You are on page 1of 2

PRODUCTION REPORT SITE UDU - INDEXIM

(Periode Februari 2023)

Coal Hauling CPS


DATE
Shift 1 Shift 2 Actual (Ton) Plan Ach (%) Fuel (L) FR Dist (km)

01-Feb-23 1.572,07 1.728,82 3.300,89 7.321,43 45% 575 0,03 6,11


02-Feb-23 2.133,96 2.142,38 4.276,34 7.321,43 58% 1.363 0,05 6,00
03-Feb-23 1.923,56 2.773,36 4.696,92 7.321,43 64% 1.152 0,04 6,02
04-Feb-23 3.928,28 3.237,79 7.166,07 7.321,43 98% 2.187 0,05 6,11
05-Feb-23 3.108,15 2.203,70 5.311,85 7.321,43 73% 1.928 0,06 6,00
06-Feb-23 2.075,30 3.272,50 5.347,80 7.321,43 73% 1.801 0,05 6,27
07-Feb-23 931,71 1.197,34 2.129,05 7.321,43 29% 978 0,07 6,24
08-Feb-23 1.891,41 3.231,38 5.122,79 7.321,43 70% 1.784 0,06 6,08
09-Feb-23 2.891,63 2.494,10 5.385,73 7.321,43 74% 1.798 0,05 6,10
10-Feb-23 2.350,71 2.197,77 4.548,48 7.321,43 62% 1.566 0,05 6,29
11-Feb-23 2.645,86 2.264,95 4.910,81 7.321,43 67% 1.669 0,05 6,41
12-Feb-23 335,34 335,34 7.321,43 5% 722 0,32 6,64
13-Feb-23 1.223,85 2.538,51 3.762,36 7.321,43 51% 356 0,01 6,59
14-Feb-23 3.138,93 2.274,86 5.413,79 7.321,43 74% 2.076 0,06 6,76
15-Feb-23 2.016,58 2.590,63 4.607,21 7.321,43 63% 2.325 0,08 6,13
16-Feb-23 1.745,83 726,21 2.472,04 7.321,43 34% 307 0,02 7,00
17-Feb-23 2.568,57 3.009,56 5.578,13 7.321,43 76% 2.123 0,05 7,00
18-Feb-23 2.766,45 1.288,86 4.055,31 7.321,43 55% 1.612 0,06 7,00
19-Feb-23 1.250,04 1.250,04 7.321,43 17% - 7,00
20-Feb-23 741,71 2.162,40 2.904,11 7.321,43 40% 850 0,04 7,00
21-Feb-23 2.461,06 2.212,58 4.673,64 7.321,43 64% 1.962 0,06 7,00
22-Feb-23 2.203,93 202,93 2.406,86 7.321,43 33% 1.103 0,07 7,00
23-Feb-23 - -
24-Feb-23 - -
25-Feb-23 - -
26-Feb-23 - -
27-Feb-23 - -
28-Feb-23 - -
TOTAL 45.904,93 43.750,63 89.655,56 205.000,00 44% 30.237 0,05 6,42
NOTE 22/02/23 :
Shift 1 : Awal shift safety K3 Bersama UDU.
Loading coal awal shift 2 fleet
Jam 07.40 2 unit DT parkir antri di front.
Jam 08.30 loading coal 1 fleet alat loading breakdown, wait exca
Jam 09.00 3 unit dt parkir antri front, total DT parkir 5 unit.
Jam 11.30 loading coal 2 fleet
Jam 15.25 hujan all front loading coal Dt parkir.
Shift 2 : Awal shift slippery
Perjam 03:31 loading coal 1 feet, unit yg operasi R-10
R-10 CPS 3 Unit
R-10 BRA 4 Unit
DAILY COAL PERFORMANCE & FUEL
22 February 2023

COAL PERFORMANCE FUEL


C/N Working
Type
Unit Hours Rit Tonnes Tonnes/Rit Rit/Hour Tonnes/Hour Litre Litre/Hours Litre/Ton
12R DT01 8,24 9 320,90 35,66 1,09 38,94 122 14,81 0,38
12R DT02 7,00 7 239,86 34,27 1,00 34,27 150 21,43 0,63
12R DT03 4,00 7 252,45 36,06 1,75 63,11 80 20,00 0,32
12R DT04 6,00 6 211,24 35,21 1,00 35,21 108 18,00 0,51
12R DT05 - - - - -
10R DT06 1,88 2 57,44 28,72 1,06 30,55 - -
10R DT07 7,00 9 255,35 28,37 1,29 36,48 - -
10R DT08 - - - - -
10R DT09 - - - - -
10R DT10 6,34 6 171,14 28,52 0,95 26,99 174 27,44 1,02
12R DT11 9,00 9 320,04 35,56 1,00 35,56 209 23,22 0,65
12R DT12 - - - - -
12R DT13 5,08 6 221,76 36,96 1,18 43,65 75 14,76 0,34
12R DT14 5,30 4 139,56 34,89 0,75 26,33 165 31,13 1,18
12R DT15 5,40 6 217,12 36,19 1,11 40,21 - -
Working
Type Rit Tonnes Tonnes/Rit Rit/Hour Tonnes/Hour Litre Litre/Hours Litre/Ton
Hours
DT 10R 15,22 17 483,93 28,47 1,12 31,80 174 11,43 0,36
DT 12R 50,02 54 1.922,93 35,61 1,08 38,44 909 18,17 0,47
TOTAL 65,24 71 2.406,86 33,90 1,09 36,89 1.083 16,60 0,45