser line change
Hose and hawser handling line
handling crane lE
nhances the safety of your workforce
Lease automatic Cargo hose
Cargo
custody transfer
hose
support platform lP
revents costly system damage
meter
reel Cargo hose lM
inimises tanker/terminal downtime
floating type
lA
verts negative media attention
Export line Cargo hose
support platform lE
nables lower insurance premiums
Power operated Cargo hose lM
aximises terminal integrity
isolation valve flanged connection
Emergency lP
rovides operational control
shut-down valve
Tandem Mooring and Offloading Guidelines for Conventional Tankers at FPSO Facilities
Releasable Bolts and Nuts the R-Nut repels its thread sections radially with R-Bolt
The two options of Release Bolt (R-Bolt) and the use of an external sliding collar.
Nut (R-Nut).are both hydraulic release fasteners Systems have been deployed using M10
based on traditional load carrying geometry. to M125 nuts.
This standardisation allows for high The Gall Thomson R-Bolt and R-Nut have been Release Bolt: assembled
performance and integration in existing developed over 23 years within the defence
architecture and technology. and energy sectors. Initially developed for the
Both systems can be assembled and reset replacement of the exploding bolt in the French
quickly with standard wrenches/spanners. Ariane rocket motor development programme. Release Bolt: activated state
In the normal state, loads can be introduced Since then this technology has been used in a
wide range of applications and industries: from R-Nut
and retained. When a hydraulic signal is
introduced, the thread engagement is removed a variety of chain release systems, flange and
allowing the connection to be detached. structure release systems, mining, subsea oil
and gas, military and civil water treatment.
Disengaging is achieved with minimised
displacement and movement.
Release Nut: assembled
The R-Bolt changes its internal threads from
parallel to tapered in order to release. All
moving parts are contained internally; where
A range of activation methods are available: including hydraulic, electrical and pneumatic.
This technology has been deployed in a range of industries: including oil & gas, nuclear and defence.
Long life Reflex Hydraulic Power Unit (R-HPU) PODx Global Track Record
10-year design life. No moving parts until The R-HPU is a compact, pre-charged, for FPSO only
a release takes place. low maintenance HPU; offering a safe, rapid
1. BW Offshore Addax Petroleum through Bergesen
hydraulic signal to PODxor other Gall Thomson
DY. Vessel: Sendje Berge 1998, 2005, 2014. Set of
Ease of fitting Hydraulic devices. release bolts and spares sent 2006.
No extensive drilling or welding on the The HPU is operated via pneumatic or 2. BW Offshore Vessel Berg Helene 2004, 2015.
FPSO/Tanker deck is required to electrical push button controls, with mechanical
fit/assemble PODx. interlocks to prevent accidental activations. 3. Fred Olsen Vessel Knock Taggart 2003, 2010.
Spares sent in 2005 Incident occurred where
Robust The integral control valve self-relieves the release was required.
control lines compensating for temperature
PODxcan be supplied for FPSO loading 4. FPSO Ikdam Main Mooring unit 2001.
fluctuations, whilst retaining hydraulic pressure
tankers of up to 350 Tonnes SWL, as per
stored within accumulators when in the 5. Yinson FPSO Knock Adoon 2006.
OCIMF guidelines.
dormant state.
6. Fred Olsen Vessel Knock Allan 2007. Spares sent
The calliper is arranged such that only 13%
2010. Major incident occurred requiring release.
of the tensile load applied to the link is
transferred to the R-Bolt. 7. BW Offshore FPSO Petroleo Nautipa 2014, 2017.
Load pin
A load-monitoring shackle can be supplied to
monitor loads in a local or remote display panel.
3 C
B
E
DETAIL A
D
SCALE 1:5
F H
4
2 1
DIMENSION MM
PODx assembled
TYPE Weight A B C D E F G H
(kg)
250T 970 475 1542 846 440 200 1828 600 129
G
PODx activated
17T 16 147 481 276 176 53 565 251 42.5
Other Applications
PODx can be used in other applications where release of chains, cables and strops are required in
routine and emergency situations.
For bespoke projects, call the Gall Thomson team.
Product descriptions and specifications are subject to change without prior notice. Gall Thomson recommends that all information and data are confirmed with our technical department before
specifying, ordering or commissioning. Copyright © All information provided is subject to international copyright, trademark and patent laws and cannot be reproduced without the expressed
and written permission of Gall Thomson Environmental Ltd™. Trademarks protected: ERSOC™, Gall Thomson Environmental Ltd™. Protected by Worldwide Patents.
GFE2001D