REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY

CY 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PACKAGE 1A: STA.0+068 - 0+547.16, PACKAGE 4: STA.0+000.00 - 0+370.00, STA.0+000.00-0+282.13,
STA.0+000.00-310.00, STA.0+000.00-324.25, PACKAGE 5: STA.0+000-0+183.15
NET LENGTH = 1,948.69 L.M..

SUBMITTED: RECOMMENDED: APPROVED: CONCURRED:

MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E TIBURCIO DL CANLAS MARK T. LAPID


OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF OPERATING OFFICER - TIEZA
DATE: DATE: DATE: DATE:
PANAY ISLAND

N
POLITICAL MAP
of the THIS SITE
E
A
PHILIPPINES
S
Calog
Cr

Creek
N
O
CAR

Z
REGION I REGION II

U
L
REPUBLIC OF THE PHILIPPINES
REGION IV
LUZON
THE SITE REGION III

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Creek
NCR
Creek

Falls

REGION VIII
REGIONAL OFFICE VI

P H
REGION VI

FORT SAN PEDRO, ILOILO CITY

I L
VISAYAS
E

P P
ILOILO
G
A

I N E
S
S
A

PANAY ISLAND
P

S E A
N

P
A
L
A
W REGION VI

REGION VII
REGION XIII
(CARAGA)
C.Y.2022 PROJECT
A

REGION X

DETAILED ENGINEERING DESIGN PLAN FOR


E

U
L
S U

REGION IX
REGION XII
BORACAY DRAINAGE IMPROVEMENT PROJECT Mananipa Falls

MINDANAO
BORACAY ISLAND, MALAY, AKLAN
ARMM
VICINITY MAP
PACKAGE 1A: STA.0+068 - 0+547.16, PACKAGE 4: STA.0+000.00 - 0+370.00, STA.0+000.00-0+282.13,
A
E M I N S E A REGION XI
D A N A O
S
S
E
E B
C E L

STA.0+000.00-310.00, STA.0+000.00-324.25, PACKAGE 5: STA.0+000-0+183.15


NET LENGTH = 1,948.69 L.M.

382500.00 383400.00 384300.00 385200.00


1324800.00

PACKAGE 1A
KALAHI ROAD
KALAHI

PACKAGE 5
ROAD

END OF LAGUTAN ROAD TO PS4

WETLAND
04

PACKAGE 3
PUMPING STATION 04
WETLAND 06

1321200.00
TO YA
PAK
TO M
ANO
K MAN
OK PACKAGE 4
PACKAGE 4 LUGUTAN ROAD
BORACAY REGENCY ROAD

PACKAGE 4
SUNSET ROAD
PACKAGE 4
WHITE BEACH PCTV ROAD
1323900.00

LAYOUT PLAN SCALE: NTS

Reference system definition - LatLong

381600.00 382500.00 383400.00 384300.00


DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CONCURRED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAY C. QUINTILLA
ENGINEER I
REGIONAL OFFICE VI BORACAY DRAINAGE IMPROVEMENT PROJECT G 01
BORACAY ISLAND, MALAY, AKLAN LAYOUT PLAN, VICINITY AND LOCATION MAP PREPARED: SEVERO A. RUIZ MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E TIBURCIO DL CANLAS MARK T. LAPID
FORT SAN PEDRO, ILOILO CITY ENGINEER IV OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF OPERATING OFFICER - TIEZA
01 08 33
EVAN NIEL S. FUENTES
ENGINEER III DATE: DATE: DATE: DATE: DATE:
FOR W.S. TYPE REQ'D. IN
1.0 GENERAL NOTES 3. AT LEAST 50mm THICK LEAN CONCRETE SHALL BE PLACED, AS SOON AS THE FOUNDATION LAYER IS EQUAL
FLOOR SLAB SEE TYP. SECTION
EXPOSED, TO MINIMIZE DISTURBANCE DURING FOUNDATION CONSTRUCTION. THE FOUNDATION
1.1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AND SHALL NOTIFY THE LAYER SHALL BE CLEARED OF ROCKS AND SIMILAR DEBRIS.

0.0127
FORMED SEALANT GROOVE
ENGINEER OF DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND INFORMATION SHOWN ON THE 4. SEE PROVISIONS FOR BACKFILLING AND COMPACTION, ENSURING COMPLIANCE TO MATERIAL AND

CL
SEE STANDARD DRAWING
DRAWINGS BEFORE PROCEEDING WITH THE WORK. THIS SHALL INCLUDE THE LOCATION AND DIMENSIONS COMPACTION SPECIFICATIONS.

0.0635
OF GROOVES, REGLETS, SLEEVES, CURBS, OPENINGS, EMBEDDED OR ATTACHED ITEMS ETC. REFER TO

CL
EQUAL

0.0508
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS. 2.4 MATERIALS

1.2 ALL INDICATED DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED AND SHALL TAKE 2.4.1 REINFORCING STEEL BARS
PRECEDENCE OVER SCALED DIMENSIONS FROM PLANS, SECTIONS AND DETAILS. NOTES AND DETAILS ON FOR DETAILS OF TOP REINFORCEMENT
COLD JOINT APPLY 2 COATS OF BOND
DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 1. GRADE : REINFORCING STEEL DEFORMED BARS SHALL CONFORM TO ASTM 615 GRADE 40 (40 ksi) 276 BARS AT CONST. JOINT,
BREAKER. AVOID COATING WATERSTOP.
MPa -Ø12 & SMALLER AND FOR PRECAST WALL AND LEDGE REINFORCEMENT GRADE 60 (60 ksi) 414 MPa
SEE ROOF SLAB DETAILS
FOR BOND BREAKER, SEE SPECS. FOR REINFORCEMENT SEE
0.1143 0.1143

0.0635
1.3 THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. - Ø16 & BIGGER SLAB TYP. DETAILS 0.3810 0.3810

CL
THEY DO NOT INDICATE THE METHODS OF CONSTRUCTION, UNLESS SO STATED, THE CONTRACTOR 2. DOWEL CONNECTIONS (REBARS & PIPE SLEEVES) AT THE BOTTOM OF THE PRECAST PANEL WALLS AT
SHALL PROVIDE ALL NECESSARY MEASURES TO PROTECT THE STUCTURES, ADJACENT PROPERTY,
LAP LAP
GROUND FLOOR SHALL BE GALVANIZED, IF APPLICABLE. DOWEL BARS: SAME SIZE
COLD JOINT APPLY 2 COATS OF BOND
EXISTING UTILITIES, WORKMEN AND OTHER PERSONS DURING ALL PHASES OF CONSTRUCTION. THE 3. IN GENERAL, THE LATEST EDITION OF ACI - 315, MANUAL OF STANDARD PRACTICE FOR DETAILING AS SLAB REINF. SPACE AT
0.610 O.C. BREAKER. AVOID COATING W.S. & SPECS.
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONDITION WHICH IN HIS OPINION REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO, UNLESS OTHERWISE SHOWN OR GROOVE FOR BOND BREAKERS, SEE SPECS.
MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS IN THE STRUCTURE. NOTED ON DRAWINGS. FOR REINF. SEE ROOF
SLAB DETAILS WATERSTOP AT CENTER OF SLAB FOR
4. MILL CERTIFICATE OF REINFORCEMENT SHALL BE SUBMITTED FOR REVIEW BY THE STRUCTURAL
W.S. TYPE REQUIRED. IN ROOF SLAB CONST.
1.4 CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED SLABS. IT IS THE GENERAL ENGINEER. NOTES:
BOTTOM REINF. BARS TO BE JOINTS, SEE TYP. SECTION
CONTRACTORS RESPONSIBILITY TO ENSURE THAT SUBCONTRACTORS ARE INFORMED AND DO NOT 5. ALL BARS SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER. AT ALL SLAB CONST. JOINTS CONCRETE
CONTINUOUS THRU CONST. JOINT
VIOLATE THIS IMPORTANT REQUIREMENT. 6. ALL REINFORCING BARS SHALL BE CLEANED THOROUGHLY OF ALL LOOSE RUST, SOIL OR OTHER SHALL BE WORKED UNDER W.S. BY HAND,
MATERIAL IMMEDIATELY PRIOR TO PLACING OF CONCRETE. MAKING SURE THAT AIR & ROCK POCKETS
1.5 THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND SHORING FOR ALL STRUCTURE 7. A FULL BUTT WELDED SPLICE ALLOWED BY THE ENGINEER SHALL DEVELOP IN TENSION AT LEAST 125 ARE ELIMINATED.
MEMBERS AS REQUIRED FOR STRUCTURE STABILITY DURING ALL PHASES OF CONSTRUCTION. PERCENT OF THE SPECIFIED YIELD STRENGTH (fy) OF THE BAR.
8. ALL WELDING OF REINFORCEMENT ALLOWED BY THE ENGINEER SHALL CONFORM TO THE PROVISIONS ALL DIMENSIONS ARE IN METERS EXCEPT WHERE
1.6 THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO ENSURE PROPER ALIGNMENT OF THE OF THE STRUCTURAL WELDING CODE REINFORCING STEEL, AWS D 1.4. OTHERWISE SHOWN.
STRUCTURE AFTER THE INSTALLATION OF ALL STRUCTURAL AND FINISH MATERIALS. 9. A FULL MECHANICAL CONNECTION (REBAR SPLICER) SHALL BE DEVELOPED IN TENSION OR IN
COMPRESSION, AS REQUIRED, AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH fy OF THE BAR. IF
1 ROOF SLAB CONSTRUCTION JOINT 2 FLOOR SLAB CONSTRUCTION JOINT
1.7 TYPICAL DETAILS AND GENERAL NOTES ON THIS SHEET SHALL APPLY TO ALL PARTS OF THE JOB UNLESS S-01 SCALE NTS. S-01 SCALE NTS.
USED, SAMPLES ARE SUBMITTED FOR APPROVAL OF THE DESIGNER.
OTHERWISE SHOWN ON THE DRAWINGS. 10. GENERALLY, NO SPLICES SHALL BE PERMITTED ON MEMBERS WHERE CRITICAL BENDING STRESSES
OCCUR. LOCATION AND LENGTHS OF LAP SPLICES ARE INDICATED IN THESE NOTES AND ON THE
2.0 STRUCTURAL DESIGN CRITERIA STRUCTURAL DRAWINGS.
WATERSTOP CONTINUOS IN ALL
2.1 STANDARD DESIGN CODES & REFERENCES 2.5 MINIMUM CONCRETE COVER FOR REINFORCEMENT BEND WATERSTOP ON 125mm ROOF SLAB CONSTRUCTION JOINTS.
(5") RADIUS, MINIMUM BOND WATERSTOPS AT ALL ROOF
2.1.1 NATIONAL STUCTURAL CODE OF THE PHILIPPINES (NSCP) 2.5.1 SLABS ........................................................................................................................................ 40mm JOINT INTERSECTIONS BY HEATING.
2.5.2 BEAMS, COLUMNS AND PEDESTAL ....................................................................................... 50mm
2.1.2 AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS 2.5.3 WALLS ........................................................................................................................................ 50mm
2.5.4 FOOTING, TIE BEAMS AND BASE SLABS ............................................................................... 75mm NOTES:
1.2.1 ACI 350-CODE REQUIREMENTS FOR THE ENVIRONMETAL ENGINEERING CONCRETE STRUCTURES
1.2.2 ACI 315-DETAILS AND DETAILING CONCRETE REINFORCEMENT 2.6 CONSTRUCTION JOINTS WATERSTOP AT CENTER OF WALL WATERSTOPS SHALL BE CONTINUOS
1.2.3 ACI 318-BUILDING CODE REQUIREMENT FOR STRUCTURAL CONCRETE IN ALL VERTICAL CONSTRUCTION JOINT THROUGH FLOOR, WALLS & ROOF
OF RESERVOIR EXCEPT WHERE
CONSTRUCTION JOINTS SHALL BE PROVIDED IN ACCORDANCE WITH ACI 350R AND SHALL BE LOCATED SO AS
OTHERWISE SHOWN.
2.1.3 PHILIPPINE NATIONAL STANDARDS (PNS) TO LEAST IMPAIR THE STRENGTH OF THE STRUCTURE, TO PROVIDE LOGICAL SEPARATION BETWEEN BOND WATERSTOPS IN FLOOR AND SEALANT GROOVE. CONTINUOS AT
SEGMENTS OF THE STRUCTURE AND TO FACILITATE CONSTRUCTION. ALL REINFORCEMENT SHALL BE WALL CONSTRUCTION JOINTS WITH FLOOR SLAB CONSTRUCTION JOINTS. FOR WATERSTOPS TYPE REQUIRED
2.1.4 AMERICAN SOCIETY OR TESTING AND MATERIALS (ASTM) CONTINUED ACROSS OR THROUGH THE JOINT. ALL TYPES OF JOINTS SHALL BE PROVIDED WITH WATERSTOPS UNDER WALL BY HEATING CONTINUE GROOVE TO CENTER OF SEE DRAWINGS.
WATERSTOPS AND SEALANTS WHERE WATER TIGHTNESS IS REQUIRED. LOCATIONS OF ALL JOINTS SHALL WALL & FILL WITH SEALANT SO AS

0.75
2.1.5 AMERICAN SOCIETY OF CIVIL ENGINEERS MANUAL BE SHOWN ON THE DRAWINGS. TO BOND WITH WATERSTOP. SEALANT WATERSTOPS SAMPLES SHALL BE
UNDER WALL SHALL BE IN PLACE SUBMITTED FOR APPROVAL BY
2.1.6 AMERICAN INSTITUTE OF STEEL CONSTUCTION (AISC) 3.0 WORKS 3.1 EXCAVATION: PRIOR TO PLACEMENT OF CONCRETE THE ENGINEER.
FOR WALL
2.1.7 AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) DIMENSION ARE IN METERS UNLESS
EXCAVATION FOR STRUCTURE SHALL BE TO THE NEAT LINE AS SHOWN IN THE PLANS. THE GROUND
OTHERWISE SHOWN.
UNDERNEATH THAT SERVE AS STRUCTURE FOUNDATION SHALL BE LEFT UNDISTURBED. IF THE REQUIRED
2.1.8 UNIFORM BUILDING CODE (UBC) BEARING CAPACITY OF SOIL UNDER FOOTING CANNOT BE ATTAINED, THE ENGINEER SHALL BE NOTIFIED
FOR REDESIGN OF FOOTING.
2.1.9 PORTLAND CEMENT ASSOCIATION (PCA) CONCRETE INFORMATION
3.2 FILLING AND BACKFILLING: WATERSTOP CONTINUOS IN ALL
BEND WATERSTOPS ON 125mm FLOOR CONSTRUCTION JOINTS.
2.2 DESIGN LOAD (5") RADIUS, MINIMUM BOND WATERSTOPS AT ALL FLOOR
FILL AND BACKFILL MATERIAL SHALL CONSIST OF SUITABLE MATERIALS FROM EXCAVATION OR FROM JOINTS INTERSECTIONS BY HEATING.
2.2.1 DEAD LOAD: APPROVED BORROW AREAS, AND SHALL BE FREE FROM ROOTS, WOOD SCRAPS, VEGETATIONS, AND OTHER
EXTRANEOUS MATERIALS AND FROM LARGE CLODS OF EARTH OR STONES GREATER THAN 100 MM. NO FILL
2.2.1 CONCRETE ...................................................... 24.00 kN/m MATERIAL SHALL BE PLACED UNTIL THE SURFACE TO BE FILLED HAS BEEN APPROVED.
2.2.2 STEEL ............................................................... 78.00 kN/m 3 TYPICAL WATERSTOP INSTALLATION
2.2.1 WATER .............................................................. 9.81 kN/m a. FILLING AND BACKFILLING FOR STRUCTURES AND TRENCHES BACKFILLING AROUND STRUCTURES SHALL SCALE NTS.
2.2.1 SOIL
S-01
BE PLACED AS THE CONSTRUCTION WORK PROGRESS, INSOFAR AS PRACTICABLE. BACKFILLING OF
BORACAY, DRY .................................................. 17.60 kN/m TRENCHES SHALL PROGRESS AS RAPIDLY AS CONSTRUCTION AND TESTING WILL PERMIT. IN BACKFILLING
BORACAY, SATURATE ...................................... 19.00 kN/m PIPE TRENCHES, APPROVED BACKFILL SHALL BE COMPACTED IN 200mm LAYERS TO A DEPTH OF 150mm
OVER THE PIPE AND THE REMAINDER OF THE TRENCH DEPTH SHALL BE BACKFILLED AND COMPACTED IN 152
2.2.2 LIVE LOAD: 300mm LAYERS. FOR TRENCHES UNDER ROAD PAVEMENTS AND CONCRETE FLOOR SLABS, THE BACKFILL

15.9mm BULB
SHALL BE PLACED AND COMPACTED IN 200mm LAYERS TO THE TOP OF THE TRENCH.
2.2.1 ROOF WITH SLOPE ......................................... 1.44 kN/m

(MIN.)
2.2.2 ROOF DECK ..................................................... 1.92 kN/m b. EMBANKMENT CONSTRUCTION BEFORE PLACING FILL MATERIAL, THE SURFACE UPON WHICH IT WILL BE

3.2mm
(MIN.)
2.2.3 PUMP FLOOR AREAS ..................................... 12.00 kN/m

9.5mm
PLACED SHALL BE SCARIFIED TO INSURE GOOD BONDING BETWEEN THE EXISTING SURFACE AND THE FILL

9.5mm
(MIN.)

(MIN.)
FOR WALL REINF. SEE
2.2.4 STORAGE FLOOR AREAS .............................. 4.80 kN/m MATERIAL. WHERE EMBANKMENT ARE TO BE CONSTRUCTED ON SLOPING GROUND WITH SLOPES STEEPER TYP. DETAIL
2.2.5 PLATFORM FLOOR AREAS ............................ 4.80 kN/m WATERSTOP AT CENTER OF WALL FOR
THAN 1 VERTICAL TO 4 HORIZONTAL, THE NEW FILL SHALL BE CUT INTO OR BENCHED AS THE EMBANKMENT
W.S. TYPE REQ'D. IN WALL JOINTS,
2.2.6 HOUSING FLOOR AREAS ................................ 2.00 kN/m IS BROUGHT UP IN LAYERS IN SUCH A MANNER THAT THE EMBANKMENT MATERIAL WILL BOND WITH THE SEE TYPICAL SECTION

4.8mm

4.8mm
(MIN.)

(MIN.)
2.2.7 WORKSHOP FLOOR AREAS ........................... 7.20 kN/m EXISTING SURFACE. THE SIZE OF EACH BENCH SHALL BE SUBJECT TO APPROVAL AND SHALL DEPEND ON
EQUAL
THE EQUIPMENT TO BE USED.
2.2.3 EARTHQUAKE LOAD (EL)-SEISMIC EFFECT IN ACCORDANCE WITH UBC, ACI AND NSCP.
c. COMPACTION IN FILL AREAS, THE TOP 200mm SHALL BE COMPACTED TO A DENSITY OF AT LEAST 95
2.2.4 WIND LOAD (WL)-A MINIMUM OF 220 KPH BASIC WIND SPEED & EXPOSURE C OR D (AS APPROPRIATE) PERCENT OF MAXIMUM DENSITY AND THE REMAINING DEPTH OF FILL TO NOT LESS THAN 90 PERCENT OF
SHALL BE USED IN ACCORDANCE WITH THE UNIFORM BUILDING CODE (UBC). THE DESIGN SHALL MAXIMUM DENSITY; EXCEPT THAT UNDER RAMPS, PAVEMENTS, AND CONCRETE FLOOR SLABS, COMPACTION
BE GOVERNED BY MAXIMUM WIND OR MAXIMUM EARTHQUAKE LOAD, WHICHEVER IS GREATER . SHALL NOT BE LESS THAN 95 PERCENT OF MAXIMUM DENSITY FOR THE ENTIRE DEPTH OF FILL. UNLESS
OTHERWISE INDICATED, WHERE THE EXISTING SUB GRADE IN CUTS HAVE A DENSITY OF LESS THAN 95 4 0.152M CENTERBULB WATERSTOP 5 WALL VERTICAL CONSTRUCTION JOINT
2.2.5 HYDROSTATIC AND HYDRODYNAMIC LOADS: ALL HYDRAULIC STRUCTURES SHALL BE DESIGNED FOR PERCENT, ALL MATERIALS TO A DEPTH OF 150mm OR TO SUCH GREATER DEPTH AS MAYBE SPECIFIED, S-01 SCALE NTS. S-01 SCALE NTS.
HYDROSTATIC FORCES IMPOSED BY THE FLUID CONTAINED IN THESE STRUCTURES AND FOR SHALL BE COMPACTED TO NOT LESS THAN 95 PERCENT OF THE MAXIMUM MAYBE SPECIFIED, SHALL BE
HYDRODYNAMIC FORCES USING THE GROUND ACCELERATION AND THE RESPONSE SPECTRA PROVIDED COMPACTED TO NOT LESS THAN 95 PERCENT OF THE MAXIMUM DENSITY. SOIL MOISTURE DURING
BY THE GEOTECHNICAL REPORT. COMPACTION SHALL BE CONTROLLED BETWEEN 80 AND 110 PERCENT OF OPTIMUM MOISTURE CONTENT
DETERMINED IN ACCORDANCE WITH AASHTO METHOD T99-84.
2.2.6 LOADING CONDITION:
THE STRUCTURES SHALL BE DESIGNED FOR THE FOLLOWING CONDITION: 3.3 FALSE WORK:

2.6.1 TANK FULL: ALL FALSE WORK SHALL BE DESIGNED BY THE CONTRACTOR SUBJECT TO THE APPROVAL OF THE
HYDROSTATIC LOAD + DEAD LOAD; HYDRODYNAMIC + SEISMIC LOAD (DUE TO DEAD LOAD); ENGINEER.
HYDRODYNAMIC + SEISMIC LOAD (DUE TO DL) + DEAD LOAD
3.4 SURVEY WORK:
2.6.2 TANK EMPTY:
STATIC SOIL PRESSURE + DEAD LOAD; SEISMIC SOIL PRESSURE + SEISMIC LOAD (DUE TO DL) ALL ELEVATIONS SHALL BE CHECKED AND VERIFIED PRIOR TO EXECUTION OF ANY WORKS.
+SURCHARGE

2.6.3 UPLIFT:
ALL STRUCTURES SHALL BE CHECKED FOR UPLIFT WHEN SUBJECTED TO HIGH WATER TABLE.PROVIDE
WATER INSIDE TANK TO COUNTER BOUYANT FORCE DURING CONSTRUCTION IF NECESSARY
6 DETAIL OF STEEL LADDER RUNG
S-01 SCALE NTS.
2.3 FOUNDATION

1. ALLOWABLE SOIL BEARING CAPACITY WAS BASED ON THE GEOTECHNICAL INVESTIGATION REPORT.
THE VALUE SHALL BE VERIFIED DURING CONSTRUCTION.
2. THE CONTRACTOR SHALL UNDERTAKE THOROUGH INSPECTION DURING EXCAVATION AND SHALL
REPORT TO THE ENGINEER IF DIFFERENT MATERIAL CONDITION IS ENCOUNTERED.

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN STRUCTURAL NOTES 1 ADAPTED FROM TIEZA DRAWINGS G 02

02 08 33
TABLE 5
TABLE 1 - MINIMUM DEVELOPMENT LENGTH AND LAP LENGTH
SCHEDULE OF DIAGONAL CROSS BARS
MINIMUM DEVELOPMENT LENGTH MINIMUM LAP LENGTH
NO. OF BARS WALL THICKNESS
BAR DIAMETER
f'c=24MPa f'c=28MPa f'c=35MPa COMPRESSION TENSION
2 - Ø16 UP TO 175mm
SECOND LAYER
Ø10 350 330 300 400 500 2 - Ø20 200mm TO 500mm

1"CLEAR
1"CLEAR
Ø12 420 390 350 480 600 4 - Ø20 550mm TO 1000mm

Ø16 840 780 700 640 800 6 - Ø25 1000mm TO 2000mm

Ø20 1050 970 870 800 1000


Ø25 1310 1220 1090 1000 1250 NOTES ON HORIZONTAL JOINTS
Ø28 1470 1360 1220 1120 1400
CLEAR DISTANCE 1. LOCATE CONSTRUCTION JOINT BETWEEN
L/3 TO L/2 BUT NOT WITHIN H1 & H2 AS SHOWN
Ø32 1680 1550 1390 1280 1600
TABLE 4 2. SUBMIT SHOP DRAWINGS FOR ALL CONSTRUCTION JOINTS FOR
Ø36 1890 1750 1560 1440 1800
ENGINEERS APPROVAL
REINFORCEMENT TYPE TYPE MEMBER CLEAR DISTANCE
NOTE:
3. PROVIDE ALTERNATE HORIZONTAL JOINT CONSTRUCTION
DEVELOPMENT LENGTH, EITHER IN TENSION OR COMPRESSION DEFORMED BARS FLEXURAL MEMBERS db> 1 IN. LOCATION ON EACH FLOOR LEVEL
SHALL BE INCREASED BY :
COMPRESSION MEMBERS, 4. DO NOT PASS ANY HORIZONTAL JOINT CONSTRUCTION ON ALL
a. 20% FOR THREE BAR BUNDLE SHEAR WALL LOCATIONS, IN BOTH X AND Y DIRECTION.
b. 33% FOR FOUR BAR BUNDLE TIED OR SPIRALLY REINFORCED db> 1 IN.
H1 H2
A MINIMUM DEVELOPMENT LENGTH AND LAP LENGTH FLR. SLAB
S-02 SCALE NTS MINIMUM BAR SPACING LEVEL

H1

H2
A or G
HOOK
12db FOR 20mm LAP LENGTH
& 25mm
6db FOR 10mm,
12mm & 16mm PROVIDE CONSTRUCTION

db
JOINT BETWEEN (AS
DIMENSION SHOWN) SEE DETAIL
L/3
DETAILING

db
D

H
L2
b
D 4d L
DIMENSION
DETAILING

A or G db

D
db
FOR BEAMS WITH CONCENTRATED LOADS
6d

LAP LENGTH
b

FOR GIRDER FOR CORNERS

D 1. D = 600mm CENTER TO CENTER OF LAP SPLICE LENGTH.


2. FOR BUNDLE BARS, INDIVIDUAL BARS SHALL TERMINATE AT
DIFFERENT POINTS WITH AT LEAST 40 db STAGGER. FLOOR SLAB
LEVEL
℄ BEAM ℄ BEAM
LAP DISTANCE TYPE OF STIRRUPS
90° 135°
STIRRUP AND TIE HOOK DETAIL
CONSTRUCTION
JOINT (SEE DETAIL)
TABLE 2 - LENGTH OF STIRRUPS AND TIE HOOKS
MINIMUM BEND AND RECOMMENDED END HOOKS - STIRRUP AND TIE HOOKS
C MISCELLANEOUS REINFORCEMENT DETAIL L/2
S-02 SCALE NTS
L
BAR SIZE *MINIMUM 90° BEND 135° BEND

NOMINAL (db) ACTUAL (da) DIAMETER (D) A or G A or G H FOR BEAMS WITHOUT CONCENTRATED LOADS
10 12 40 105.00 110 80
PLACE COLUMN HOOP
12 14 50 115.00 115 80
HOOKS OPPOSITE AT
16 19 65 155.00 140 95 EACH END ALTERNATELY
30db 75757575 30db
20 23 115 305.00 205 115 TYP. TYP. ADDITIONAL TIES (TYP.)
SUPPLEMENTARY CROSSTIES
25 29 155 410.00 270 155
MUST ENGAGE HOOPS AND

BEAM HEIGHT
H/3 H/3 H/3
COLUMN HOOPS BE WIRED TO COLUMN
COLUMN HOOPS
VERTICALS
DETAILING HOOK DETAILING

H
DIMENSION A or G DIMENSION
db

db

PLACE CROSSTIES 135°


D D
12db

HOOKS OPPOSITE
A or G
J

FOR DIAGONAL CROSS 50 ALL REINFORCING BAR


BARS SAME DIAMETER AS SHALL CONTINUE
65mm OVERLAPPING HOOPS HOOP & CROSS TIES MAIN REINFORCEMENT UNINTERRUPTED
MIN. FIRST POUR SECOND POUR
180° 90°
END HOOKS DETAIL BEAM & GIRDER CONSTRUCTION JOINT DETAIL
TABLE 3 - LENGTH OF STIRRUPS AND TIE HOOKS
MINIMUM BEND AND RECOMMENDED END HOOKS - STIRRUP AND TIE HOOKS

b
30db

6°d
b

EDGE BAR 1-Ø12(CONT.)


6d

90
BAR SIZE *MINIMUM 90° BEND 135° BEND I.D = 4db

6db

50-100
°
NOMINAL (db) ACTUAL (da) DIAMETER (D) A or G A or G J 135
db

10 12 60 155 130 80
ALTERNATE 90° AND 135° ENDS
12 14 80 200 150 105

D
COLUMN HOOPS AT EACH END ON CONSECUTIVE CROSSTIES
16 19 95 250 180 130
1 PROVIDE
20 23 115 300 205 155 HOOP MAIN DETAIL SUPPLEMENTARY CROSSTIES DETAIL D 1 2-STIRRUPS

25 29 155 425 275 205 30db 30db


28 33 240 475 375 300

32 37 275 550 425 335 NOTE: AT THE LOCATION OF DEPRESSED SLABS, THE BOTTOM
OF BEAMS SHALL ALSO BE DEPRESSED.
36 42 305 600 475 375
42 49 465 775 675 550
FOR Ø10, Ø12 AND Ø16 TIES DEPRESSED BEAM ELEVATION
58 67 610 1050 925 725

B STANDARD HOOK & BEND D HOOPS & CROSS TIE BAR PLACEMENT DETAIL E CONCRETE BEAM & GIRDER CONSTRUCTION JOINT
S-02 SCALE NTS S-02 SCALE NTS S-02 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN STRUCTURAL NOTES 2 ADAPTED FROM TIEZA DRAWINGS G 03

03 08 33
COLUMN CONFINEMENT AS 500 500

SEE COLUMN
PER COLUMN SCHEDULE

SCHEDULE
(MINIMUM) (MINIMUM)
JOINT HOOP CONSTRUCTION JOINT Ldh BEAM REBARS
@100 TRANSVERSE
BEAM REBARS TERMINATION BEND
BEAM

(MINIMUM)
100
CONSTRUCTION JOINT CONSTRUCTION JOINT

(MINIMUM)
JOINT HOOPS
50

Xo Xo

500

Ldh
ROOF OR FLOOR
BEAMS
H\6

50 50
50 50
50
2 EXTRA TIES

50

50

50
50 50 50
CLEAR COLUMN HEIGHT : H

75mm O.C.
Ø16mm @
COLUMN CONFINEMENT TIES AS

h
6 PER COLUMN SCHEDULE
SEE SCHEDULE

HC
COLUMN TIES
COLUMN TIES

COLUMN REBARS INTERIOR COLUMN REBARS


@100

SPLICE IN VERTICAL BARS SHALL BE 1 2 EXTRA TIES


LOCATED WITHIN THE MIDDLE THIRD
OF CLEAR COLUMN HEIGHT AND
BEAM REBAR TERMINATION BEND

50
STAGGER SPLICE A MINIMUM
DISTANCE OF 600mm BETWEEN TWO

SEE COLUMN 50
ADJACENT BAR SPLICES. NOT MORE
THAN 33% OF THE BARS SHALL BE
INTERIOR COLUMN TERMINATION BEND

JOINT HOOPS
SPLICED IN ANY ONE LEVEL.

CONSTRUCTION JOINT
H\6

D D
GIRDER TOP BARS ARE LAID

SEE COLUMN
OVER OF BEAM TOP BARS
GIRDER TOP BARS
Xo > 1/6 (D) Xo <

SCHEDULE
Ld
50

BEAM REBARS (TOP BARS) LAID


OVER GIRDER TOP BARS
JOINT HOOP
@100

NOTES: NOTES:
1. THE 90-DEGREE HOOK SHALL BE LOCATED WITHIN THE CONFINED
1. FOR Hc < 1000mm PROVIDE
CORE OF A COLUMN OR OF A BOUNDARY MEMBER
CONFINEMENT AS SHOWN
Xo = OFFSET DISTANCE
2. FOR TIES/HOOPS ARRANGEMENT
SEE COLUMN SCHEDULE 12d

BEAM
REINFORCED CONCRETE COLUMN DETAIL COLUMN DETAILS DUE TO DIFFERENT ELEVATIONS DETAILS DUE TO COLUMN OFFSETS 50 50 BEAM REINFORCEMENT

INTERIOR COLUMN

NOTE :
AT GIRDER SPAN CLEAR DISTANCE BETWEEN
CONSTRUCTION JOINT REBARS ARE TO BE
(TYPICAL) STRICTLY MAINTAINED
300

BEAM
SOFFIT TYPICAL PLAN OF BEAM/GIRDER COLUMN JOINT
COLUMN CLEAR HEIGHT (H)

BEAM TOP BARS


CL OF SPLICE

COLUMN TIES AS PER SCHEDULE MAX. TIES


SPACING 6Ø BARS OR 150mm.
S

GIRDER REINFORCEMENT CLEAR SPAN "L"


R.C. COLUMN COLUMN CONFINEMENT TIES AS
PLAN STRUCTURAL R.C. PER COLUMN SCHEDULE L/4
Ldh COLUMN REBARS TO BE
Ldh EXTENDED AS PART OF
50 50

BEAM EXTRA TOP BARS


H/2

CONSTRUCTION JOINT

(MINIMUM)
(MINIMUM)
ROUGHEN TO 6mm CONFINING REINF. ZONE MAXIMUM OF
AMPLITUDE (TYPICAL) 1. CLEAR HEIGHT/6

500
500
2. MAX. COL. DIMENSION
3. 450mm.
TOP OF FOOTING

6 500 MIN. JOINT ROOF BEAM CONT.

50

50
REINF. ZONE TOP & BOT. BARS
@ MAT FTG.
1 BEAM STIRRUPS
ADD'L. 16mmØ CROSS JOINT-REINF. 50 50
TIES SPACED @ 400 CROSS-TIES
(Max) O.C. W/IN FOOTING BEAM BOTTOM BARS
SECTION COLUMN REBARS
2 EXTRA TIES

COLUMN REBARS CORNER/END COLUMN


REINFORCING BAR TERMINATION @ END OF COLUMN
NOTES ON SPLICING: NOTES:
1.
1. CENTER LINE OF SPLICE SHALL BE WITHIN CENTER HALF OF CLEAR COLUMN HEIGHT ALL CORNER BARS ARE TO BE BENT.
2. MAXIMUM SPACING OF TIES IN LAP LENGTH (S3) SHALL BE: 2. FOR NO. OF BARS < 8PCS. ALL BARS ARE TO BE BENT
a) d/4 OF SMALLEST COLUMN DIMENSION
3. FOR NO. OF BARS > 8 PCS. 50% OF THE BARS ARE
b) BUT NOT GREATER THAN 100mm TO BE BEND LESS THE CORNER BARS.
COLUMN VERTICAL BARS AT COLUMN INTERSECTION
3. NOT MORE THAN 33% OF THE BARS SHALL BE SPLICED WITHIN THE REQUIRED
EMBEDMENT TO FOOTING DETAIL TYP. BEAM AND GIRDER REBAR LAYOUT CORNER / EXTERIOR COLUMN TERMINATION BEND
LAP LENGTH

SEISMIC RESISTANT COLUMN SPLICING DETAIL

A MISCELLANEOUS COLUMN DETAILS B MISCELLANEOUS BEAM-COLUMN CONNECTION DETAIL


S-03 SCALE NTS S-03 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN STRUCTURAL NOTES 3 ADAPTED FROM TIEZA DRAWINGS G 04

04 08 33
SEALANT
150x150mm - LINTEL BEAM
WITH 2-10mmØ
NON-EXTRUDING TYPE
JOINT FILLER Ø12 HORIZONTAL BARS
(LONGITUDINAL) AT EVERY 3 LAYERS OF CHB

MASONRY BLOCK WALLS 150mm THK. CHB WALL


Ø12 VERTICAL BARS
1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE APPLICABLE STANDARDS AND SPECIFICATION OF AT 600mm ON CENTER
THE NATIONAL CONCRETE MASONRY ASSOCIATION AND UNIFORM BUILDING CODE. 150mm THK CHB WALL STIFFENER COLUMN 0.08 mm THICK POLYETHYLENE
VAPOR BARRIER
2. CONCRETE MASONRY UNITS SHALL CONFORM TO ASTM C 90 GRADE N. NON-LOAD BEARING BLOCKS SHALL HAVE AN
AVERAGE MINIMUM COMPRESSIVE STRENGTH OF 2.4MPa(350Psi).
4-12mmØ VERTICAL BARS
3. MORTAR AND GROUT FOR ALL REINFORCED MASONRY WILL CONFORM TO ASTM C270-TYPE M AND SHALL HAVE A
MINIMUM 28 - DAYS STANDARD CYLINDER COMPRESSIVE STRENGTH OF 21 MPa ( 3000 Psi ). Ø12 TRANSVERSE BARS
AT 300mm ON CENTER

600
12mmØ VERTICAL BAR
4. ALL CONCRETE HOLLOW BLOCKS MASONRY WALLS SHALL BE LAID IN RUNNING BOND ( INTERLOCKING COURSE ) WITH FULL
@600mm WITH 12mmØ 3-Ø10 LONGITUDINAL BARS
MORTAR BEDDING. STACK BOND SHALL BE USED ONLY WHEN SPECIFIED.
HORIZONTAL BAR @ 600

5. ALL CELLS SHALL SOLIDLY FILLED WITH CONCRETE-GROUT. 100mm THK. GRAVEL BED

200
WELL COMPACTED TO 95%%%
6. PROVIDE STIFFENER COLUMNS AT EVERY 3000mm O.C. WITH 4-Ø12 VERTICAL BARS & Ø10 TIES AT 200mm O.C. STIFFENER 10mmØ TIES @ 300mm MDD BASED ON ASTM D-698
COLUMN SIZE SHALL BE AT THE SAME THICKNESS AS CHBx300mm WIDE. (WHERE APPLICABLE)

7. PROVIDE STIFFENER BEAMS AT EVERY 3000mm O.C. WITH 4-Ø12 HORIZONTAL BARS & Ø10 TIES AT 200mm O.C.
STIFFENER BEAM SIZE WERE SAME THICKNESS AS CHBx300mm DEEP.

8. ALL MASONRY UNITS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE UNLESS OTHERWISE STATED IN THE PLANS. 450

9. BLOCK WALL REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS WHERE SPLICED, HORIZONTAL / VERTICAL
WF1
DOWELS FROM FOOTINGS, COLUMNS/WALLS OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS
OR A MINIMUM OF 400mm. WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL REINFORCEMENTS OF WALL.
Ø10 HORIZONTAL BARS
AT EVERY 3 LAYERS OF CHB 100mm THK. CHB WALL

Ø10 VERTICAL BARS


TABLE 6 AT 600mm ON CENTER
SCHEDULE OF CHB REINFORCEMENT FOR NON-LOAD ROOF BEAM ROOF BEAM

BEARING WALLS OR PARTITIONS


3-Ø10 CONT. BARS
REINFORCEMENT
BLOCK CONCRETE COLUMN CONCRETE COLUMN
NOTES Ø12 BARS
THICKNESS
HORIZONTAL VERTICAL @ 300 mm O.C.

150 "t" SLAB


Ø10mm DIA. BARS AT A. MINIMUM LAP SPLICE = 250mm
100mm Ø10mm @ 600mm O.C.
EVERY THIRD COURSE B. PROVIDE RIGHT ANGLED REINFORCEMENT

Ø12mm DIA. BARS AT 900mm LONG @ CORNERS


TYPICAL DETAIL OF 150mm THK CHB ON TOP OF ROOF BEAM TYPICAL CHB STIFFENER COLUMN DETAIL ON CHB WALLS
150mm Ø12mm @ 600mm O.C. SLAB ON FILL
EVERY THIRD COURSE C. WHERE CHB WALLS, ADJOIN COLUMNS, RC BEAMS AND 300
REBARS
(MIN) 150 400 150
Ø12mm DIA. BARS AT WALL DOWELS WITH SAME SIZE AS VERTICAL OR
200mm Ø12mm @ 600mm O.C.
EVERY THIRD COURSE HORIZONTAL REINFORCEMENT SHALL BE PROVIDED.
WALL HOR.
WF2
REINFORCEMENT
WALL VERT.
REINFORCEMENT
10 Ø BARS @ 600 4" CHB

TABLE 7

S/2EQ.EQ.
0.152m CENTERBULB 10mm Ø BARS
LINTEL BEAM IN CMU WALL OPENING (100MM & 150MM THK.) @ EVERY 3 LAYERS
WATERSTOP
CLEAR TOTAL MIN. fc' HEIGHT OF
REINFORCEMENT
SPAN,L LENGTH MPa LINTEL (mm)
300
(mm) L + 400mm TOP BARS BOT. BARS TIES

"t" SLAB
(TYP)

50
150 "t" SLAB
1200 1600 13.80 200 1 -Ø12mm 1 -Ø12mm Ø10 @200 O.C.

1500 1900 13.80 200 1 -Ø12mm 1 -Ø12mm Ø10 @200 O.C.


BASEMENT EXTERIOR RETAINING WALL JOINT DETAIL
1800 2200 13.80 200 1 -Ø12mm 1 -Ø12mm Ø10 @200 O.C.

100
2100 2500 13.80 250 2-Ø12mm 2-Ø12mm Ø10 @200 O.C.
ELASTIC SEALANT
2400 2800 13.80 250 2-Ø12mm 2-Ø12mm Ø10 @200 O.C.
3-10mmØ BARS
Ø10 @200 O.C.
400 50 (AS SHOWN)
2700 3100 13.80 250 2-Ø12mm 2-Ø12mm

3000 3400 13.80 300 2-Ø16mm 2-Ø12mm Ø10 @200 O.C. 100 WF3 12mmØ BOT. BARS
@300mm O.C.

NOTES: 12 SEALANT 150mm THK.


1. PROVIDE THESE ADDITIONAL BARS FOR ALL
CHB WALL
3. OMIT TRIMMER BARS WHERE OPENING IS
OPENINGS PLUS BARS (NOT SHOWN) PARALLEL FRAMED BY BEAM.
TO SIDE OF OPENING EQUAL TO THE NUMBER ELASTIC SEALANT NON-EXTRUDING TYPE Ø12 HORIZONTAL BARS
OF TERMINATED BARS AT OPENING. 4. DIAGONAL BARS JOINT FILLER AT EVERY 3 LAYERS OF CHB
W < 400mm 1-Ø12 TOP & BOTTOM BARS 12 Ø12 VERTICAL BARS

6
2. SEE ARCHITECTURAL & MECHANICAL PLANS W > 400mm 2-Ø12 TOP OF BOTTOM BARS AT 600mm ON CENTER
FOR SLAB OPENING LOCATION. W < 150mm OR 0.10M (NO ADDITIONAL ø12 BACKER ROD
REINFORCEMENT REQ'D.)
CHB WALL
Ø12 x 1000 LONG AT MID-DEPTH 0.08 mm THICK
OF SLAB AT EACH CORNER POLYETHYLENE
VAPOR BARRIER

Ø12 TRANSVERSE BARS


400

Ø12 @ 150mm EXTEND BARS CHB VERT. REINF.


UP TO BEAM SUPPORT (SEE SCHED. OF REINF. TABLE II) AT 300mm ON CENTER
3-Ø10 LONGITUDINAL BARS

600
RC COLUMN OR
WALL 100mm THK. GRAVEL BED WELL
CHB HOR. REINF. COMPACTEDTO 95% MDD BASED ON
COLUMN (SEE SCHED. OF REINF. TABLE II)
1-Ø12 TOP ASTM D-698(WHERE APPLICABLE)
& BOTTOM BARS ADDITIONAL TRIMMER BARS 1-Ø10 EXTRA

200
40 (SHOWN AS DOTTED LINES), AS VERT. REINF.
SIDE OF OPENING EQUAL TO THE
NUMBER OF BARS TERMINATED
BY THE OPENING
SEE NOTE NO.9 OF MASONRY
DIAGONAL BAR BLOCK WALLS ON DWG. NO. S001-5

IN TWO WAY SLAB EXTEND


BARS UP TO BEAM SUPPORT 450

WALL EXPANSION JOINT DETAIL WALL REINFORCING AT R.C. COLUMN/WALL WF4


400

1 DETAIL OF OPENING
S-04 SCALE 1:15

A MISCELLANEOUS DETAILS B CHB WALL FOOTING DETAILS


S-04 SCALE NTS S-04 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN STRUCTURAL NOTES 4 ADAPTED FROM TIEZA DRAWINGS G 05

05 08 33
2-Ø10 POWDER ACTUATED

25 MIN.
STUD ANCHOR (OR EQUAL)
CHB WALL
200x300x6 PL. SUPPORT
CHB VERT. REINF. @ 1200 O.C.
(SEE SCHED. OF REINF. SLAB/BEAM
DWG. NO. S001-5) COMPRESSIBLE FILLER MATERIAL CHB INTERIOR UNITS HOR. MASONRY REINFORCEMENT

25 MIN.
COMPRESSIBLE FILLER MATERIAL
LINTEL BLOCK W/ 2-Ø16
BLOCK WALLS ON

CHB VERT. REINF. DOWELS CONT. HOR. REINF. (SEE SCHEDULE DWG. NO. S001-5)
DWG. NO. S001-5
SEE NOTE NO.9
OF MASONRY

(TO MATCH VERT. REINF.) L 75x75x6x300 LG. SUPPORT @ 1200


CHB WALL
O.C. 2-Ø 12
L 75x75x6x300 2-Ø12 HORIZONTAL BARS
CHB WALL CROSS BARS
CHB. VERT. REINF. LG. SUPPORT @ 1200 O.C.
2-Ø10 POWDER ACTUATED STUD (SEE SCHED. OF REINF. DWG. NO. S001-5)
ANCHOR (OR EQUAL) 2-Ø10 POWDER ACTUATED STUD CHB. VERT. REINF. (SEE SCHED.
LINE OF DEPRESSED SLAB @ OTHER
ANCHOR (OR EQUAL) OF REINF. DWG. NO. S001-5)
SIDE WHEN REQUIRED SUSPENDED SLAB
SUSPENDED SLAB

SLAB,t
SLAB
DEP.

BOND BEAM UNIT

INTERIOR WALL SUPPORT AT BOTTOM EDGE OF BEAM


WALL BASE REINFORCING AT FLOOR W/ DEPRESSION INTERIOR WALL SUPPORT AT BOTTOM OF SLAB/BEAM
200
6mm THK. PL ANCHORED TO CONCRETE
BOTTOM OF CONCRETE SLAB/ (MIN)
SLAB W/ 2-Ø10 POWDERED ACTUATED
BEAM OR STEEL TRUSS
STUD OR WELDED TO BOT. OF STL. TRUSSES CHB CONNECTION DETAILS
ADDITIONAL Ø10 @ 400 O.C.
SEE NOTE NO.9 OF MASONRY
CHB WALL BLOCK WALLS ON DWG. NO. S001-5
CHB WALL L 64 x 64 x 6MM BEAM/SLAB
BLOCK WALLS ON DWG. NO. S001-5

COLUMN
BRACE @ 1200 O.C. 6mm THK. PLATE ANCHORED TO
SEE NOTE NO.9 OF MASONRY

CONCRETE SLAB OR STEEL TRUSS

300
300
BRACE ANGLE 64x64x6mm
@ 1200 O.C. SEALANT W/BACKER ROD
ON BOTH SIDE
SEALANT W/BACKER ROD
TOP OF CHB WALL ON BOTH SIDE PELT PAPER ON
2-Ø16 EXTRA VERT. BARS
1-Ø16 BOLTS PELT PAPER ON PVC SLEEVE
CHB VERT. REINF. (SEE SCHED. ADDITIONAL Ø10 2-Ø16 EXTRA VERT. BARS
2-Ø10X150LG. ANCHOR BOLTS PVC SLEEVE
OF REINF. DWG. NO. S001-5) @ 400 O.C. WT6X13x4" LG. W/ 100
CHB VERT. REINF. (SEE SCHED. LG. FOR 1-Ø16mm BOLT
OF REINF. DWG. NO. S001-5) WT6x13x4" LG.
CHB HOR. REINF. (SEE SCHED. CEILING LINE
OF REINF. DWG. NO. S001-5) LINTEL BLOCK 2-Ø16
CHB VERT. REINF. (SEE SCHED.
CHB VERT. REINF. (SEE SCHEDULE CONT. HORIZONTAL BARS
OF REINF. DWG. NO. S001-5)
FOR REINF. DWG. NO. S001-5) 2-Ø10x150 LG. ANCHOR BOLTS EXTERIOR CHB WALL
EXTERIOR CHB WALL ON R.C. WALL
ON R.C. WALL

ELEVATION SECTION EXTERIOR WALL REINFORCEMENT AT EXTERIOR WALL SUPPORT AT BOTTOM


WALL REINFORCING AT CORNER WALL REINFORCING AT INTERSECTION COLUMN WALL OF BEAM OR SLAB SOFFIT
WALL TOP SUPPORT IN AREAS WITH DROPPED CEILINGS
W=1200 MAX. CHB"t" 3.00 3.00 3.00
W=1200 MAX. (FOR W=1200 PLUS - CONSULT STRUCTURAL ENGR.) BOTTOM OF BEAM OR
(FOR W=1200 PLUS - CONSULT STRUCTURAL ENGR.) 300 300 SLAB SOFFIT (MAX.) (MAX.) (MAX)
D PIPE SLEEVE
300 300 BOTTOM OF BEAM OR - REQUIRED
SLAB SOFFIT

CONCRETE FILLER

(MAX.)
PIPE

3.00
25mm GAP
LINTEL BEAM W/ CHB WALL STIFF. BEAMS
A 1-Ø16 CON. CONCRETE

(MIN)
LINTEL BEAM W/ -
A 2 - Ø 12 HOR. REINF. FILLER
- CONTINUOUS
B

(MAX.)
HORIZONTAL WINDOW
H

3.00
REINFORCEMENTS - OPENING STIFF. COLUMNS

C
- (SEE SCHEDULE DWG. NO. S001-5) MASTIC SEALANT
DOOR EACH SIDE
H

OPENING PIPE SLEEVE


REQUIRED
SILL HEIGHT

B PIPE SLEEVE
600 MIN.

- 1-Ø16 VERT. BARS


VERT. MASONRY REINFORCEMENT COMPRESSIBLE
1-Ø16 ADDITIONAL
VERT. BARS MATERIALS

CHB WALL

PIPE SLEEVE THRU WALL SECTION D TYPICAL STIFFENER BEAM/COLUMN ELEVATION


NOTE:
OMIT EXTRA REINF. FOR OPENING LESS
400

100mm
THAN 200 MM VERT. & 400 MM. HOR.

DOOR OPENING ELEVATION WINDOW OPENING ELEVATION


CHB "t" 100 150
100 150
VARIES

100 THK. CHB WALL 150 THK. CHB WALL CONC. EXTENSION WHEN 2Ø12 VERT. BARS FOR H≤3.0m
REQUIRED W/ 2-Ø16 REINF. 3-ø12 VERT. BARS FOR 3.0m<H<4.0m
CHB. VERT. REINF. 3-ø16 VERT. BARS FOR H>4.0m
CHB WALL CONC. END
(SEE SCHED. OF REINF.)
BLOCK
2-Ø12 HOR. BARS Ø10 TIES SPACED@ 150 O.C TO C.L.
CHB. VERT. REINF. 2-Ø12 HOR. BARS ALTERNATELY PLACED (TYP.)
CHB. VERT. REINF. (SEE SCHED. (SEE SCHED. OF REINF. 400

150mm
CHB "t"

OF REINF. DWG. NO. S001-5) DWG. NO. S001-5)

400
Ø10 SPACED

400
Ø10 SPACED
@ 150 O.C. (TYP.)
CHB. VERT. REINF. (SEE SCHED. @ 150 O.C. (TYP.)
ALTERNATELY PLACED
OF REINF. DWG. NO. S001-5)
1-Ø16mm
200 (MIN.)

200 (MIN.)

LINTEL BLOCK W/ 2-Ø12 LINTEL BLOCK W/ 4-Ø12 CONT.


4Ø12 VERT. BARS FOR H≤3.0m
CONT. HOR. REINF. HOR. REINF. CHB HOR. REINF. (SEE SCHED. CHB WALL 6-ø12 VERT. BARS FOR 3.0m<H<4.0m
OF REINF. DWG. NO. S001-5) 6-ø16 VERT. BARS FOR H>4.0m
Ø10 @150 O.C. TYP. Ø10 @150 O.C. TYP.
Ø10 TIES SPACED @
150 O.C.

SECTION A SECTION B SECTION C TYPICAL CHB STIFFENER BEAM DETAIL TYPICAL CHB STIFFENER COLUMN DETAIL ON CHB WALLS

A STANDARD DETAILS FOR CHB


S-05 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN STRUCTURAL NOTES 5 ADAPTED FROM TIEZA DRAWINGS G 03

06 08 33
INDEX OF DRAWINGS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CONCURRED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAY C. QUINTILLA
ENGINEER I

REGIONAL OFFICE VI BORACAY DRAINAGE IMPROVEMENT PROJECT G 07


BORACAY ISLAND, MALAY, AKLAN INDEX OF DRAWINGS PREPARED: SEVERO A. RUIZ MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E TIBURCIO DL CANLAS MARK T. LAPID
FORT SAN PEDRO, ILOILO CITY ENGINEER IV OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF OPERATING OFFICER - TIEZA
07 08 33
EVAN NIEL S. FUENTES
ENGINEER III DATE: DATE: DATE: DATE: DATE:
SUMMARY OF QUANTITIES

QUANTITIES ARE SUBJECT TO DECREASE OR INCREASE AS PER ACTUAL ACCOMPLISHMENT AND AS CERTIFIED BY THE ENGINEER.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CONCURRED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAY C. QUINTILLA
ENGINEER I

REGIONAL OFFICE VI BORACAY DRAINAGE IMPROVEMENT PROJECT G 08


BORACAY ISLAND, MALAY, AKLAN SUMMARY OF QUANTITES PREPARED: SEVERO A. RUIZ MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E TIBURCIO DL CANLAS MARK T. LAPID
FORT SAN PEDRO, ILOILO CITY ENGINEER IV OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF OPERATING OFFICER - TIEZA
08 08 33
EVAN NIEL S. FUENTES
ENGINEER III DATE: DATE: DATE: DATE: DATE:
START OF PROJECT
STA. 0+068.00
REDEFINED BY DPWH

KALAHI RO
AD

N
A PLAN
- SCALE 1:1000

AKN-36
N=1,323,764.652
E=382,244.721
EL.=2.339m
20cm x 20cm CONCRETE
MONUMENT W/ BOLT @ CENTER

END OF PROJECT
0+547.16 1
DS-05

C MH-02 @ STA. 0+267 E DRAINAGE SCHEDULE


- SCALE 1:50 MH-01 & MH-03 - SCALE NTS

D @ STA. 0+220 AND STA. 0+330


- SCALE 1:50

B PROFILE
- SCALE 1:1000

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(PACKAGE 1A - KALAHI ROAD)
ADAPTED FROM TIEZA DRAWINGS PP 09

01 07 33
0 30
. 0+
INE ET 2
STA
HE
MAT SEE S
CHL
A1 P L A N
- SCALE 1:500
N

A2 PROFILE
- SCALE 1:500

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(PACKAGE 4 - LAGUTAN ROAD)
ADAPTED FROM TIEZA DRAWINGS PP 10

02 07 33
N

300
. 0+
STA
1
ET
SHE
NE
HLI
SEE
C
MAT

A1 P L A N
- SCALE 1:500

A2 PROFILE
- SCALE 1:500

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(PACKAGE 4 - LAGUTAN ROAD)
ADAPTED FROM TIEZA DRAWINGS PP 11

03 07 33
LEGEND:
TO MANOC -

RESORT AY
DRAINAGE LINE
MANOC

HOLID
1+540
FLOW DIRECTION

BO CAY
BEGINNING OF PROJECT ROAD INTERSECTION A1 400X500mm BASE X HEIGHT OF U-DITCH
STA. 0+000.00 (SEE DETAIL)

A
DS-01

R
1000mm DIAMETER OF HDPE PIPE

H
HDPE HIGH-DENSITY POLYETHYLENE

FIESTA
STA. 0+020.00 END OF PROJECT

C
PROVIDE BAR SCREEN STA. 0+287.13

1+560
INSIDE THE MANHOLE LS LIFT STATION
TO TRAP DEBRIS

A
DIM DROP INLET MANHOLE
1-1200mm Ø HDPE

E
IE = 2.69m INSTALLED U-DITCH & MANHOLE
0+000

0+020
LS-01

0+040

B
0+060
R O A D

0+100
1+580

0+120
0+08

0+280

0+287.13
0+260
NOTES:

0+140

0+240
0+220
0+160

0+200
0+180

T E
1-1200mm Ø HDPE
1) PROVIDE INLET AS EVERY 20M INTERVAL.
IE = 2.70m
2) U-DITCH W/ COVER SHALL HAVE A
BORACAY REGENCY ROAD MINIMUM FREE BOARD OF 100mm.

I
3) PROVIDE MANHOLE AT EVERY CHANGE
M A I N

H
S
1+600

OF DIMENSIONS AND DIRECTIONS.


AZALEA

E 4) THE 1500mmØ HDPE PIPE IS USED TO

W
PROVIDE EXTRA STORAGE.

W
1+620

N
TO PLAN
SCALE: 1:700m
YAPAK
Cannot draw reference system - no coordinate system assigned

10
E L E V A T I O N

LINK ROAD 04 STA.0+000.00/


STA. 0+089.13

STA. 0+209.13
MANHOLE 01

MANHOLE 03
BEGINNING OF PROJECT
STA. 0+000.00

HDPE 1000mmØ
STA. 0+000.00

STA. 0+132.13

MANHOLE 02
I.E= +1.437
END OF PROJECT
STA. 0+287.13
LS-01

5
LS-01
DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM

DIM
IIE=2.694
1-1200mmØ
HDPE PIPE

PROFILE
PROVIDE VERTICAL SCALE: 1:70m
HORIZONTAL SCALE: 1:700m
BAR SCREEN
0
0+280 0+300 0+320 0+340
STATION 0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260
0+287.13
3.241
4.190

3.656

3.406

3.369

3.270

3.160

3.193

3.217

3.208

3.267

3.363

3.389

3.072

2.926
3.205
3.41

3.21

3.21
4.19

3.66

3.37

3.27

3.24

3.16

3.19

3.22

3.27

3.36

3.39

3.07

2.93
ORIGINAL GROUND

PIPE INVERT
0.911

0.933
1.233

1.246
1.246

1.269
1.469

1.50
ELEVATION
PIPE/U-DITCH 1500mmØ HDPE 1200mmØ HDPE 1200mmØ HDPE 1000mmØ HDPE
SIZE

SLOPE 0.00024 0.00030 0.00030 0.0004

LENGTH (m) 89.13 m 43.00 m 77.00 m 78.00 m


Reference system definition - LatLong

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(BORACAY REGENCY ROAD SECTION)
ADAPTED FROM TIEZA DRAWINGS PP 12

04 07 33
LEGEND:
TO BRGY.
SAN ROQUE DRAINAGE LINE

1+480
FLOW DIRECTION

SEAM WIRELESS
400X500mm BASE X HEIGHT OF U-DITCH

ACE
BEGINNING OF PROJECT
STA. 0+000.00
1000mm DIAMETER OF HDPE PIPE

H
BORACAY
END OF PROJECT
1+500
HDPE

DAUM
HIGH-DENSITY POLYETHYLENE
ROAD INTERSECTION A1

C
(SEE DETAIL) DS-02 STA. 0+310.00
LS LIFT STATION

A
DIM DROP INLET MANHOLE
STA. 0+020.00

E
0+200

0+220
0+180
LS-02 PROVIDE BAR SCREEN INSTALLED U-DITCH & MANHOLE
INSIDE THE MANHOLE

0+240

0+260
0+000

TO TRAP DEBRIS

0+160
1+520

B
0+280
0+020

0+140
0+040
SUNSET ROAD NOTES:

0+060

0
0+120

0+30

T E
10
0+100

0+3
S 1) PROVIDE INLET AS EVERY 20M INTERVAL.
R O A D

0+080
2) U-DITCH W/ COVER SHALL HAVE A
AY

MINIMUM FREE BOARD OF 100mm.

I
HOLID
1+540

BORACAY RT

3) PROVIDE MANHOLE AT EVERY CHANGE

H
RESO

OF DIMENSIONS AND DIRECTIONS.

4) THE 1500mmØ HDPE PIPE IS USED TO

W
W PROVIDE EXTRA STORAGE.
M A I N

LED
N
INSTAL
FIESTA
1+560

TO BRGY.
0

PLAN
0+00

SCALE: 1:700m
SAN ROQUE
0
0+02
1+580

Cannot draw reference system - no coordinate system assigned

10
E L E V A T I O N

BEGINNING OF PROJECT
1-1200mmØ HDPE

LINK ROAD 04 STA. 0+105.00

STA. 0+000.00
END OF PROJECT
STA. 0+000

IE = 3.142

STA. 0+310.00
HDPE 1200mmØ

5
I.E = 1.143

INSTALLED

LS-02

PROVIDE
BAR SCREEN

1800mmØ HDPE
I.E=0.130
PROFILE
VERTICAL SCALE: 1:70m
HORIZONTAL SCALE: 1:700m

0
0+280 0+300 0+320 0+340
STATION 0+000 0+020 0+040 0+060
0+064
0+080
0+084
0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260
0+310
3.471

3.421

3.831
4.323

3.732

3.603

3.515

3.437

3.529

3.545

3.510

3.542

3.462

3.438

3.674

3.657

3.454
3.51
4.32

3.60

3.52

3.42

3.44

3.54

3.54

3.44
3.73

3.47

3.53

3.46

3.67

3.83

3.66

3.45
ORIGINAL GROUND

PIPE INVERT
0.111

0.731
0.130

2.135
2.335

2.524
0.743
1.727

ELEVATION
PIPE/U-DITCH 450x850mm 400x650mm
1500mmØ HDPE 1200mmØ HDPE
SIZE

SLOPE 0.0003 0.0006 0.0030 0.0021

LENGTH (m) 64.00m 20.00m 136.00m 90.00m

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(SUNSET ROAD SECTION)
ADAPTED FROM TIEZA DRAWINGS PP 13

05 07 33
TO BRGY.
BEGINNING OF PROJECT
SAN ROQUE

1+400
STA. 0+000.00

H
C
END OF PROJECT
STA. 0+324.25
A1 ROAD INTERSECTION

A
DS-03 (SEE DETAIL)

0+000

STA.0+255.08

1+380
0+ 020

STA.0+234.25

STA.0+269.08

STA.0+284.25
STA.0+214.25
E

STA.0+194.25
0+040

STA.0+304.25
0+060

STA.0+324.25
0+080
B

0+100

0+240

0+260
0+120

0+220

0+280
0+200
0+140
T E

0+180
0+160

5
0+300

0+324.2
0+320
1+360
PCT V ROAD
I

LEGEND:

R O A D
H

DRAINAGE LINE
PCT V ROAD
LS-03
W

1+340
FLOW DIRECTION STA. 0+309.00

400X500mm BASE X HEIGHT OF U-DITCH


W PROVIDE BAR SCREEN
INSIDE THE MANHOLE
NOTES: TO TRAP DEBRIS

1000mm DIAMETER OF HDPE PIPE

PNB

M A I N
1) PROVIDE INLET AS EVERY 20M INTERVAL.

HDPE HIGH-DENSITY POLYETHYLENE 2) U-DITCH W/ COVER SHALL HAVE A


MINIMUM FREE BOARD OF 100mm.
E

1+320
LS
S
LIFT STATION

TYARD
CY
3) PROVIDE MANHOLE AT EVERY CHANGE

N
CROW
REGEN
OF DIMENSIONS AND DIRECTIONS.
DIM DROP INLET MANHOLE

COUR
4) THE 1500mmØ HDPE PIPE IS USED TO TO BRGY.
INSTALLED U-DITCH & MANHOLE PROVIDE EXTRA STORAGE. PLAN
SCALE: 1:700m
SAN ROQUE

BDO
Cannot draw reference system - no coordinate system assigned
E L E V A T I O N

BEGINNING OF PROJECT
STA. 0+000.00
END OF PROJECT
STA. 0+324.25

STA.0+309
STA. 0+309
5

STA. 0+150

STA. 0+250
LS-03

FINISHED GROUND LEVEL = 3.50

PROVIDE
BAR SCREEN
0

PROFILE
VERTICAL SCALE: 1:70m
HORIZONTAL SCALE: 1:700m

-2
0+280 0+300
STATION 0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+150 0+160 0+170 0+180 0+200 0+220 0+240 0+260

4.161

4.161
4.161
4.586

4.164
3.897

3.727

3.599

3.578

3.457

3.455

3.567

3.526

3.660

3.538

3.575

3.509

3.720
3.51
3.90

4.59

4.16

3.60

3.54

3.72

4.16
3.73

3.58

3.46

3.46

3.57

3.53

3.66

3.58
ORIGINAL GROUND

PIPE INVERT

1.781
1.031
3.017

2.567

2.067
2.017
2.467

1.027
ELEVATION
PIPE/U-DITCH 500x600mm 550x700mm 600x750mm 1500mmØ HDPE
SIZE

SLOPE 0.0030 0.0040 0.0040 0.0003

LENGTH (m) 150.00m 100.00m 59.00m 15.00m

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(PCTV ROAD SECTION)
ADAPTED FROM TIEZA DRAWINGS PP 14

06 07 33
N

PS-04

A1 P L A N
- SCALE 1:500

A2 PROFILE
- SCALE 1:500

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN AND PROFILE
(PACKAGE 5 - END OF LUGUTAN ROAD TO PS4) ADAPTED FROM TIEZA DRAWINGS PP 15
BLOOMFIELD ROAD STA.0+000 - 0+183.15 07 07 33
A B C D E F

3 4
S-07 S-07

1'

1 ROOF DECK PLAN


S-06 SCALE 1:50

A B C D E F

2 3 4
S-07 S-07 S-07

1
S-07

2 PUMP LEVEL PLAN (ELEV. +4.02)


S-06 SCALE 1:50

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PLAN
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS S 16

01 08 33
A B C D E F

1 SECTION
S-07 SCALE 1:50

4 3 2 1' 1 1 2 3 4

4 3 1' 1

2 SECTION 3 SECTION 4 SECTION


S-07 SCALE 1:50 S-07 SCALE 1:50 S-07 SCALE 1:50

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
SECTION
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS S 17

02 08 33
3
A B C D E S-08 F

2
S-08

4
S-08

1 PILE CAP REINFORCEMENT DETAIL


S-08 SCALE 1:40

A B C D E F 4 3 2 1

4
-

2 SECTION 3 SECTION
S-08 SCALE 1:40 S-08 SCALE 1:40

4 TYPICAL DETAIL
S-08 SCALE 1:40

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
PILE CAP PLAN AND SECTIONS
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS S 18

03 08 33
1 COLUMN SCHEDULE
S-09 SCALE NTS

2 WALL DETAIL 1 3 WALL DETAIL 2 4 WALL DETAIL 3


S-09 SCALE 1:20 S-09 SCALE 1:20 S-09 SCALE 1:20

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
COLUMN SCHEDULE AND WALL REINFORCEMENT
DETAIL
ADAPTED FROM TIEZA DRAWINGS S 19

PUMPING STATION 4 04 08 33
GRID GRID GRID GRID

TYPICAL ELEVATION OF MOMENT FRAME GIRDER / BEAM TYPICAL BAR ARRANGEMENT

SCHEDULE OF BEAMS AND GIRDERS

1 RC GIRDER/BEAM SCHEDULE
S-10 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
RC GIRDER BEAM / BEAM SCHEDULE
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS S 20

05 08 33
1 TYPICAL SLAB ELEVATION
S-11 SCALE 1:20

TOP BAR REINFORCEMENT BOTTOM BAR REINFORCEMENT


2 TYPICAL PLAN OF TWO-WAY SLAB 3 TYPICAL PLAN OF TWO-WAY SLAB
S-11 SCALE 1:20 S-11 SCALE 1:20

R. C. S L A B S C H E D U L E

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
TYPICAL REINFORCEMENT DETAIL OF ONE &
TWO WAY SLAB ADAPTED FROM TIEZA DRAWINGS S 21
PUMPING STATION 06 08 33
A
S-12

A SECTION
S-12 SCALE 1:5

B E SPIRAL SPLICE DETAIL


S-12 S-12 SCALE 1:5

B SECTION
S-12 SCALE 1:5

CONFINEMENT RING
1 PILE REINFORCEMENT ELEVATION 2 PILE REINFORCEMENT LAYOUT C AND SPACER DETAIL F SPLICE DETAIL G SPACER DETAIL
S-12 SCALE 1:50 S-12 SCALE 1:50 S-12 SCALE 1:10 S-12 SCALE 1:10 S-12 SCALE 1:10

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
BORED PILE DETAILS
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS S
07 08
22
33
2 ELEVATION OF CYCLONE WIRE FENCE
S-13 SCALE 1:30

B
-

A PLAN
S-13 SCALE 1:30

4
S-13 5
6 S-13
S-13
3 DETAIL
S-13 SCALE 1:10 5 DETAIL
S-13 SCALE 1:10

3
S-13

B SECTION ELEVATION
S-13 SCALE 1:30 6 DETAIL
S-13 SCALE 1:10

4 DETAIL
S-13 SCALE 1:10

1 PUMP STATION ENTRANCE GATE DETAIL


S-13 SCALE AS SHOWN

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
ENTRANCE GATE DETAIL AND CYCLONE WIRE
FENCE DETAIL ADAPTED FROM TIEZA DRAWINGS S 23
PUMPING STATION 4 08 08 30
A B C D E F
GENERAL NOTES
THE PUMPS SHALL BE SELF-PRIMING CENTRIFUGAL TYPE PUMP.

THE SUCTION PIPE SHALL NOT BE PROVIDED WITH ANY VALVE.

FOR MAINTENANCE PURPOSES, THE PUMPING SYSTEM SHALL BE PROVIDED WITH PROGRAM SEQUENCER
SUCH THAT LEAD PUMP SHALL BE IDENTIFIED AND OPERATED EVERY WEEK.
4 5 6
- - -
PUMP OPERATOR TRAINING SHALL BE PROVIDED IN THE OPERATION AND MAINTENANCE OF THE PUMPING SYSTEM.

PUMP OPERATOR MANUAL SHALL BE PROVIDED. 1


OTHER THAN WATT HOUR METER, A PUMP LOG BOOK SHALL BE MAINTAINED.

A COLLAPSIBLE A-FRAME BOOM SHALL BE PROVIDED WITH 4 TONS CHAIN BLOCK.

A TRAILER MOUNTED DIESEL ENGINE DRIVEN CENTRIFUGAL PUMP SHALL BE PROVIDED.

3
-
1 GENERAL NOTES
M-01 SCALE NTS 3
4

2 PUMP LEVEL EL. +4.02


M-01 SCALE 1:75

A B C D E F

3 SECTION
M-01 SCALE 1:75

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
MECHANICAL PLAN, SECTION
AND GENERAL NOTES
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS M 24
01 02 33
4 3 2 1
1 2 3 4

4 SECTION
M-01 SCALE 1:50

4 3 2 1

6 SECTION
M-01 SCALE 1:50

7A ELEVATION 7B ISOMETRIC
M-02 SCALE NTS. M-02 SCALE NTS.

5 SECTION 7 MOBILE LADDER


M-01 SCALE 1:50
M-02 SCALE NTS.

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
SECTION 4, 5, 6 AND
MOBILE LADDER
PUMPING STATION 4
ADAPTED FROM TIEZA DRAWINGS M 25
02 02 33
F2
-

C2
-

N
C3
F1 P L A N
- SCALE 1:100
-

C1 PLAN C2 SECTION D DETAIL E3


-
- SCALE 1:15 - SCALE 1:15 - SCALE 1:10

C3 SECTION
SCALE 1:15
A MAIN ROAD - KALAHI ROAD INTERSECTION -
- SCALE NTS

C MANHOLE COVER DETAIL


- SCALE AS SHOWN

DETAIL OF ANGLE
E FRAME SUPPORT
B3 - SCALE 1:10
-

F2 TYPICAL DETAIL OF MANHOLE


- SCALE 1:30
B4
-

B2 SECTION
- SCALE 1:50

B2
-

B3 SECTION B4 SECTION
- SCALE 1:50
B1 P L A N - SCALE 1:50

- SCALE 1:50

F3 SECTION
B DETAIL OF JUNCTION BOX - SCALE 1:30

- SCALE AS SHOWN
F TYPICAL DETAIL OF MANHOLE
- SCALE AS SHOWN

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
MAIN ROAD-KALAHI ROAD
TYPICAL DETAILS OF JUNCTION BOX MANHOLE
ADAPTED FROM TIEZA DRAWINGS SD 26

CATCHBASIN 01 08 33
A3
-

A1 A2
- -
DETAIL OF ANGLE
B SECTION B1 D FRAME SUPPORT
SCALE 1:10 SCALE 1:10
- -

A PLAN
SCALE 1:15
-

C SECTION B2
A2 DETAIL OF U-DITCH (WIDTH=1300mm-1600mm) - SCALE 1:10
SCALE 1:15
-

D
-

C
-

A1 DETAIL OF U-DITCH (WIDTH=1200mm) A3 DETAIL OF U-DITCH (WIDTH=1200mm)


SCALE 1:15 SCALE 1:15
- -

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN DETAIL OF U-DITCH WITH COVER ADAPTED FROM TIEZA DRAWINGS SD 27

02 08 33
250 2500 250 2000 250
800 900 800 650 1100 EXISTING DPWH MANHOLE EXISTING DPWH MANHOLE

16mmØ @100
16mmØ @100 MAIN ROAD
PCTV ROAD

B3
EXISTING DPWH

1200

1200
MANHOLE 1200mmØ HDPE (EXISTING)
1200mmø

1788
HDPE
3134

300

250
92

SUBMERSIBLE SEWERAGE PUMP


1500

(NON-CLOG) (2-30 HP @ 70% EFFICIENCY)


1500mmØ HDPE 460V, 3-PHASE 3000
250 2500 250
92

650 250 1600

3000
B4
250

3000
250
200

250
B2 SECTION
100 150 250 2500 250
DS - 01 SCALE 1:50
12mmØ @100
16mmØ @100
BLOCKOUT FOR 12mmØ @100

1500mmØ HDPE
50 200mm PVC PIPE 16mmØ @100

Q=0.684cms
OPENING 16mmØ @100
25

25 25 250

2976
3476
100

50

BUTT WELD
1200mmø 1200mmø
12mmØx200mm HDPE HDPE
ANCHOR BAR
1500mmø
25

2038
1538

100x100x10 @ 200 O.C. HDPE


W.I. ANGLE
B2
E ANGLE FRAME SUPPORT DETAIL 16mmØ @100 1158
158
DS - 01 SCALE 1:10
250

250

250
1500
92 92
150 100
12mmØ @100 3000 12mmØ @100
1238

12mmØ @100 12mmØ @100

B1 PLAN B4 SECTION
2-Ø12mm
DS - 01 SCALE 1:50
200

DS - 01 SCALE 1:50

Ø10mm
400

200

3000
200

B3 SECTION 1200mmØ HDPE


DS - 01 SCALE 1:50 (EXISTING)

B DETAIL OF JUNCTION BOX


D DETAIL 4-Ø12mm
DS - 01 SCALE 1:10
DS - 01 SCALE AS SHOWN
Ø12mm

1.06x0.95m RCBC
C3 TO YAPAK MAIN ROAD TO MANOC-MANOC

(EXISTING)
900
Ø16mm TOP & BOTTOM
BAR HANDLE BARS @ 100mm O.C. 900

STEEL FRAME
Ø10mm TOP & 425 STEEL FRAME
75x75mmx6 W/
BOTTOM BARS 75x75mmx6 W/
10mmØx150mm BAR HANDLE
@ 150mm O.C. 10mmØx150mm 1200mmØ HDPE
425

C2 ANCHOR BAR @
ANCHOR BAR @ (EXISTING)
150 O.C.
150 O.C.

TO PCTV
850

200

200

PNB
HENANN LAGOON RESORT
Ø10mm TOP & BOTT
BARS @ 150mm O.C.
Ø10mm TOP & Ø16mm TOP &
425

Ø16mm TOP & BOTTOM BARS BOTTOM BARS


BOTTOM BARS @ 150mm O.C. @ 100mm O.C.
@ 100mm O.C. BAR HANDLE

C2 SECTION C3 SECTION
DS - 01 SCALE 1:15 DS - 01 SCALE 1:15

C1 SECTION
DS - 01 SCALE 1:15
C MANHOLE COVER DETAIL A MAIN ROAD - PCTV ROAD INTERSECTION
DS - 01 SCALE AS SHOWN DS - 01 SCALE 1:150

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
MAIN ROAD - PCTV ROAD INTERSECTION AND
TYPICAL DETAILS OF JUNCTION BOX MANHOLE
ADAPTED FROM TIEZA DRAWINGS SD 28

03 08 33
250 2500 250 2000 250
800 900 800 650 1100 EXISTING DPWH MANHOLE EXISTING DPWH MANHOLE

16mmØ @100
16mmØ @100 MAIN ROAD
BORACAY REGENCY ROAD

B3
EXISTING DPWH

1200
1496
MANHOLE 1200mmØ HDPE (EXISTING)
1200mmø

1796
HDPE
3279

300
3621

242
92

Q=0.896 cms B4 SUBMERSIBLE SEWERAGE PUMP


(NON-CLOG) (2-30 HP @ 70% EFFICIENCY)
1500

460V, 3-PHASE
1500mmØ HDPE
92

3000

3000
3000
250

250 2500 250


250 2500 250
16mmØ @100
250 BLOCKOUT FOR 650 250 1600
200

B2 200mm PVC PIPE 16mmØ @100


100 150 SECTION
DS - 02 SCALE 1:50
OPENING

250
250
50

1500mmØ HDPE
25

Q=0.896 cms
25 25 1200mmø 1200mmø
HDPE HDPE 12mmØ @100
2038
1538
100

12mmØ @100
50

BUTT WELD

16mmØ @100
12mmØx200mm
ANCHOR BAR
25

100x100x10 @ 200 O.C. 16mmØ @100


250

3029
W.I. ANGLE

3621
E ANGLE FRAME SUPPORT DETAIL 12mmØ @100
DS - 02 SCALE 250 1:10 B2
12mmØ @100 1500mmø
1583

150 100 HDPE


200

1158 157

92 1500 92
2-Ø12mm
200

3000

250
12mmØ @100
Ø10mm 3000
B1
400

12mmØ @100 PLAN


DS - 02 SCALE 1:50
B3 SECTION B4 SECTION
200

DS - 02 SCALE 1:50 DS - 02 SCALE 1:50

B DETAIL OF JUNCTION BOX


DS - 02 SCALE AS SHOWN
4-Ø12mm C3
Ø12mm
900
Ø16mm TOP & BOTTOM
D DETAIL BAR HANDLE BARS @ 100mm O.C.
DS - 02 SCALE 1:10 TO YAPAK MAIN ROAD TO MANOC-MANOC

900

425 STEEL FRAME STEEL FRAME

425
75x75mmx6 W/ Ø10mm TOP & C2
BAR HANDLE 75x75mmx6 W/
10mmØx150mm BOTTOM BARS
10mmØx150mm
ANCHOR BAR @ @ 150mm O.C.
ANCHOR BAR @
150 O.C. 150 O.C.

850
Ø10mm TOP & BOTT
200

200

BARS @ 150mm O.C.

TO REGENCY
425
CT

Ø10mm TOP & Ø16mm TOP &


BOTTOM BARS BOTTOM BARS Ø16mm TOP &
@ 150mm O.C. @ 100mm O.C. BOTTOM BARS BORACAY SUNSET RESORT
@ 100mm O.C. BAR HANDLE
C3 SECTION C1
C2 SECTION SECTION
DS - 02 SCALE 1:15
DS - 02 SCALE 1:15 DS - 02 SCALE 1:15

C A MAIN ROAD - REGENCY ROAD INTERSECTION


MANHOLE COVER DETAIL
DS - 02 SCALE 1:150
DS - 02 SCALE AS SHOWN

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
MAIN ROAD - BORACAY REGENCY ROAD
INTERSECTION AND TYPICAL DETAILS OF JUNCTION ADAPTED FROM TIEZA DRAWINGS SD 29
BOX MANHOLE 04 08 33
250 2500 250 2000 250
800 900 800 900 1100
EXISTING DPWH MANHOLE EXISTING DPWH MANHOLE
16mmØ @100
16mmØ @100 MAIN ROAD
SUNSET ROAD

EXISTING DPWH B3

1200
MANHOLE
1200mmø 1200mmØ HDPE (EXISTING)

1788
HDPE

300

250
4212

B4

3000
92

3000
2500 250
1500

5
250 2500 250
1500mmØ HDPE 650 250 1600
16mmØ @100
92

BLOCKOUT FOR
200mm PVC PIPE 16mmØ @100
OPENING
SUBMERSIBLE SEWERAGE PUMP
250

(NON-CLOG) (2-30 HP @ 70% EFFICIENCY)

250

250
460V, 3-PHASE

12mmØ @100 1200mmø 1200mmø


200

250 B2 SECTION

1500mmØ HDPE
12mmØ @100 HDPE HDPE

Q=1.165cms
DS - 03 SCALE 1:50
100 150

2038
1538
50
16mmØ @100
25

25 25 16mmØ @100

250
4054
4554
100

50

BUTT WELD 12mmØ @100


12mmØ @100
12mmØx200mm B2
ANCHOR BAR
25

100x100x10 @ 200 O.C.

2516
W.I. ANGLE
1500mmø
HDPE
E ANGLE FRAME SUPPORT DETAIL 1158 158
DS - 03 SCALE 1:10
92 1500 92
250

250
150 100 3001

B1 PLAN
12mmØ @100
DS - 03 SCALE 1:50

200
12mmØ @100 3000
2-Ø12mm
200

B3 SECTION B4 SECTION
DS - 03 SCALE 1:50 DS - 03 SCALE 1:50 1200mmØ HDPE
Ø10mm (EXISTING)
400

B DETAIL OF JUNCTION BOX


C3
200

DS - 03 SCALE AS SHOWN

900

1200mmØ HDPE
TO YAPAK MAIN ROAD TO MANOC-MANOC

(PROPOSED)
900 Ø16mm TOP & BOTTOM
BAR HANDLE BARS @ 100mm O.C.
D DETAIL 4-Ø12mm STEEL FRAME
DS - 03 SCALE 1:10 75x75mmx6 W/ Ø10mm TOP &
Ø12mm BOTTOM BARS
10mmØx150mm
@ 150mm O.C.
ANCHOR BAR @

425
425 STEEL FRAME 150 O.C. C2
75x75mmx6 W/
BAR HANDLE
10mmØx150mm
ANCHOR BAR @
200

850
150 O.C.

TO BORACAY SUNSET
Ø10mm TOP & BOTT
200

Ø16mm TOP & BARS @ 150mm O.C. HENANN LAGOON RESORT

425
BOTTOM BARS
@ 100mm O.C. BAR HANDLE
Ø10mm TOP & Ø16mm TOP &
BOTTOM BARS BOTTOM BARS C2 SECTION
@ 150mm O.C. @ 100mm O.C. DS - 03 SCALE 1:15
BORACAY HOLIDAY RESORT

C3 SECTION C1 SECTION
DS - 03 SCALE 1:15 DS - 03 SCALE 1:15

C MANHOLE COVER DETAIL A MAIN ROAD - SUNSET ROAD INTERSECTION


DS - 03 SCALE AS SHOWN
DS - 03 SCALE 1:150

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
MAIN ROAD - SUNSET ROAD INTERSECTION AND
DETAIL OF JUNCTION BOX MANHOLE
ADAPTED FROM TIEZA DRAWINGS SD 30

05 08 33
EXISTING STRUCTURES
EXISTING STRUCTURES

200 650 200

150
CONCRETE CURB

150
CONCRETE CURB 2% SLOPE

200mm PCCP

200
1800
200
TYPICAL CROSS SECTION - RCBC
SCALE NTS

EXISTING STRUCTURES
EXISTING STRUCTURES

200 650 200

150
CONCRETE CURB
150

CONCRETE CURB 2% SLOPE

200mm PCCP
200

MANHOLE
1800

HDPE
200

TYPICAL CROSS SECTION - HDPE/MANHOLE


SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CONCURRED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAY C. QUINTILLA
ENGINEER I

REGIONAL OFFICE VI BORACAY DRAINAGE IMPROVEMENT PROJECT TYPICAL CROSS SECTION DS 31


BORACAY ISLAND, MALAY, AKLAN
PREPARED: SEVERO A. RUIZ MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E TIBURCIO DL CANLAS MARK T. LAPID
FORT SAN PEDRO, ILOILO CITY RCBC AND HDPE/MANHOLE ENGINEER IV OIC, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF OPERATING OFFICER - TIEZA
06 08 33
EVAN NIEL S. FUENTES
ENGINEER III DATE: DATE: DATE: DATE: DATE:
TOP OF PIPE TO BE
MARKED "TOP" 10mmØ
3 2
DS-7 DS-7

W W W

mm
6mmØ m 10mmØ

25
25m
P P P P

.
D

D
I.

I.

I.
)

)
(d

(d

(d
I.D.

I.D.

W
NOTE :
BLUE PAINT - STANDARD STRENGTH RCPC
RED PAINT - EXTRA STRENGTH RCPC

TWO LINES CIRCULAR ONE LINE OF ELLIPTICAL ONE LINE CIRCULAR


REINFORCEMENT (SECTION) REINFORCEMENT (SECTION) REINFORCEMENT (SECTION)
ONE LINE CIRCULAR OR DS-7 SCALE NTS
SCALE NTS SCALE NTS
DS-7 DS-7
1A ELLIPTICAL REINFORCEMENT 1B TWO LINES OF CIRCULAR REINFORCEMENT
DS-7 SCALE NTS DS-7 SCALE NTS NOTE : JOINT MORTAR ONE (1) PART
1. THE SPACING (CENTER TO CENTER) OF ADJACENT RINGS OF 1. FOR 63mm OR LESS, WALL THICKNESS BY VOLUME PORTLAND
CIRCUMFERENTIAL REINFORCEMENT IN A CASE SHALL NOT EXCEED 101mm. PROTECTIVE COVERING, SHALL BE 18mm. CEMENT AND TWO (2) PARTS
2. 910mm OR MORE WALL THICKNESS THE BELL OR THE SPINGOT OF 2. FOR 63mm OR GREATER WALL THICKNESS APPROVED SAND W/
CIRCULAR REINFORCEMENT SHALL BE WATER AS TO NECESSARY
CLASSIFICATION OF CIRCULAR REINFORCEMENT THE JOINT SHALL CONTAIN AT LEAST ONE CIRCUMFERENTIAL REINFORCEMENT
3. FOR WELDED CONNECTION, THE MINIMUM LAP REQUIREMENT SHALL PLACED 35 TO 50% OF WALL THICKNESS OBTAIN THE ACQUIRED
SCALE NTS FROM THE INNER SURFACE CONSISTENCY.
DS-7
4. FOR WIRE CONNECTION, THE MINIMUM LAP REQUIREMENT SHALL R100
BE 20 x DIAMETER (DEFORMED BAR)
FINISHED GRADE 40 x DIAMETER (PLAIN BAR)
PERMISSIBLE VARIATION :
1. INTERNAL DIAMETER (I.D.) OF 305 TO 610 MILLIMETER
PIPE SHALL VARY NOT MORE THAN +1.5% FROM BOTTOM FACE OF "E"
THE DESIGN DIAMETER THE I.D. OF 686 TO 2743mm W/ PAVEMENT WORK
DEPTH OF FILL = bc + 15cm ROLLER COMPACTED
PIPE SHALL VARY NOT MORE THAN +1% OR 9.50mm BACKFILL (201)

Ø
FOR SMALL PIPES OR bc + 75cm EMBANKMENT
WHICHEVER IS GREATER, FROM THE DESIGN DIAMETER.

12
FOR 700-INCH OR LARGER PIPES (COMPACTED BASE COURSE MATERIAL)
200

2 0
2. WALL THICKNESS - THE WALL THICKNESS SHALL NOT BE LESS bc = outside diameter of pipe
THAN THAT SHOWN IN THE DESIGN BY MORE THAN 5%
bc + 15 cm
OR 4.8Om WHICHEVER IS GREATER.

3. LENGTH OF TWO OPPOSITE SIDES - VARIATION IN LAYING


LENGTHS OF TWO OPPOSITE SIDES OF PIPE SHALL NOT GROUND COMPACTED
BE MORE THAN 10.40mm/m OF DIAMETER, WITH A ROLLER COMPACTED EMBANKMENT GRANULAR BACKFILL
MAXIMUM OF 16mm IN ANY LENGTH OF PIPE. STEP 1 - CONSTRUCTION COM- STEP 2 - TRENCH THROUGH STEP 3 - COMPLETE EMBANKMENT
PACTED EMBANKMENT TO THIS COMPACTED EMBANKMENT IN USUAL MANNER
4. LENGTH OF PIPE - THE UNDERRUN IN LENGTH OF A SECTION ELEVATION 15cm ABOVE AND INSTALL PIPE BACKFILL
OF PIPE SHALL NOT BE MORE THAN 10.40mm/m WITH TOP OF PROPOSED PIPE WITH COMPACTED GRANULAR
CUT LINE FOR PAYMENT
OF STRUCTURAL EXC 5A PLAN 5B SECTION
A MAXIMUM OF 13mmIN ANY LENGTH OF PIPE. MATERIALS DS-7 SCALE NTS.
DS-7 SCALE NTS
CALIFORNIA METHOD - A 7B
C
A

DS-7

P P 6A METHODS PIPE INSTALLATION 6B EXCAVATION FOR PIPE PIPE COLLAR DETAIL


DS-7 SCALE NTS DS-7 SCALE NTS DS-7 SCALE NTS.

100
EXISTING RCP NEW RCP
14MPa CONC. OR BETTER
MIN = bc
4 bc ACCURATELY SHAPED
bc + 10 CM
TO FILL PIPE
THOROUGHLY MIN = bc/10
dc
D

100
TAMPED EARTH

100
t
pbc
150 150

I.D.
6-10mmØ BARS

EARTH 10mmØ BAR 300


CUSHION

t
100
EARTH OR ROCK ACCURATELY SHAPED EARTH OR ROCK
TO FILL PIPE 4cm PER METER
MIN= 41 INSIDE DIAMETER OF H WHEN H=5m
D
B

20cm WHEN H=5m 7B SECTION 7A PLAN


6C CONCRETE CRADDLE BEDDING 6D FIRST CLASS BEDDING DS-7 SCALE NTS
ALL DIMENSION ARE DS-7 SCALE NTS
TONGUE TONGUE DS-7 SCALE NTS DS-7 SCALE NTS
IN MILLIMETERS
P A B C D 6E ORDINARY BEDDING
DS-7 SCALE NTS
45/51 23 20 20 23
TYPICAL BEDDING FOR PROJECTING CONDUITS
63 33 30 30 33
DS-7 SCALE NTS
CONNECTION DETAILS OF RCPC EXTENSION
DS-7 SCALE NTS

SAVE OVERFILLS ON COMMERCIAL GRAVITY-CAST MAXIMUM


STANDARD STRENGTH REINFORCED CONCRETE PIPE CULVERTS EXTRA STRENGTH REINFORCED CONCRETE PIPE CULVERTS
REINFORCED CONCRETE PIPES
SIZE OF PIPE STRENGTH TEST STRENGTH TEST SPECIFIED CRACKING D- SAFE HEIGHTS PIPE COVER
CONCRETE 247 kg/cm² (3,500 lb/in²) CONCRETE 317 kg/cm² (4,500 lb/in²) REQUIREMENTS kg/m OF CONCRETE 317 kg/cm² (4,500 lb/in²) REQUIREMENTS kg/m OF (d) IN METERS (H)
MINIMUM COVER
LOAD, KILOGRAM PER
PIPE PIPE
INSIDE LINEAR METER PER PAVEMENT (AS OR PCC)
WALL DEPT WALL WALL
DIAMETER DIAMETER
THICKNESS
TONGUE GROOVE
H MINIMUM REINFORCEMENT THICKNESS
TONGUE GROOVE DEPTH MINIMUM REINFORCEMENT THREE-EDGE BEARING THICKNESS
TONGUE GROOVE DEPTH MINIMUM REINFORCEMENT THREE-EDGE-BEARING MILLIMETER OF PIPE CLASS II STRENGTH RCPC CLASS IV STRENGTH RCPC
Ø (in) Ø (mm) (mm) (mm) (mm)
(mm)
cm²/m OF PIPE (mm) (mm) (mm) (mm) cm²/m OF PIPE * METHOD * (mm) (mm) (mm) (mm) cm²/m OF PIPE METHOD DIAMETER FILL
CIRCULAR ELLIPTICAL CIRCULAR ELLIPTICAL CIRCULAR ELLIPTICAL (mm) CLASS II CLASS IV METHOD-A METHOD-B METHOD-A METHOD-B
0.00025mCRAC ULTIMATE 0.00025mCRAC LOAD
I.D. I.D. W A B C E P REINFORCEM REINFORCEM W A B C E P REINFORCEM REINFORCEM W A B C E P REINFORCEM REINFORCEM
K LOAD LOAD K LOAD ULTIMATE
ENT ENT ENT ENT ENT ENT
12 300 57 344 363 351 370 44 1 LINE 1.48 51 495 514 502 521 44 1 LINE 1.69 3.355 5.218 - - - - - 610 (24) 7.32 9.77 8.4 NO LIMIT 10.0 NO LIMIT
15 380 57 344 363 351 370 44 1 LINE 1.90 51 495 514 502 521 44 1 LINE 2.33 3.914 6.060 - - - - -
18 460 64 508 527 514 534 44 1 LINE 2.54 1 LINE 2.12 51 495 514 502 521 44 1 LINE 2.96 4.473 6.709 - - - - - 760 (30) 6.59 9.77 7.8 NO LIMIT 10.2 NO LIMIT
24 610 76 673 692 680 699 44 1 LINE 3.60 1 LINE 2.75 64 660 680 667 686 44 1 LINE 4.23 1 LINE 3.60 4.473 7.454 76 673 692 680 699 44 1 LINE 5.50 1 LINE 4.23 5.964 8.945
30 760 89 858 857 845 864 51 1 LINE 4.66 1 LINE 3.60 76 825 845 832 851 51 1 LINE 5.92 1 LINE 4.44 5.032 8.573 89 838 857 845 864 51 1 LINE 6.56 1 LINE 5.08 7.454 11.182 919 (36) 6.59 9.77 7.6 NO LIMIT 10.3 NO LIMIT
ED
2 LINES EACH 2 LINES 2 LINES
36 910 102 1003 1022 1010 1029 64 1 LINE 3.81 86 988 1007 994 1013 64 1 LINE 4.66 6.038 9.840 102 1003 1022 1010 1029 64 1 LINE 5.92 8.945 13.418 1070 (42) 6.59 9.77 7.3 30.5 10.4 NO LIMIT
3.81 EACH 4.66 EACH 5.92 (bc)
2 LINES EACH 2 LINES 2 LINES STANDARD STRENGTH PIPES (CLASS II)
42 1070 114 1168 1187 1175 1194 64 1 LINE 4.44 95 1150 1165 1156 1175 64 1 LINE 5.29 7.045 10.958 114 1168 1187 1175 1194 64 1 LINE 6.98 10.436 15.655 1220 (48) 6.59 9.77 7.1 11.8 10.5 NO LIMIT
4.44 EACH 5.29 EACH 6.98 FILL 1/2 E.D. FOR FLEXIBLE PAVEMENT
2 LINES EACH 2 LINES 2 LINES 1520 (60) 4.88 7.32 7.0 9.6 10.5 NO LIMIT 0.15 FOR RIGID PAVEMENT
48 1220 127 1334 1353 1340 1359 64
5.29
1 LINE 5.29 108 1315 1334 1321 1340 64 1 LINE 6.56 8.051 11.927 127 1334 1353 1340 1359 64 1 LINE 8.04 11.927 17.891
EACH 6.56 EACH 8.04
EXTRA STRENGTH PIPES (CLASS IV)
2 LINES EACH 2 LINES 2 LINES
NOTE : IN PRACTICAL APPLICATION OF THE TABLES THE OVERFILL VALUES ARE
60 1520 152 1664 1683 1670 1690 64
6.98
1 LINE 6.98 127 1639 1658 1645 1664 64 1 LINE 8.68 8.945 14.909 152 1664 1683 1670 1690 64 1 LINE 10.58 13.418 22.364 NOT TO BE CONSIDERED CLOSER THAN THE NEAREST 50cm; DECIMALS OF A METER FILL 0.15m FOR RIGID AND FLEXIBLE PAVEMENT
EACH 8.68 EACH 10.58
ARE SHOWN TO FACILITATE PLOTTING OF DESIGN CURVES; IF DESIRED.

* THE DISTANCE FROM CENTERLINE OF THE REINFORCEMENT TO THE NEAREST SURFACE OF THE CONCRETE HAS BEEN ASSUMED AS 32mm FOR PIPES WITH A SHELL THICKNESS OF 64mm OR MORE
* TEST LOADS FOR SAND-BEARING TEST SHALL BE ONE-HALF TIMES THOSE SPECIFIED IN THIS TABLE FOR THE THREE - EDGE BEARING TEST.

PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY
BORACAY DRAINAGE IMPROVEMENT PROJECT
BORACAY ISLAND, MALAY, AKLAN
STANDARD DETAILS OF REINFORCED CONCRETE
PIPE CULVERT (RCPC)
ADAPTED FROM DPWH STANDARDS SD 32
07 08 33
2400 (8ft.)

ON NO
SI
S

UA
I
COMMISSION ON AUDIT

MM

TI D
CO
NOTE : THE EXPENSES INCURRED IN THE INSTALLATION OF BILLBOARD IS (PROVINCE AND CITY)

UE R

E S
BP

I N
IL

P
C
INCLUDED IN THE OCM PER DO. 12, SERIES 2011

P
F

I
O
T L
EH I
P H

Project: Cost:
2438mm (8ft.) Fund Source:
Location:
WHITE BACKGROUND Implementing Agency:
Development Partner:

2400 (8ft.)
Contractor/Supplier:
Brief Description of Project:
1219mm (4ft.)

BLACK TEXT

Project Details:
Project Date Project Status
Target Date Cost
Duration Percentage of As of Date Remarks
Started of Incurred to
Completion (Date) Completed
Completion Date

SEE TRAIN LOGO


AT DPWH WEBSITE
For Particulars or complaints about this project, please contact the Regional Office or Cluster which has audit
NOTE: jurisdiction on this project.
COA Regional Office No./Cluster: _______________________________
For Source of Fund, state if DPWH Regular Budget, Priority Development
Address: ___________________________________________________
Assistance Fund, DepEd/DA/DAR Budget, Calamity Fund, MVUC Fund, etc. FACE OF Contact No.: _____________________ or Text COA Citizen's Desk at 0915-539-1957
BILLBOARD

2400 (8ft.)

EDGE OF ROAD
45°

TRAFFIC DIRECTION
DISPLAY AREA
DISPLAY AREA ROAD (TARPAULIN ON 2400 X 2400 X 5 MARINE PLYWOOD)

2400

2400
50 x 50 HORIZONTAL ORIENTATION 50 X 50 HORIZONTAL 50 x 50 HORIZONTAL
COCO LUMBER COCO LUMBER COCO LUMBER
DISPLAY AREA
1200

1200
(1200 X 2400 X 12 MARINE FLYWOOD)
1000

50 x 75 HORIZONTAL
50 x 50 COCO LUMBER 50 x 50
1000

1000

1000
WOODEN STAKE WOODEN STAKE

GROUND LEVEL GROUND LEVEL


500

500
500

500
1000 2400 1000 2400

TYPICAL FRAME ELEVATION


FRONT ELEVATION TYPICAL FRAME ELEVATION FRONT ELEVATION
( OPTION 1)
SCALE 1 : NTS.

STANDARD PROJECT BILLBOARD


(DPWH and COA)
PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BORACAY WATER DRAINAGE PROGRAM PHASE II
PACKAGE 3, 4, 5 AND 1a SD 33
REGIONAL OFFICE VI
FORT SAN PEDRO, ILOILO CITY (Boracay Drainage Improvement Project Phase II) STANDARD PROJECT BILLBOARD
ADAPTED FROM DPWH STANDARDS 08 08 33
BORACAY ISLAND, MALAY,AKLAN