MECHANICAL COMPLETION FOR PUMPS
SUB-SYSTEM : LOCATION :
TAG NUMBER : REVISION : ………………………………..
DOCUMENT NO. : PAGE : 1
RESULT
No ITEM CHECK LIST DATE SIGNATURE REMARKS
YES NO N/A
Installed as per PID/construction drawings
1
approval
Visual Inspection for complete and correction
2
installation
3 Check initial alignment
4 Bolt Tensioning
6 Cleanliness equipment
Pump skid and support installed base on
7
contruction drawing approval
Preservation has been done as Procedure
8
Preservation
Noted :
SUB-SYSTEM : LOCATION :
XXX herewith notify XXX & XXXX, that all sub-system/system/discipline for…....................for the…...............
have been achived Mechanical Completion and is ready for pre-commissioning activities.
This certificate confirms that the above items, as defined, have been pre-commisioning in full accordance with all applicable drawings,
specification and procedures. That all specified test have been completed to consider the system as mechanical completion
Noted :